Monthly Reports 2014-10 (Oct)
MMOOOONNTTHH
O
Cap
HHLLYY PPRR
T
Octob
Strong S
pital Impr
P
fs
RROOGGRREE
Through
ber 20
Schools B
rovement
repared by
s3|Hodges
EESSSS RREE
014
Bond
t Projects
EEPPOORRTT
s
Pa
TT
age | 1
TABLE O
Executive
At
Capital Pro
G
G
Pa
Pa
Pa
Pa
Completed
G
G
G
G
Pa
Pa
Pa
Jo
J.
J.
Te
D
Fa
O
Pr
Jo
G
J.
Fa
El
Pa
G
G
M
Te
Inactive Ca
G
H
H
El
Appendix
Ex
OF CONTEN
Summary
ttachment 1 –
ojects
unn High Scho
unn High Scho
alo Alto High S
alo Alto High S
alo Alto High S
alo Alto High S
d Capital Proje
unn High Scho
unn High Scho
unn High Scho
unn High Scho
alo Alto High S
alo Alto High S
alo Alto High S
ordan Middle S
L. Stanford Mid
L. Stanford Mid
erman Middle
uveneck Eleme
airmeadow Ele
hlone Element
roperty Acquis
ordan Middle S
unn High Scho
L. Stanford Mid
airmeadow Ele
lementary Clas
alo Alto High S
unn High Scho
unn High Scho
Middle School P
echnology
apital Projects
arland Elemen
igh School Ma
oover Element
lementary Clas
xhibit A – Bond
NTS
Consolidated
ool – Traffic Sig
ool – Central Bu
School – Perfor
School – Scienc
School – Indoor
School – Buildin
ects
ool – New Class
ool – New Gym
ool – Existing G
ool – E and K (L
School – Athlet
School – Hayma
School – New C
School
ddle School
ddle School – L
School
entary School –
ementary Scho
tary School
sition – 525 San
School – Interim
ool – Air Condit
ddle School – I
ementary Scho
ssroom Improv
School – Multi‐
ool – Industrial
ool – Aquatic Ce
Pre‐Design
ntary School
ster Plan
tary School
ssroom Improv
d Project List
Expenditure R
nal Replaceme
uilding Project
rming Arts Cen
ce Building Add
r PE and Athlet
ng 500 Renova
sroom Building
nasium
ymnasium Mo
31 and MS) Bu
ic Stadium Imp
arket and Tow
Classroom Build
Landscape and
– New Classroo
ol – New Class
n Antonio Rd
m Classrooms
tioning of Exist
Interim Classro
ol – Portable R
vements – Inte
use Field
Arts Renovatio
enter
vements
eport
ent (Phase I‐ Im
ter
dition
tic Facilities
tion
g and World La
odernization
uildings Renova
provements
er Building Imp
ding and Medi
d Site Improvem
om Buildings a
sroom Building
ting Buildings
ooms
Relocation
ractive Whiteb
on
mprovements)
anguages Build
ation
provements
a Arts
ments
and Moderniza
gs and Modern
board & Sound
ing
ation
nization
d Assist System
Pa
page 3
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
m page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
age | 2
Gunn High
The bid op
4, 2014. B
December
Gunn High
DLM conti
classrooms
site visit o
schematic
Palo Alto H
Alten Cons
access roa
basement
paving the
Palo Alto H
The constr
constraints
submittal t
Palo Alto H
Jeremiah T
comments
Palo Alto H
DLM prese
received a
with stake
Facilities S
2014. DLM
COMPLETE
Gunn High
The new M
Building cla
Gunn High
The new g
The tennis
Gunn High
The moder
Gunn High
Students o
September
h School –Traff
pening for thet
Board award is
2014.
h School – Cent
inued design
s and student
of the Health a
design approv
High School – P
struction comp
d. Finish gradin
footings is in p
access road in
High School – S
ruction schedu
s and access t
to DSA planned
High School – I
Tolbert Archite
s. Completion o
High School – B
ented the rev
pproval on Oc
holder groups
Steering Comm
M anticipates re
ED CAPITAL PR
h School – New
Math and Eng
assrooms were
h School – New
gymnasium wa
courts were c
h School – Exist
rnized Bow gym
h School – E an
occupied E an
r 15, 2014.
fic Signal Repla
traffic signal re
s scheduled fo
tral Building P
development
activities spac
and Wellness
val will be revie
Performing Art
pleted rough gr
ng of the build
progress. Alten
n November 20
Science Buildin
ule has been a
to the site. D
d for June 2015
Indoor PE and
ects received D
of a bid set for
Building 500 R
vised conceptu
tober 14, 2014
and will conti
mittee for thei
eturning to the
ROJECTS
w Classroom Bu
lish Building w
e occupied in F
w Gymnasium
s occupied on
ompleted Aug
ting Gymnasiu
m was occupie
nd K (L‐31 and
nd K buildings
EXECUT
acement (Phas
eplacement pro
or November 1
roject
of the two‐st
es. DLM review
Center at Bal
ewed with the
ts Center (PAC
rading, and has
ing pad, excav
n will commenc
014.
ng Addition
adjusted to oc
DLM will resu
5.
Athletic Facili
DSA sign‐off in
pricing is antic
Renovation (Lib
ual design to
4 to proceed w
inue meetings
r recommenda
e BOE in Janua
uilding and Wo
was occupied
February, 2013
June 7, 2013 a
ust 27, 2013.
um Modernizat
ed by the camp
MS) Buildings
on August 1
IVE SUMM
se I ‐ Parking a
oject at Arastr
18, 2014 and t
tory building t
wed the plans
boa High Scho
Board in Dece
C)
s formed and p
vation, rebar pl
ce forming wal
ccur after cons
me work on c
ties
September, a
cipated to be r
brary)
the Board of
with schematic
through Nove
ation to the B
ry 2015 for sch
orld Language
by staff and s
3.
and PE classes
tion
pus on Novemb
Renovation
3, 2014, and
MARY
and Drop‐Off Im
radero and Mi
the target com
that will hous
with staff in S
ool in San Fra
mber 2014.
poured concre
lacement, and
lls, running uti
struction of th
construction d
and continues
ready for Vance
Education (BO
design. DLM
ember 2014. D
BOE for schem
hematic design
s Building
students on A
s were held in
ber 4, 2013.
the flex room
mprovements)
iranda is sche
mpletion is ant
se guidance a
September 201
ancisco. A prog
ete curbs and g
pouring concr
lities through t
he new gymna
documents in
to address con
e Brown in mid
OE) on Septe
has commenc
DLM will review
matic design ap
n approval.
ugust 15, 201
the new gym
m in building
Pa
)
duled for Nove
ticipated to oc
nd counseling
14, and condu
gram change
gutters for the
rete for the
the building, a
asium, due to
January 2015
nstructability r
d‐November 2
mber 28, 201
ced schematic d
w the plans wi
pproval Decem
3. World Lan
on August 15,
E was occupi
age | 3
ember
ccur in
g, new
cted a
to the
nd
space
5, with
review
014.
14 and
design
ith the
mber 2
nguage
2013.
ed on
Palo Alto H
The conces
the Fall 20
Palo Alto H
All Trusty B
Palo Alto H
Move in a
closeout is
Jordan Mid
Students o
J.L. Stanfo
Students o
J.L. Stanfo
Scapes com
Terman M
Students
moderniza
Duveneck
All building
Fairmeado
Students o
525 San An
This site ha
Ohlone Ele
Move‐in to
new buildi
Jordan Mid
The portab
Gunn High
Best Contr
summer 20
J.L. Stanfo
Coulter Co
Fairmeado
Relocation
High School – A
ssions building
13 football sea
High School – H
Builders compl
High School – N
nd occupancy
s nearly comple
ddle School
occupied all new
rd Middle Sch
occupied all new
rd Middle Sch
mpleted the pr
iddle School
occupied the
ation was comp
Elementary Sc
gs were substa
ow Elementary
occupied all new
ntonio Road –
as been leased
ementary Scho
o the new bui
ng on January
ddle School ‐ I
bles were insta
h School – Air C
racting Service
011.
rd Middle Sch
onstruction com
ow Elementary
n of the portab
Athletics Stadi
g, track re‐surfa
ason.
Haymarket an
leted the insta
New Math/Soc
of both build
ete, with DSA c
w and modern
ool
w and modern
ool – Landscap
roject on sched
new instruct
pleted in Octob
chool – New C
antially comple
y School – New
w and modern
Site Acquisitio
d to Athena Aca
ool – New Clas
lding and othe
3, 2012.
nterim Classro
alled and move
Conditioning o
es Inc. comple
ool ‐ Interim C
mpleted the wo
y School – Port
le was comple
ium Improvem
acing, new orn
d Tower Build
llation of the n
cial Sciences B
ings occurred
closeout in pro
nized buildings
nized buildings
pe and Sitewo
dule in the fall
tional spaces
ber 2013.
lassroom Build
ete and occupie
w Classroom Bu
nized buildings
on
ademy.
ssroom Buildin
er existing clas
ooms
ed into for fall 2
of Existing Build
eted the instal
Classrooms
ork on the relo
table Relocatio
te and occupie
ments
namental fence
ing Improvem
new windows o
Building and M
in July 2014.
ogress.
in fall 2013.
in fall 2013.
rk Improveme
2013.
and modern
dings and Mod
ed on August 1
uilding and Mo
in fall 2013.
ng and Modern
ssrooms occur
2011. DSA clos
dings
llation of air c
ocated portable
on
ed on August 8
e, signage and
ments
on August 9, 20
Media Arts Buil
Taisei has co
ents
ized buildings
dernization
11, 2014.
odernization
nization
rred in Decem
seout received
conditioning u
es in August 20
8, 2011.
entry lighting w
013.
ding
ompleted their
s in fall 2013
ber 2011. Stu
d November 19
units and cool
011.
Pa
were complete
r work, and co
3. The cafet
udents occupie
9, 2012.
roof coating
age | 4
ed for
ontract
torium
ed the
in the
Elementar
Installation
classrooms
Palo Alto H
The fields w
2011.
Gunn High
This facility
Gunn High
This facility
Middle Sch
These proj
Technolog
Equipment
year.
INACTIVE C
Garland El
The Board
elementar
High Schoo
The Board
closed.
Hoover Ele
This projec
Elementar
The projec
October 14
Consent 4
Renovation
Consent 5
Testing and
October 28
Consent 5
Consent 6
ry Classroom Im
n of SmartBoa
s and libraries
High School – M
were available
h School – Indu
y was available
h School – Aqu
y was available
hools Pre‐Desi
ects for pre‐de
gy
t orders have
CAPITAL PROJ
ementary Sch
of Education
y schools.
ol Master Plan
of Education
ementary Scho
ct has been put
ry Classroom Im
ct has been pla
4, 2014
4 – Approval
n Project at Pa
– Authorizati
d Inspection Se
8, 2014
– Approval of
– Authorizatio
mprovements
ards and Ligh
in April 2011.
Multi‐use Field
e for play on Fe
ustrial Arts Add
e for instructio
atic Center
e for use in July
ign – Jordan, J.
esign work hav
arrived and w
ECTS
ool Renovatio
has put new d
n
(BOE) approv
ool – Pre‐Desig
t on hold until
mprovements
ced on hold pe
of Revised C
lo Alto High Sc
on to Issue A
ervices at Duve
Change Orders
on to Bid Corpo
– Installation
htspeed sound
d
ebruary 1, 201
dition & Renov
n in January 20
y 2009, and ha
.L. Stanford an
ve been closed
were deployed
n
development f
ved the maste
gn
a growth plan
– Phase 1 Sch
ending further
Board A
onceptual Des
chool
Amendment No
eneck Element
s
oration Yard Pr
of Interactive
d assist system
1, and final ch
vation
010. DSA close
s been closed
nd Terman
.
to the variou
for Garland on
r plans for bo
is established
ools Barron Pa
discussions w
Actions in Octo
sign, Budget,
o. 1 to Ninyo
tary School
roject: Installat
Whiteboards
ms were com
hange order ne
eout received o
out with DSA.
us campuses fo
n hold until a g
oth high schoo
d for the eleme
ark and El Carm
ith the BOE ab
ober
and DLM Ad
& Moore, Sp
tion of a Modu
and Sound As
pleted for all
egotiations com
on July 18, 201
or use during
growth plan is
ols, and these
entary schools.
melo
bout elementar
ddendum No.
ecialty Consul
ular Building
Pa
ssist Systems
elementary
mpleted on Ma
11.
the 2014/15 s
s established f
projects have
ry growth plan
21 for the L
ltants for Add
age | 5
school
arch 9,
school
for the
e been
nning.
Library
itional
A B C C / A B - C C / B A - BMeasure A FundGunn High School - High School Master Plan 172,390 166,328 138,714 80.5% 27,614 83.40% 6,062Gunn High School 1 - Aquatic Center 4,865,425 4,862,530 4,862,530 99.9% 0 100.00% 2,895Gunn High School 2 - I.A Building 5,082,402 5,065,128 5,065,128 99.7% 0 100.00% 17,274Gunn High School 3 - AD2- close out 5,777 5,777 5,777 100.0% 0 100.00% 0Gunn High School 4 - New classroom Buildings 25,035,201 24,758,488 24,758,488 98.9% 0 100.00% 276,713Gunn High School 5 - Parking & Drop Off improvements 3,940,000 1,991,105 1,540,201 39.1% 450,904 77.35% 1,948,895Gunn High School 6- New/Auxiliary Gymnasium 12,914,800 12,460,602 12,320,804 95.4% 139,798 98.88% 454,198Gunn High School 7- A/C 2,600,000 2,092,366 2,092,366 80.5% 0 100.00% 507,634Gunn High School 8 - MS & L-31 Buildings 2,120,839 1,707,527 1,428,534 67.4% 278,993 83.66% 413,312Gunn High School 9 - Central building 19,374,242 1,236,865 79,515 0.4% 1,157,350 6.43% 18,137,377Gunn High School - Reserved 0 0 0 0.0% 0 0.00% 0Palo Alto High Schools - High School Master Plan 172,999 167,759 161,616 93.4% 6,143 96.34% 5,240Palo Alto High School 1 - Stadium Field 5,090,000 4,749,887 4,749,887 93.3% 0 100.00% 340,113Palo Alto High School 2 - Multi-Use Field (Multi-Fund) 2,609,680 2,609,680 2,609,680 100.0% 0 100.00% 0Palo Alto high School 3 - New classroom & Media Art Building 38,415,003 36,274,946 35,948,757 93.6% 326,189 99.10% 2,140,057Palo Alto High School 4 - New Theater 29,370,049 26,678,920 2,802,245 9.5% 23,876,675 10.50% 2,691,129Palo Alto High School 5 - Haymarket and Tower Admin. Building 1,499,999 1,260,933 1,260,933 84.1% 0 100.00% 239,066Palo Alto High School 6- Science Addition 5,532,204 977,826 582,458 10.5% 395,368 59.57% 4,554,378Paly 7- indoor phusical ed and athletic facilities 350,000 181,327 176,475 50.4% 4,852 97.32% 168,673Palo Alto High School - Reserved 18,474,443 0 0 0.0% 0 0.00% 18,474,443Jordan Middle School -Program Management- MS Pre-Design 18,890 17,826 17,826 94.4% 0 100.00% 1,064Jordan Middle Schools 1- Interim Classrooms 600,342 488,033 488,033 81.3% 0 100.00% 112,309Jordan Middle School 2- Improvements 19,891,564 19,109,079 18,711,668 94.1% 397,411 97.92% 782,485J.L.S Middle School - Program Management- MS Pre-Design 18,799 18,408 18,408 97.9% 0 100.00% 391J.L.S Middle School 1 - Interim Classrooms 446,844 422,500 422,500 94.6% 0 100.00% 24,344 J.L.S Middle School 2- Improvements 17,184,699 15,503,856 15,399,140 89.6% 104,716 99.32% 1,680,843Terman Middle School - Program Management- MS Pre-Design 18,799 18,423 18,423 98.0% 0 100.00% 376Terman Middle School 1- Improvements 13,312,971 13,003,488 12,902,397 96.9% 101,091 99.22% 309,483PAUSD Elementary Schools - Program Management- Elem. Growth Plan 145,000 98,480 92,290 63.6% 6,190 93.71% 46,520Addison Elementary School 1-Phase I 21,267 21,267 21,267 100.0% 0 100.00% 0Duveneck Elementary School 1-Phase I 9,778,358 9,531,799 8,861,468 90.6% 670,331 92.97% 246,559Garland Elementary School 1- Phase I 22,178,544 280,113 280,113 1.3% 0 100.00% 21,898,431Fairmeadow Elementary School 1- Phase I 7,796,550 7,501,746 7,486,534 96.0% 15,212 99.80% 294,804Hoover Elementary School 1-Phase I 70,550 57,165 57,165 81.0% 0 100.00% 13,385Ohlone Elementary School 1- Phase I 10,597,870 10,481,389 10,481,389 98.9% 0 100.00% 116,481 Elementary Schools 1 - Elementary Classroom Improvements 2,004,889 1,879,695 1,879,695 93.8% 0 100.00% 125,194Elementary Schools - Reserved 37,585,253 0 0 0.0% 0 0.00% 37,585,253PAUSD - Program Management 12,657,031 10,891,709 9,168,836 72.4% 1,722,873 84.18% 1,765,322PAUSD - Technology 10,485,054 9,672,962 9,662,611 92.2% 10,351 99.89% 812,092PAUSD - Technology -Reserved 3,422,312 0 0 0.0% 0 0.00% 3,422,312PAUSD - Reserved 6,043,535 0 0 0.0% 0 0.00% 6,043,535525 San Antonio -Property Acquisition 8,500,000 8,500,000 8,500,000 100.0% 0 100.00% 0Transfer out to Planned Maintenance Fund* 17,758,557 17,758,557 17,758,557 100.0% 0 100.00% 0Bond Issuance Cost 2,530,220 2,530,220 2,530,220 100.0% 0 100.00% 0Measure A Fund Total 380,693,351 255,034,708 225,342,647 29,692,061 125,658,643* Planned Maintenance Fund Total4,083,911 1,103,677 751,640 18% 352,037 2,980,234*$17,758,557 transfer from Measure A fund to Planned Maintenance fund was done during FY 2013-14 .The budget for Planned maintenance fund will be increased about $2 M every year in 9 years.Prepared by: Business Services Department based on QSS accounting SystemBudget BalanceCommittedBudgetSchool Name - Project NamePercent of Budget ExpendedPalo Alto Unified School DistrictStrong Schools Bond10/31/2014Percent of ExpendedContract BalanceExpenditures
Gunn H
Traffic Si
Phase I –
A. PROJE
The b
Miran
Novem
Decem
B. BUDG
C. BOND
D. PROJE
M
im
co
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
High Schoo
ignal Replac
– Parking an
ECT STATUS
id opening for
da is schedul
mber 18, 201
mber 2014.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
Miranda Ave. pa
mprovements w
ontract and wi
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
l
ement
d Drop‐off I
r thetraffic sig
led for Novem
4 and the ta
LE SUMMARY
T REFERENCE: 5
W:
arking and dro
was delayed by
ll be re‐bid in N
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
mprovemen
nal replaceme
mber 4, 2014.
rget completi
5.5
p‐off project h
y City of Palo A
November.
$0
$3,940,000
$0
$3,940,000
$0
$0
$919,858
$2,919,840
$100,302
$3,940,000
39.1%
$121,380
$121,380
0.0%
Directives vs.
nts
ent project at
Board award
ion is anticipa
has completed
Alto permit cha
C
S
A
B
C
B
S
B
A
B
S
A
B
A
N
S
*
(
Arastradero a
d is scheduled
ated to occur
within budget
anges, so signa
Current Phase:
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design
BOE Approval
Authorize to Bid (2
BOE Approval
Submit to DSA
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Compl
* Anticipated Dates –
( ) Denotes number o
and
for
r in
t. Completion o
al work has bee
Close‐out/Oc
t (2)
n (2)
(2)
2)
t (1)
d
letion
– Subject to Change
of Board of Education
Pa
of off‐site
en deleted from
cupancy – August
March 31, 2009
April 14, 2009
June 19, 2012
June 26, 2012
December 18, 2
January 15, 201
June 11, 2013
June18, 2013
July 17, 2013
October 2, 2013
November 12, 2
November 19, 2
December 4, 20
August 15, 2014
n Readings
age | 6
m this
15, 2014
9
2012
13
3
2013
2013
013
4
Gunn H
Central B
A. PROJE
DLM c
that w
studen
Septem
Wellne
progra
review
B. BUDG
C. BOND
D. PROJE
D
is
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
High Schoo
Building Proj
ECT STATUS
continued desig
will house guida
nt activities spa
mber 2014, an
ess Center at B
am change to t
wed with the B
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
LM is working
anticipated in
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
l
ject
gn developme
ance and coun
aces. DLM revi
d conducted a
Balboa High Sc
the schematic
oard in Decem
LE SUMMARY
T REFERENCE: 5
W:
with staff on a
December 20
unds
ment
y
ended
nt of the two‐s
seling, new cla
iewed the plan
a site visit of th
hool in San Fra
design approv
mber 2014.
5.5
a program chan
14.
$0
$19,374,242
$0
$19,374,242
$0
$0
$3,237,823
$15,936,419
$200,000
$19,374,242
0.4%
story building
assrooms and
ns with staff in
e Health and
ancisco. A
al will be
nge to the 2nd f
C
S
A
B
C
B
S
B
B
S
A
B
A
B
A
N
S
*
(
floor of this bu
Current Phase:
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design (
BOE Approval
BOE Approval of Pr
Submit to DSA
Authorize to Bid (2
BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Comple
* Anticipated Dates –
) Denotes number of
uilding. Presen
Design Develo
(2)
(2)
(2)
rogram Change
2)
(1)
etion
– Subject to Change
f Board of Education
Pa
tation to the B
opment
March 31, 2009
April 14, 2009
February 25, 201
March 11, 2014
June 3, 2014
June 17, 2014
December 9, 201
March 14, 2015*
June 7, 2015*
June 21, 2015*
December 25, 20
February 26, 201
March 7, 2016*
March 18, 2016*
January, 2017*
n Readings
age | 7
Board
14
14*
*
015*
16*
*
Palo Alt
Performi
A. PROJE
Alten
poure
of the
concre
comm
paving
B. BUDG
C. BOND
D. PROJE
Co
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
to High Sch
ing Arts Cen
ECT STATUS
Construction
d concrete cur
e building pa
ete for the
mence forming
g the access ro
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
onstruction is
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
hool
nter (PAC)
completed ro
rbs and gutters
ad, excavation
basement foo
walls, running
ad in Novemb
LE SUMMARY
T REFERENCE: 4
W:
proceeding acc
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
ugh grading, a
s for the access
n, rebar place
otings is in p
g utilities throu
er 2014.
4.11
cording to sche
$0
$29,370,049
$0
$29,370,049
$0
$0
$4,377,871
$24,845,000
$147,178
$29,370,049
9.5%
$2,184,400
$2,150,130
0.6%
Directives vs.
and has forme
s road. Finish g
ement, and p
progress. Alte
ugh the buildin
edule and with
C
S
A
B
C
B
S
B
B
S
A
A
B
B
A
N
S
P
*
(
ed and
grading
pouring
en will
ng, and
hin budget.
Current Phase:
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design (
BOE Approval
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (2
BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
Substantial Comple
Planned Occupanc
* Anticipated Dates –
) Denotes number of
Construction
(2)
n (2)
(3)
2)
(1)
etion
cy
– Subject to Change
f Board of Education
Pa
n
March 31, 2009
April 14, 2009
June 1, 2010
June 22, 2010
June 14, 2011
December 13, 20
January 17, 2012
March 28, 2013
January 16, 2014
January 14, 2014
January 28, 2014
May 13, 2014
June 3, 2014
June 23, 2014
February 13, 201
June 1, 2016*
n Readings
age | 8
011
2
4
4
4
16*
Palo Alt
Science B
A. PROJE
The c
after c
constr
on co
submi
B. BUDG
C. BOND
D. PROJE
D
w
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
to High Sch
Building Add
ECT STATUS
onstruction sc
construction o
raints and acce
onstruction d
ttal to DSA pla
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
esign developm
will not begin un
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
hool
dition
chedule has b
of the new gy
ess to the site.
documents in
anned for June
LE SUMMARY
T REFERENCE: 4
W:
ment will resum
ntil after comp
unds
ment
y
ended
been adjusted
mnasium, due
DLM will res
n January 20
2015.
4.1 ‐ 4.3
me in January
pletion of the G
$0
$5,532,204
$0
$5,532,204
$0
$60,309
$842,825
$4,628,294
$776
$5,532,204
10.4%
to occur
e to space
ume work
015, with
for anticipated
Gymnasium pro
C
S
A
B
C
B
S
B
S
A
B
A
B
A
N
S
P
*
(
d submittal to
oject.
Current Phase:
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design (
BOE Approval
Submit to DSA
Authorize to Bid (2
BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Comple
Planned Occupanc
* Anticipated Dates –
) Denotes number of
DSA in June 20
Design Devel
(2)
n (2)
(2)
2)
(1)
etion
cy
– Subject to Change
f Board of Education
Pa
015. Construct
lopment
March 12, 2013
March 19, 2013
March 12, 2013
March 19, 2013
September 10, 2
October 8, 2013
June 15, 2015*
February 2, 2016
February 19, 201
March 15, 2016*
May 30, 2016*
June 15, 2016*
July 1, 2016*
August 1, 2017*
August 15, 2017
n Readings
age | 9
tion
2013
6*
16*
*
*
Palo Alt
Indoor P
A. PROJE
Jerem
and c
Comp
Vance
B. BUDG
C. BOND
D. PROJE
Va
ea
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
to High Sch
E and Athlet
ECT STATUS
iah Tolbert Ar
continues to
letion of a bid
e Brown in mid
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
ance Brown Bu
arly November
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
hool
tic Facilities
rchitects receiv
address const
set for pricing
‐November 20
LE SUMMARY
T REFERENCE: 4
W:
uilders and Tol
r, with a bid se
unds
ment
y
ended
s
ved DSA sign‐o
tructability re
g is anticipate
014.
4.1 ‐ 4.3
bert Architects
t scheduled to
$0
$350,000
$0
$350,000
$0
$0
$225,000
$125,000
$0
$350,000
50.4%
off in Septemb
view commen
d to be ready
s will be comp
o be ready for b
C
S
A
B
C
B
S
B
S
R
A
L
A
N
S
P
*
(
ber,
nts.
for
leting construc
bidding in Nov
Current Phase:
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Re‐Submit to DSA
Approval by DSA
Lease Leaseback A
Award of Contract
Notice to Proceed
Substantial Compl
Planned Occupanc
* Anticipated Dates –
( ) Denotes number o
ctability and sc
ember 2014.
Construction
t (2)
n (2)
(2)
Agreement
t (1)
d
letion
cy
– Subject to Change
of Board of Education
Pag
cope clarificati
n Documents
N/A
N/A
March 12, 2013
March 19, 2013
September 10, 2
October 8, 2013
December 4, 20
January 27, 201
September 22, 2
January 13, 201
January 27, 201
January 30, 201
August 1, 2016*
August 15, 2016
n Readings
ge | 10
ons in
3
3
2013
3
013
14
2014
15*
15*
15*
*
6*
Palo Alt
Building
A. PROJE
DLM
Septem
schem
and w
the Fa
design
2015 f
B. BUDG
C. BOND
D. PROJE
Sc
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
to High Sch
500 Renova
ECT STATUS
presented the
mber 28, 2014
matic design. D
will continue m
acilities Steerin
n approval Dec
for schematic d
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
chematic desig
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
hool
ation (Librar
e revised conc
4 and receive
DLM has comm
eetings throug
ng Committee f
cember 2 2014
design approva
LE SUMMARY
T REFERENCE: 4
W:
gn drawings are
unds
ment
y
ended
y)
eptual design
d approval on
menced schem
gh November 2
for their recom
4. DLM anticip
al.
4.8
e in progress.
$0
$9,350,000
$0
$9,350,000
$0
$0
$1,886,000
$7,344,000
$120,000
$9,350,000
0.0%
to the Board
n October 14,
matic design w
2014. DLM wil
mmendation to
pates returning
C
S
A
B
C
B
S
B
S
A
B
A
A
N
S
P
*
(
of Education
2014 to proc
with stakeholde
ll review the p
o the BOE for s
g to the BOE in
Current Phase:
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Authorize to Bid (2
BOE Approval
Approval by DSA
Award of Contract
Notice to Proceed
Substantial Compl
Planned Occupanc
* Anticipated Dates –
( ) Denotes number o
(BOE) on
ceed with
er groups
plans with
schematic
n January
Schematic De
t (2)
n (2)
(2)
2)
t (1)
d
letion
cy
– Subject to Change
of Board of Education
Pag
esign
N/A
N/A
September 23, 2
October 14, 201
January 13, 201
January 27, 201
July 6, 2015*
March 8, 2016*
March 22, 2016
February 27, 20
May 1, 2016*
May26, 2016*
July 1, 2017*
August 15, 2017
n Readings
ge | 11
2014
14
15*
15*
6*
016*
7*
Gunn H
New Clas
A. PROJE
The n
studen
have b
B. BUDG
C. BOND
D. PROJE
Th
st
oc
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
High Schoo
ssroom Buil
ECT STATUS
ew Math and
nts on August
been in use sin
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he World Lang
tudents on Feb
ccupied with st
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
l
dings A & B
d English Build
15, 2013. Wo
ce February, 2
LE SUMMARY
T REFERENCE: 3
W:
uages building
bruary 11, 2013
taff and studen
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
ding was occu
rld Language B
2013.
3.1, 3.3, 3.4
g move‐in occu
3. The Math &
nts on August
$0
$25,035,201
$0
$25,035,201
$24,948
$308,194
$3,789,909
$20,911,873
$277
$25,035,201
98.9%
$ 1,763,200
$ 126,231
9.3%
Directives vs.
upied by staff
Building classro
urred on Febru
& English buildi
15, 2013. The
f and
ooms
ary 8, 2013, an
ng move‐in oc
e project was co
Current Phase: O
Schedule:
Architect Contrac
BOE Approval
Conceptual Desig
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Authorize to Bid (
BOE Approval
Approval by DSA
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates
( ) Denotes number o
nd was occupie
ccurred on July
ompleted with
Occupancy – Augus
ct (2)
n (2)
n (2)
(2)
ct (1)
d
pletion
cy
– Subject to Change
of Board of Educatio
Pag
ed with staff an
y 15, 2013, and
hin budget.
st 15, 2013
March 31, 2009
April 14, 2009
September 8, 2
September 22,
January 12, 201
January 26, 201
August 4, 2010
March 8, 2011
March 22, 2011
May 27, 2011
July 13, 2011
July 22, 2011
August 24, 201
July 15, 2013
August 15, 2013
on Readings
ge | 12
nd
d was
9
2009
2009
10
10
1
1
3
Gunn H
New Gym
A. PROJE
The n
classe
tennis
compl
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
High Schoo
mnasium
ECT STATUS
ew gymnasium
s were held in
s courts surf
eted August 2
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he new gym w
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
l
m was occupi
n the new gym
facing and s
7, 2013.
LE SUMMARY
T REFERENCE: 3
W:
as occupied on
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
ed on June 7
m on August
striping was
3.4, 3.5, 3.13
n June 7, 2013
$0
$12,914,800
$0
$12,914,800
$0
$19,706
$2,461,402
$10,400,737
$32,955
$12,914,800
95.3%
$834,700
$7,909
9.9%
Directives vs.
7, 2013 and P
15, 2013. Th
installed an
.
S
A
S
S
A
A
A
S
PE
e
d
Current Phase:
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Authorize to Bid (
BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Comp
Planned Occupanc
* Anticipated Dates
( ) Denotes number o
Occupancy –
t (2)
n (2)
(2)
2)
t (1)
d
letion
cy
– Subject to Change
of Board of Educatio
Pag
– June 7, 2013
March 31, 2009
April 14, 2009
September 8, 2
September 22,
January 12, 201
January 26, 201
August 4, 2010
March 8, 2011
March 22, 2011
May 27, 2011
July 13, 2011
July 20, 2011
August 1, 2011
May 1, 2013
June 7, 2013
n Readings
ge | 13
9
009
2009
10
10
1
Gunn H
Existing G
A. PROJE
The m
Novem
B. BUDG
C. BOND
D. PROJE
Th
N
Fund
This
budg
Chan
High Schoo
Gymnasium
ECT STATUS
modernized Bo
mber 4, 2013.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project was
ovember 12, 2
ding and Budget
project is funded b
get. See that proje
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
l
m Moderniza
ow gym was
LE SUMMARY
T REFERENCE: 3
W:
s completed on
2013.
by the New Gymn
ect budget for stat
ency
ency Balance
ngency Balance
ges
onstruction Change
tion
occupied by t
3.4, 3.5, 3.13
n‐schedule and
asium project
tus.
$99,800
$99,800
0.0%
Directives vs.
the campus o
d within budge
on
et. Occupancy b
Current Phase:Cl
Schedule:
Architect Contrac
BOE Approval
Conceptual Desig
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Authorize to Bid (
BOE Approval
Approval by DSA
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates
( ) Denotes number
by the school o
ose‐out / Occupan
ct (2)
gn (2)
n (2)
(2)
ct (1)
d
pletion
ncy
– Subject to Change
of Board of Educatio
Pag
occurred on
ncy – November 1
March 31, 2009
April 14, 2009
September 8, 2
September 22,
January 12, 201
January 26, 201
August 4, 2010
February 12, 20
February 26, 20
January 23, 201
April 2, 2013
April 9, 2013
May 31, 2013
October 28, 20
November 12, 2
e
on Readings
ge | 14
12, 2013
9
2009
2009
10
10
013
013
13
13
2013
Gunn H
E and K (
A. PROJE
Studen
the fle
2014.
B. BUDG
C. BOND
D. PROJE
Co
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
High Schoo
(MS and L‐31
ECT STATUS
nts occupied E
ex room in b
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
onstruction wa
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
l
1) Buildings
E and K buildi
uilding E was
LE SUMMARY
T REFERENCE: 3
W:
as completed o
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
Renovation
ngs on August
occupied on
3.4, 3.5, 3.13
on schedule an
$0
$2,120,839
$0
$2,120,839
$0
$0
$428,000
$1,690,552
$2,287
$2,120,839
67.4%
$122,800
$114,946
1.0%
Directives vs.
n
t 13, 2014, an
September 15
nd within budg
nd
5,
get. Occupancy
Current Phase:
Schedule:
Architect Contrac
BOE Approval
Conceptual Desig
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Authorize to Bid (
BOE Approval
Approval by DSA
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates
( ) Denotes number o
y took place on
Close‐out/Occup
t (2)
n (2)
(2)
2)
t (1)
d
pletion
cy
– Subject to Change
of Board of Educatio
Pag
n August 13, 20
pancy – August 15,
March 31, 2009
April 14, 2009
September 8, 2
September 22,
June 11, 2013
June 18, 2013
November 25, 2
March 25, 2014
April 22, 2014
March 27, 2014
April 29, 2014
May 20, 2014
May 27, 2014
August 11, 2014
August 15, 2014
n Readings
ge | 15
014.
, 2014
9
009
2009
2013
4
4
4
4
Palo Alt
Athletic S
A. PROJE
The c
fence,
2013 f
B. BUDG
C. BOND
D. PROJE
Th
oc
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
to High Sch
Stadium Imp
ECT STATUS
oncessions bu
signage and
football season
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he ornamental
ccupied Septem
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
hool
provements
uilding, track r
entry lighting
n.
LE SUMMARY
T REFERENCE: 4
W:
l fence was com
mber 10, 2012
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
s
re‐surfacing, n
g were comple
4.13
mpleted on sch
. The bleache
$0
$5,090,000
$0
$5,090,000
$882
$2,746
$818,716
$4,267,656
$0
$5,090,000
93.3%
$310,200
$225,587
2.3%
Directives vs.
new ornament
eted for the F
hedule in Augu
r replacement
tal
Fall
ust 2013. The
work was com
Current Phase: C
Schedule:
Architect Contra
BOE Approval
Conceptual Desi
BOE Approval
Schematic Desig
BOE Approval
Submit to DSA
Authorize to Bid
BOE Approval
Approval by DSA
Bid Opening
Award of Contra
Notice to Procee
Substantial Com
Planned Occupa
Bleachers
Fence Completio
* Anticipated Dates –
()Denotesnumberof
concessions bu
mpleted on sch
Close‐out / Occup
act (2)
gn (2)
gn (2)
(2)
A
act (1)
ed
mpletion ‐ Concessi
ncy ‐ Concessions
on
– Subject to Change
fBoard ofEducation Rea
Pag
uilding was
hedule in June
pancy – August 1, 2
January 26, 20
February 9, 20
June 1, 2010
June 22, 2010
February 22, 2
March 8, 2011
April 4, 2011
June 28, 2011
July 19, 2011
July 26, 2011
December 1, 2
December 13,
January 4, 201
ion August 31, 20
September 10
March 31, 201
August 1, 2013
adings
ge | 16
2013.
2013
010
010
2011
1
2011
, 2011
12
012
0, 2012
13
3
Palo Alt
Haymark
A. PROJE
All Tr
windo
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
to High Sch
ket and Tow
ECT STATUS
rusty Builders
ows on August
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project com
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
hool
wer Building
completed t
9, 2013, on sch
LE SUMMARY
T REFERENCE: 4
W:
mpleted on sch
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
Improveme
the installatio
hedule and wit
4.1 ‐ 4.3
edule and with
$0
$1,500,000
$0
$1,500,000
$0
$62,844
$179,000
$1,258,159
$0
$1,500,000
84.1%
$39,200
$33,930
1.3%
Directives vs.
nts
on of the ne
thin budget.
hin budget.
ew
Current Phase: C
Schedule:
Architect Contrac
BOE Approval
Conceptual Desig
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Authorize to Bid
BOE Approval
Approval by DSA
Bid Opening
Award of Contrac
Notice to Procee
Substantial Comp
* Anticipated Dates
( ) Denotes number
Close‐out / Occupa
ct (2)
gn (2)
n (2)
(2)
ct (1)
d
pletion
s – Subject to Change
r of Board of Educatio
Pag
ancy – August 9, 2
N/A
N/A
N/A
N/A
N/A
N/A
May 25, 2012
April 24, 2012
May 6, 2012
August 24, 201
January 17, 20
January 29, 20
February 21, 2
August 9, 2013
e
on Readings
ge | 17
2013
12
13
13
013
3
Palo Alt
Classroo
A. PROJE
Move
compl
closeo
B. BUDG
C. BOND
D. PROJE
Fu
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
to High Sch
m Building a
ECT STATUS
in and occupa
eted their wo
out in progress
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
urniture install
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
hool
and Media A
ancy of both b
ork, and contra
.
LE SUMMARY
T REFERENCE: 4
W:
ation and occu
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
Arts
buildings occur
act closeout is
4.1 ‐ 4.3
upancy of the M
$0
$38,415,001
$0
$38,415,001
$18,448
$1,325,333
$7,261,915
$29,713,481
$95,826
$38,415,001
93.6%
$2,515,000
$85,252
9.7%
Directives vs.
rred in July 20
s nearly comp
Media Arts and
014. Taisei has
lete, with DSA
d Math/Social
Current Phase:
Schedule:
Architect Contrac
BOE Approval
Conceptual Desig
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Authorize to Bid (
BOE Approval
Approval by DSA
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates
( ) Denotes number o
s
A
Sciences build
Close‐out/ Oc
t (2)
n (2)
(2)
2)
t (1)
d
pletion
cy
– Subject to Change
of Board of Educatio
Pag
dings complete
ccupancy –Augus
March 31, 2009
April 14, 2009
September 8, 2
September 22,
January 12, 201
January 26, 201
August 4, 2010
March 8, 2011
March 22, 2011
April 28, 2011
June 30, 2011
July 12, 2011
August 4, 2011
April 15, 2014
August 1, 2014
n Readings
ge | 18
ed.
t 1, 2014
9
009
2009
10
10
1
Jordan
A. PROJE
Studen
start o
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
Middle Sc
ECT STATUS
nts occupied a
of school in fall
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project was
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
hool
all new and m
l 2013.
LE SUMMARY
T REFERENCE: 2
W:
s completed on
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
modernized bu
2.1 – 2.3, 2.6 –
n schedule and
$0
$19,891,564
$0
$19,891,564
$6,111
$86,265
$3,723,370
$16,007,031
$68,787
$19,891,564
93.8%
$1,398,700
$847,769
4.0%
Directives vs.
ildings for the
– 2.8, 2.10 – 2.1
d within budget
C
S
A
B
C
B
S
B
S
A
B
A
B
A
N
S
P
*
(
e
12, 6.3 – 6.5
t.
Current Phase: Clo
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Authorize to Bid (2
BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Compl
Planned Occupanc
* Anticipated Dates –
( ) Denotes number of
ose‐out / Occupan
t (2)
n (2)
(2)
2)
t (1)
etion
cy
– Subject to Change
of Board of Education
Pag
ncy – August 15, 2
October 28, 200
October 30, 200
June 23, 2009
September 8, 20
March 23, 2010
April 27, 2010
December 21, 2
June 28, 2011
July 19, 2011
October 5, 2011
December 8, 20
December 13, 2
December 27, 2
August 1, 2013
August 15, 2013
n Readings
ge | 19
013
08
08
009
010
1
11
011
011
3
J.L. Stan
A. PROJE
Studen
start o
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
nford Midd
ECT STATUS
nts occupied
of school in fall
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project com
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
dle School
all new and m
l 2013.
LE SUMMARY
T REFERENCE: 2
W:
mpleted on sch
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
modernized b
2.1 – 2.3, 2.5 –
edule and with
$0
$17,184,699
$0
$17,184,699
$8,879
$144,790
$3,545,843
$13,485,187
$0
$17,184,699
89.5%
$1,057,800
$902,445
2.8%
Directives vs.
uildings for th
– 2.8, 2.11 – 2.1
hin budget.
C
S
A
B
C
B
S
B
B
S
A
B
A
B
A
N
S
P
*
(
he
12, 6.4, 6.5
Current Phase: Cl
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design
BOE Approval
BOE Approval (Site
Submit to DSA
Authorize to Bid (2
BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Compl
Planned Occupanc
* Anticipated Dates – Subj
( ) Denotes number of Boa
ose‐out / Occupan
t (2)
n (2)
(3)
ework)
2)
t (1)
d
letion
cy
ject to Change
ard of Education Readings
Pag
ncy – August 15, 2
October 28, 200
October 30, 200
June 23, 2009
September 8, 20
June 1, 2010
June 22, 2010
September 28, 2
May 6, 2011
November 29, 2
December 13, 2
January 24, 201
May 3, 2012
May 8, 2012
May 30, 2012
August 7, 2013
August 15, 2013
ge | 20
2013
08
08
009
2010
2011
2011
12
3
J.L. Stan
Landscap
A. PROJE
Scape
B. BUDG
C. BOND
D. PROJE
Th
Fund
This p
proje
Perce
Chan
nford Midd
pe and Site I
ECT STATUS
s completed th
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project com
ding and Budget
project is funded b
ect budget. See th
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
dle School
Improvemen
he project on s
LE SUMMARY
T REFERENCE: 2
W:
mpleted on sch
by the J.L. Stanford
hat project budget
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
nts
schedule in the
2.1 – 2.3, 2.5 –
edule and with
d Middle School
for status.
89.5%
$1,057,800
$902,445
2.8%
Directives vs.
e fall 2013.
– 2.8, 2.11 – 2.1
hin budget.
C
S
A
C
S
S
A
A
A
S
C
(
12, 6.4, 6.5
Current Phase: Cl
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design
BOE Approval
BOE Approval (Sit
Submit to DSA
Authorize to Bid (2
BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Comp
Completion
* Anticipated Dates – Subj
( ) Denotes number of Boa
ose‐out / Occupan
t (2)
n (2)
(3)
ework)
2)
t (1)
d
letion
ject to Change
ard of Education Readings
Pag
ncy – August 16, 2
October 28, 200
October 30, 200
June 23, 2009
September 8, 20
June 1, 2010
June 22, 2010
September 28, 2
May 6, 2011
November 29, 2
December 13, 2
January 24, 201
May 3, 2013
May 8, 2013
May 23, 2013
August 16, 2013
August 16, 2013
ge | 21
2013
08
08
009
2010
2011
2011
12
3
3
Terman
A. PROJE
Studen
mode
cafeto
B. BUDG
C. BOND
D. PROJE
Th
N
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
n Middle Sc
ECT STATUS
nts occupied
rnized building
orium moderni
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project com
ovember 2013
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
chool
d the new
gs for the star
zation was com
LE SUMMARY
T REFERENCE: 2
W:
mpleted on sch
3. The project
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
instructional
rt of school in
mpleted in Oct
2.1 – 2.8, 2.11
edule in Augus
has been com
$0
$13,312,971
$0
$13,312,971
$4,153
$75,747
$2,720,590
$10,507,733
$4,748
$13,312,971
96.9%
$929,900
$12,909
9.4%
Directives vs.
spaces an
fall 2013. Th
tober 2013.
– 2.12
st 2013, except
pleted within b
nd
he
t for the Cafet
budget.
Current Phase: C
Schedule:
Architect Contrac
BOE Approval
Conceptual Desig
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Authorize to Bid
BOE Approval
Approval by DSA
Bid Opening
Award of Contrac
Notice to Procee
Substantial Comp
Planned Occupan
* Anticipated Dates
( ) Denotes number
orium, which w
Close‐out / Occupa
ct (2)
gn (2)
n (2)
(2)
ct (1)
d
pletion
ncy
s – Subject to Change
r of Board of Educatio
Pag
was completed
ancy – November
October 28, 20
October 30, 20
June 23, 2009
September 8, 2
May 11, 2010
May 25, 2010
December 21,
June 28, 2011
July 19, 2011
September 1, 2
December 6, 2
December 13,
December 27,
October 31, 20
November 15,
e
on Readings
ge | 22
d in
15, 2013
008
008
2009
2010
2011
011
2011
2011
013
2013
Duvene
New Clas
A. PROJE
The fe
remov
compl
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
eck Elemen
ssroom Buil
ECT STATUS
ence around th
ved on Septem
ete and occup
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project has
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
ntary Scho
dings and M
he sod for the
mber 19, 2014
pied on August
LE SUMMARY
T REFERENCE: 1
W:
been complet
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
ool
Modernizatio
e field area to
4. All buildin
11, 2014.
1.1 – 1.2, 1.4 –
ed within budg
$0
$9,778,358
$0
$9,778,358
$20,313
$0
$2,098,650
$7,655,002
$4,393
$9,778,358
88.4%
$703 ,772
$435,376
3.8%
Directives vs.
on
establish grow
ngs were subs
– 1.10
get, and was o
wth was
stantially
occupied on Au
Current Phase:
Schedule:
Architect Contrac
BOE Approval
Conceptual Desig
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (
BOE Approval
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates
( ) Denotes number o
ugust 5, 2014.
Close‐out/O
ct (2)
n (2)
n (2)
(2)
ct (1)
d
pletion
cy
– Subject to Change
of Board of Educatio
Pag
Occupancy –Augus
April 27, 2010
May 11, 2010
December 14, 2
January 11, 201
June 14, 2011
June 28, 2011
February 27, 20
December 10, 2
December 18 2
January 15, 201
February 28, 20
March 12, 2013
March 25, 2013
July 31, 2014
August 5, 2014
on Readings
ge | 23
st 5, 2014
2010
11
012
2012
2012
13
013
3
3
Fairmea
New Clas
A. PROJE
Studen
start o
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
adow Elem
ssroom Buil
ECT STATUS
nts occupied a
of school in fall
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project com
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
mentary Sc
ding and Mo
all new and m
l 2013.
LE SUMMARY
T REFERENCE: 1
W:
mpleted on sch
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
chool
odernization
modernized bu
1.1 – 1.2, 1.4 –
edule and with
$0
$7,796,550
$0
$7,796,550
$32,377
$98,962
$1,992,932
$5,671,159
$1,120
$7,796,550
96.0%
$642 ,300
$186,122
7.1%
Directives vs.
n
uildings for the
– 1.10
hin budget.
C
Sc
A
B
C
B
Sc
B
S
A
B
A
B
A
N
S
P
*
( )
e
Current Phase:Clos
chedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
chematic Design (
BOE Approval
ubmit to DSA
Authorize to Bid (2
BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
ubstantial Comple
Planned Occupancy
Anticipated Dates –
) Denotes number of
se‐out / Occupanc
(2)
(2)
(2)
)
(1)
etion
y
– Subject to Change
f Board of Education
Pag
cy – August 15, 20
October 13, 2009
October 27, 2009
March 23, 2010
April 6, 2010
September 14, 2
September 28, 2
April 18, 2011
October 11, 2011
October 25, 2011
November 14, 20
December 5, 201
December 13, 20
January 3, 2012
August 5, 2013
August 15, 2013
Readings
ge | 24
013
9
9
010
010
1
1
011
11
011
Ohlone
New Clas
A. PROJE
Move‐
occurr
buildin
B. BUDG
C. BOND
D. PROJE
O
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
Elementa
ssroom Buil
ECT STATUS
‐in to the new
red in Decemb
ng on January
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
ccupancy occu
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
ary School
ding and Mo
w building and
ber 2011. Stu
3, 2012.
LE SUMMARY
T REFERENCE: 1
W:
urred on Janua
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
odernization
other existing
udents occupie
1.1 – 1.2, 1.4 –
ry 3, 2012. Pro
$0
$10,597,870
$0
$10,597,870
$7,461
$49,049
$2,180,418
$8,360,942
$62,598
$10,597,870
98.9%
$748,400
$459,113
3.9%
Directives vs.
n
classrooms
ed the new
– 1.10
oject complete
C
S
A
B
C
B
S
B
S
A
B
A
B
A
N
S
P
*
(
ed on schedule
Current Phase:
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Authorize to Bid (2
BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Compl
Planned Occupanc
* Anticipated Dates –
( ) Denotes number o
e and within bu
Occupancy –
t (2)
n (2)
(2)
2)
t (1)
d
letion
cy
– Subject to Change
of Board of Education
Pag
udget.
– January 3, 2012
September 30, 2
October 14, 200
March 3, 2009
March 17, 2009
June 2, 2009
June 23, 2009
November 24, 2
April 27, 2010
May 11, 2010
May 18, 2010
July 13, 2010
August 3, 2010
August 19, 2010
November 18, 2
January 3, 2012
n Readings
ge | 25
2008
08
9
2009
0
2011
2
Site Acq
525 San A
A. PROJE
This si
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
quisition
Antonio Rd
ECT STATUS
te has been le
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he site has bee
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
ased to Athena
LE SUMMARY
T REFERENCE: 1
W:
en leased to At
unds
ment
y
ended
a Academy.
1.1 – 1.2, 1.4 –
thena Academy
$0
$8,500,000
$0
$8,500,000
$0
$0
$8,500,000
$0
$0
$8,500,000
100.0%
– 1.10
y.
Current Phase:
Schedule:
Architect Contrac
BOE Approval
Conceptual Desig
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (
BOE Approval
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates
( ) Denotes number o
N/A
t (2)
n (2)
(2)
2)
t (1)
d
pletion
cy
– Subject to Change
of Board of Educatio
Pag
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
n Readings
ge | 26
Jordan
A. PROJE
The po
B. BUDG
C. BOND
D. PROJE
Th
M
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
*Bud
Middle Sc
ECT STATUS
ortables were
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
his project com
Move in occurre
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
dget previously exp
hools ‐ Int
installed and m
LE SUMMARY
T REFERENCE: 2
W:
mpleted ahead
ed on Septemb
unds
ment
y
ended
pended
erim Class
moved into for
2.1, 6.4, 6.5
of schedule an
ber 30, 2011.
$0
$392,120
$208,222
$600,342
$0
$0
$180,286
$419,292
$764
$600,342
76.8%*
srooms
fall 2011. DSA
nd under budg
A closeout rece
get.
Current Phase:
Schedule:
Approval by DSA
Authorize to Bid (
BOE Approval
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Occupancy
* Anticipated Dates
( ) Denotes number o
eived Novemb
Move‐in
2)
t (1)
d
pletion
– Subject to Change
of Board of Educatio
Pag
er 19, 2012.
June 16, 2011
June 14, 2011
June 28, 2011
July 14, 2011
July 20, 2011
July 27, 2011
September 20,
September 30,
n Readings
ge | 27
2011
2011
Gunn H
Air Cond
A. PROJE
Best C
condit
B. BUDG
C. BOND
D. PROJE
Pr
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
High Schoo
itioning of E
ECT STATUS
Contracting Se
tioning units an
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
roject has been
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
l
Existing Buil
ervices Inc. co
nd cool roof co
LE SUMMARY
T REFERENCE: 3
W:
n closed‐out.
unds
ment
y
ended
dings
ompleted the
oating in the su
3.7
$0
$2,600,000
$0
$2,600,000
$1,919
$0
$454,610
$2,120,580
$22,891
$2,600,000
80.9%
installation o
ummer 2011.
C
S
A
B
C
B
S
B
S
A
A
B
B
A
N
S
*
(
of air
Current Phase:
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (2
BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
Substantial Compl
* Anticipated Dates –
( ) Denotes number o
Completed
t (2)
n (2)
(2)
2)
t (1)
etion
– Subject to Change
of Board of Education
Pag
March 27, 2010
April 6, 2010
N/A
N/A
N/A
N/A
October 20, 201
February 10, 20
February 22, 20
March 8, 2011
March 28, 2011
April 8, 2011
April 11, 2011
August 8, 2011
n Readings
ge | 28
10
11
11
J.L. Stan
A. PROJE
Coulte
reloca
B. BUDG
C. BOND
D. PROJE
Pr
This
JLS p
nford Midd
ECT STATUS
er Constructio
ted portables
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
roject complet
portable reloca
project. Refer to
dle School
on completed
in August 2011
LE SUMMARY
T REFERENCE: 2
W:
ted on schedul
tion project fun
o pg. 14
‐ Interim
the work o
1.
2.1, 6.4, 6.5
e and is curren
ded by main
Classroom
on the
ntly in close‐ou
ms
ut.
Current Phase:
Schedule:
Approval by DSA
Jordan Project
Authorize to Bid (
BOE Approval
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates
( ) Denotes number
Occupancy
(2)
ct (1)
d
pletion
ncy
s – Subject to Change
of Board of Educatio
Pag
‐ August 11, 2011
April 19, 2011
June 16, 2011
May 10, 2011
May 24, 2011
June 1, 2011
June 13, 2011
June 20, 2011
August 8, 2011
August 15, 201
e
on Readings
ge | 29
1
Fairmea
Portable
A. PROJE
Reloca
B. BUDG
C. BOND
D. PROJE
Pr
This
JLS p
adow Elem
Relocation
ECT STATUS
ation of the po
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
roject complet
portable reloca
project. Refer to
mentary Sc
Project
ortable was com
LE SUMMARY
T REFERENCE: 6
W:
ted ahead of sc
tion project fun
o pg. 14
chool
mplete and occ
6.4
chedule on Aug
ded by main
cupied on Aug
gust 8, 2011.
ust 8, 2011.
Current Phase:
Schedule:
Architect Contrac
BOE Approval
Conceptual Desig
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (
BOE Approval
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates
( ) Denotes number
Occupancy
ct (2)
gn (2)
n (2)
(2)
ct (1)
d
pletion
ncy
– Subject to Change
of Board of Educatio
Pag
‐ August 8, 2011
February 15, 20
N/A
N/A
N/A
N/A
N/A
March 3, 2011
March 3, 2011
May 11, 2011
May 24, 2011
June 14, 2011
June 14, 2011
June 20, 2011
August 1, 2011
August 8, 2011
e
on Readings
ge | 30
011
Elemen
Interacti
Installati
A. PROJE
Install
system
classro
B. BUDG
C. BOND
D. PROJE
A
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
ntary Classr
ve Whitebo
ion
ECT STATUS
ation of Smar
ms were com
ooms and libra
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
ll SmartBoards
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
room Impr
ards and So
rtBoards and L
mpleted for a
aries in April 20
LE SUMMARY
T REFERENCE: 1
W:
s and Lightspee
unds
ment
y
ended
rovements
ound Assist S
Lightspeed sou
all elementar
011.
1.5 – 1.7
ed sound syste
$0
$2,004,889
$0
$2,004,889
$0
$0
$275,488
$1,729,401
$0
$2,004,889
93.9%
s
System
und assist
ry school
ems installed.
C
S
A
C
S
S
A
A
A
C
(
Current Phase: Co
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (2
BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
Completion
* Anticipated Dates – Su
( ) Denotes number of B
omplete ‐ May 15,
t (2)
n (2)
(2)
2)
t (1)
d
ubject to Change
Board of Education Readi
Pag
, 2011
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
November 9, 20
November 23, 2
February 25, 20
March 8, 2011
March 9, 2011
May 15, 2011
ings
ge | 31
010
2010
011
Palo Alt
Multi‐Us
A. PROJE
The fie
chang
B. BUDG
C. BOND
D. PROJE
Fi
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
to High Sch
se Field
ECT STATUS
elds were avai
e order negoti
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
eld was open f
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
hool
lable for play o
ations comple
LE SUMMARY
T REFERENCE: 4
W:
for use on Feb
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
on February 1,
ted on March
4.14
ruary 1, 2011.
$0
$2,609,680
$1,007,255
$3,616,935
$0
$1,506
$698,293
$2,916,682
$454
$3,616,935
100.0%
$269,300
$230,579
1.5%
Directives vs.
2011, and fina
9, 2011.
al
Current Phase:
Schedule:
Architect Contra
BOE Approval
Conceptual Desig
BOE Approval
Schematic Desig
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid
BOE Approval
Bid Opening
Award of Contra
Notice to Procee
Substantial Com
Planned Occupa
* Anticipated Dates
( ) Denotes number
Occupancy
ct (2)
gn (2)
n (2)
A
(2)
act (1)
ed
pletion
ncy
s – Subject to Chang
r of Board of Educati
Pag
y – February 1, 201
September 30
October 14, 20
N/A
N/A
November 18,
December 09,
March 19, 200
September 30
February 24, 2
March 17, 200
March 16, 201
April 7, 2010
June 1, 2010
January 31, 20
February 1, 20
e
ion Readings
ge | 32
11
, 2008
008
, 2008
2008
09
, 2009
2009
09
10
011
011
Gunn H
Industria
A. PROJE
This fa
receiv
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
High Schoo
al Arts Addit
ECT STATUS
acility was ava
ed on July 18,
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he building occ
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
l
tion and Ren
ailable for ins
2011.
LE SUMMARY
T REFERENCE: 3
W:
cupied as sche
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
novation
truction in Jan
3.1, 3.7, 3.11
duled, and the
$0
$5,082,402
$0
$5,082,402
$1,061
$88,985
$1,002,057
$3,990,300
$0
$5,082,402
99.3%
$349,000
$141,967
41.6%
Directives vs.
nuary 2010. D
e project comp
C
Sc
A
B
C
B
Sc
B
Su
A
A
B
B
A
N
Su
P
*
( )
DSA closeout
pleted within b
urrent Phase:
chedule:
Architect Contract
OE Approval
onceptual Design
OE Approval
chematic Design (
OE Approval
ubmit to DSA
Approval by DSA
Authorize to Bid (2
OE Approval
id Opening
Award of Contract
Notice to Proceed
ubstantial Comple
lanned Occupancy
Anticipated Dates –
) Denotes number of
udget.
Occupancy –
(2)
(2)
2)
)
(1)
etion
y
Subject to Change
f Board of Education
Pag
January 4, 2010
N/A
N/A
N/A
N/A
N/A
N/A
June 17, 2008
December 24, 20
October 14, 2008
October 28, 2008
December 16, 20
December 24, 20
January 6, 2009
November 25, 20
January 4, 2010
Readings
ge | 33
008
8
8
008
008
009
Gunn H
Aquatic C
A. PROJE
This fa
out wi
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
High Schoo
Center
ECT STATUS
acility was ava
ith DSA.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
his project com
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
l
ailable for use
LE SUMMARY
T REFERENCE: 3
W:
mpleted within
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
in July 2009, a
3.12
budget.
$0
$4,865,423
$0
$4,865,423
$0
$0
$647,169
$4,218,253
$0
$4,865,423
99.9%
$389,887
$195,148
49.9%
Directives vs.
and has been
C
Sc
A
B
C
B
Sc
B
S
A
A
B
B
A
N
S
P
*
( )
closed
Current Phase:
chedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
chematic Design (
BOE Approval
ubmit to DSA
Approval by DSA
Authorize to Bid (2
BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
ubstantial Comple
Planned Occupancy
Anticipated Dates –
) Denotes number of
Occupancy –
(2)
(2)
(2)
)
(1)
etion
y
– Subject to Change
f Board of Education
Pag
June 15, 2009
N/A
N/A
N/A
N/A
N/A
N/A
December 11, 20
April 24, 2008
April 8, 2008
April 22, 2008
May 28, 2008
June 4, 2008
December 6, 200
June 15, 2009
June 15, 2009
Readings
ge | 34
007
08
Middle
Jordan, J
A. PROJE
AEDIS
Board
progra
projec
transf
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
School Pre
J.L. Stanford
ECT STATUS
presented rec
of Education
am document
cts for pre‐de
erred to the pr
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
his project has
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
e‐Design
d and Terma
commended co
for approval o
s for the new
sign work hav
rogram conting
LE SUMMARY
T REFERENCE: 2
W:
been complet
unds
ment
y
ended
n
oncept plans fo
on September
w projects at
ve been close
gency on June
2.1 – 2.12
ted. Board app
$0
$56,488
$0
$56,488
$0
$0
$56,488
$0
$0
$56,488
96.8%
or each campu
r 8, which bec
each campus.
ed, and funds
14, 2011.
proval received
C
S
A
B
C
B
S
B
S
A
A
B
B
A
N
S
P
*
(
us to the
ame the
. These
s will be
d on Septembe
Current Phase:
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design (
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (2
BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
Substantial Comple
Planned Occupanc
* Anticipated Dates –
) Denotes number of
er 8, 2009.
Complete
(2)
(2)
(2)
2)
(1)
etion
y
– Subject to Change
fBoard of Education
Pag
October 28, 200
October 30, 200
June 23, 2009
September 8, 20
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
n Readings
ge | 35
8
8
009
Techno
A. PROJE
Equipm
use du
B. BUDG
C. BOND
D. PROJE
Eq
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
logy Impro
ECT STATUS
ment orders ha
uring the 2014/
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
quipment has
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies & Computers
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
ovements
ave arrived and
/15 school yea
LE SUMMARY
T REFERENCE: 1
W:
been installed
unds
ment
y
ended
d were deploy
ar.
1.5 – 1.7
for the 2014/1
$0
$10,485,054
$0
$10,485,054
$0
$6,850,644
$539,269
$3,095,142
$0
$10,485,054
92.2%
ed to the vario
15 school year
ous campuses f
r.
Current Phase:
Schedule:
Architect Contrac
BOE Approval
Conceptual Desig
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (
BOE Approval
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates
( ) Denotes number o
for
N/A
t (2)
n (2)
(2)
2)
t (1)
d
pletion
cy
– Subject to Change
of Board of Educatio
Pag
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
n Readings
ge | 36
Garland
Campus
A. PROJE
The Bo
hold u
The b
June 2
at the
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
d Elementa
Modernizat
ECT STATUS
oard of Educat
until a growth
oard voted to
2011. Discussio
elementary sc
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
his project has
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
ary School
tion
tion has put n
plan is establis
terminate the
ons with the B
chools are ongo
LE SUMMARY
T REFERENCE: 1
W:
been placed o
unds
ment
y
ended
ew developme
shed for the el
e lease with S
Board on future
oing.
1.1, 1.4 – 1.10
on hold.
$0
$22,178,544
$0
$22,178,544
$0
$0
$3,915,789
$17,400,000
$862,755
$22,178,544
1.3%
ent for Garland
ementary scho
Stratford Schoo
e plans for gro
C
S
A
B
C
B
S
B
S
A
A
B
B
A
N
S
P
*
(
d on
ools.
ol in
owth
Current Phase:
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (2
BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
Substantial Compl
Planned Occupanc
* Anticipated Dates –
( ) Denotes number o
On Hold
t (2)
n (2)
(2)
2)
t (1)
d
letion
cy
– Subject to Change
of Board of Education
Pag
October 28, 200
October 30, 200
February 10, 20
February 24, 20
June 2, 2009
June 23, 2009
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
n Readings
ge | 37
08
08
009
009
High Sc
Palo Alto
A. PROJE
The Bo
for bo
closed
reserv
B. BUDG
C. BOND
D. PROJE
M
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
hool Mast
o HS and Gu
ECT STATUS
oard of Educa
oth high scho
d, with funds t
ve funds.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
Master planning
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
ter Plan
nn HS
tion (BOE) app
ools, and the
transferred to
LE SUMMARY
T REFERENCE: 3
W:
g effort comple
unds
ment
y
ended
proved the ma
se projects h
o the respectiv
3.1 – 3.14, 4.1
ete.
$0
$285,387
$0
$285,387
$0
$0
$285,387
$0
$0
$285,387
86.2%
aster plans
have been
ve campus
– 4.14
C
S
A
G
G
G
(
Current Phase:
Schedule:
Architect Contract
BOE Approval
Initial Master Plan
BOE Approval
Paly CEQA Approv
BOE Approval
Gunn Master Plan
BOE Approval
Gunn CEQA Appro
BOE Approval
Master Plan Revis
Paly MP Revision A
Gunn MP Revision
* Anticipated Dates –
( ) Denotes number o
Complete
t (2)
n Approval (2)
val (2)
n Update (2)
oval (2)
sion Approval (2)
Approval (2)
n Approval (2)
– Subject to Change
of Board of Education
Pag
March 31, 2009
April 14, 2009
September 8, 20
September 22, 2
February 9, 201
February 23, 20
March 23, 2010
April 6, 2010
April 27, 2010
May 11, 2010
September 14, 2
October 9, 2010
October 12, 201
n Readings
ge | 38
9
009
2009
10
010
0
2010
0
10
Hoover
Pre‐Desig
A. PROJE
This p
eleme
B. BUDG
C. BOND
D. PROJE
Pr
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Elementa
gn
ECT STATUS
roject has bee
entary schools.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
roject is curren
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
ary School
n put on hold
LE SUMMARY
T REFERENCE: 1
W:
ntly on hold.
unds
ment
y
ended
until a growth
1.1 – 1.2, 1.4 –
$0
$70,550
$0
$70,550
$0
$0
$70,550
$60
$0
$70,550
81.0%
h plan is establ
– 1.10
C
S
A
B
C
S
B
S
A
A
B
B
A
N
S
P
*
(
ished for the
Current Phase:
Schedule:
Architect Contract
BOE Approval
Conceptual Design
Schematic Design
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (2
BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
Substantial Compl
Planned Occupanc
* Anticipated Dates –
( ) Denotes number o
On Hold
t (2)
n (2)
(2)
2)
t (1)
d
letion
cy
– Subject to Change
of Board of Education
Pag
April 27, 2010
May 11, 2010
November 9, 20
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
n Readings
ge | 39
010
Elemen
A. PROJE
The p
discus
planni
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
ntary Classr
ECT STATUS
project has be
ssions with t
ing.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
his project has
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
room Impr
een placed o
the BOE abo
LE SUMMARY
T REFERENCE: 1
W:
been placed o
unds
ment
y
ended
rovements
on hold pend
out elementa
1.5 – 1.7
on hold.
$0
$2,004,889
$0
$2,004,889
$0
$0
$275,488
$1,729,401
$0
$2,004,889
93.9%
s
ing further
ary growth
C
S
A
C
S
S
A
A
A
S
(
Phase 1 Schools:
Current Phase: O
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (2
BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
Substantial Comp
Planned Occupanc
* Anticipated Dates – Su
( ) Denotes number of B
Barron Park and E
n Hold
t (2)
n (2)
(2)
2)
t (1)
d
letion
cy
ubject to Change
Board of Education Readi
Pag
El Carmelo
June 8, 2010
June 22, 2010
N/A
N/A
November 9, 20
December 7, 20
December 23, 2
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
ings
ge | 40
010
010
2010
OHS WEST:260388860.1 A-1
EXHIBIT A
PALO ALTO UNIFIED SCHOOL DISTRICT
BOND PROJECT LIST
[Note: The order in which projects are listed is not an indication of priority for funding or completion. Not all listed
projects will be completed at every site.]
1. ELEMENTARY SCHOOL PROJECTS
Addison Barron Park Briones Duveneck El Carmelo
Escondido Fairmeadow Garland Greendell Hays
Hoover Nixon Ohlone Palo Verde
1. Construct new permanent classrooms and classroom buildings to accommodate enrollment
growth and expanded programs.
2. Replace temporary classrooms with permanent classrooms.
3. Acquire and install modular classrooms, as needed.
4. Expand libraries to accommodate enrollment growth.
5. Improve or provide new security systems, including alarms, lighting, locks, monitoring
systems, fencing, etc.
6. Upgrade climate control systems, including passive technologies to conserve energy, such as
shade canopies, energy-efficient windows, window coverings and shade control;
install/replace heating, ventilation and air conditioning.
7. Install/improve local area network (LAN) and wide area network (WAN) infrastructure to
accommodate technology upgrades; install/upgrade communications systems.
8. Building exterior and building shell renovation, including seismic structural upgrades and
Americans with Disability Act (ADA) improvements to bring all buildings to current code;
roofs; repainting and/or resurfacing.
9. Classroom and other school facilities modernization and building interior improvements,
including infrastructure and major building system upgrades.
10. Modernization/replacement of administration/multipurpose/library space.
Numbers Added
A-2
OHS WEST:260388860.1
2. MIDDLE SCHOOL PROJECTS
David Starr Jordan Jane Lathrop Stanford Terman
1. Construct new permanent classrooms and classroom buildings to accommodate enrollment
growth and expanded programs.
2. Classroom and other school facilities modernization and building interior improvements,
including infrastructure and major building system upgrades.
3. Construct extra school-wide storage space.
4. Expand classrooms and classroom wings, library and administration spaces.
5. Improve or provide new security systems, including alarms, lighting, locks, monitoring
systems, fencing, etc.
6. Upgrade climate control systems, including passive technologies to conserve energy, such as
shade canopies, energy-efficient windows, window coverings and shade control;
install/replace heating, ventilation and air conditioning.
7. Install/improve local area network (LAN) and wide area network (WAN) infrastructure to
accommodate technology upgrades; install/upgrade communications systems.
8. Renovate gymnasium, including new gym floors, doors, windows, bleachers and athletic
equipment; upgrade building infrastructure, including power and water distribution.
9. Renovate swimming pool and pool deck; new filtration system; new storage and restrooms;
upgrade pool equipment.
10. Replace and/or improve play fields, including drainage and irrigation, install water meters;
replace landscaping; re-surface and re-stripe hardcourts and replace outdoor athletic
equipment.
11. Repair/Replace and/or improve concrete walkways and asphalt; canopies; parking lot and
driveways.
12. Building exterior and building shell renovation, including seismic structural upgrades and
Americans with Disability Act (ADA) improvements to bring all buildings to current code;
roofs; repainting and/or resurfacing.
A-3
OHS WEST:260388860.1
3. GUNN HIGH SCHOOL PROJECTS
1. Construct new permanent classrooms and classroom buildings to accommodate enrollment
growth and expanded programs.
2. Demolish old library building.
3. Replace temporary classrooms with permanent classrooms.
4. Construct additional restrooms.
5. Construct second gymnasium.
6. Construct new soccer field.
7. Upgrade climate control systems, including passive technologies to conserve energy, such as
shade canopies, energy-efficient windows, window coverings and shade control;
install/replace heating, ventilation and air conditioning.
8. Install/improve local area network (LAN) and wide area network (WAN) infrastructure to
accommodate technology upgrades; install/upgrade communications systems.
9. Building exterior and building shell renovation, including seismic structural upgrades and
Americans with Disability Act (ADA) improvements to bring all buildings to current code;
roofs; repainting and/or resurfacing.
10. Improve or provide new security systems, including alarms, lighting, locks, monitoring
systems, fencing, etc.
11. Classroom and other school facilities modernization and building interior improvements,
including infrastructure and major building system upgrades.
12. Replace swimming pool with new 35-meter pool, pool equipment and support structures,
pool decking, bleachers, storage, restrooms, showers, associated equipment.
13. Renovate gymnasium; interior renovation including gymnasium floors and bleachers; replace
athletic equipment.
14. Modernize football stadium, including new bathrooms and concession stands.
A-4
OHS WEST:260388860.1
4. PALO ALTO HIGH SCHOOL PROJECTS
1. Construct new permanent classrooms and classroom buildings to accommodate enrollment
growth and expanded programs.
2. Replace temporary classrooms with permanent classrooms.
3. Construct additional restrooms.
4. Upgrade climate control systems, including passive technologies to conserve energy, such as
shade canopies, energy-efficient windows, window coverings and shade control;
install/replace heating, ventilation and air conditioning.
5. Install/improve local area network (LAN) and wide area network (WAN) infrastructure to
accommodate technology upgrades; install/upgrade communications systems.
6. Building exterior and building shell renovation, including seismic structural upgrades and
Americans with Disability Act (ADA) improvements to bring all buildings to current code;
roofs; repainting and/or resurfacing.
7. Classroom and other school facilities modernization and building interior improvements,
including infrastructure and major building system upgrades.
8. Library modernization and building interior improvements, including infrastructure and
major building system upgrades.
9. Renovation or replacement of the Tower Building to accommodate administration,
classroom and program support space.
10. Renovate Main Gymnasium and second gymnasium, including seismic upgrades; accessibility
improvements; construction of new restrooms; install new roofing; replace doors and
windows; replace gymnasium floors and athletic equipment, bleachers and renovation of
interior. Renovation or replacement of weight training facility.
11. Construct new theater building.
12. Renovate and improve soccer field, including new retaining wall and bleachers; new fencing
and storage.
13. Modernize football stadium, including replace bleachers; new bathrooms and concession
stands.
14. Replace and/or improve play fields, including drainage and irrigation, install water meters;
replace landscaping; re-surface and re-stripe hardcourts and replace outdoor athletic
equipment.
A-5
OHS WEST:260388860.1
5. OTHER DISTRICT-WIDE PROJECTS
Furnishing and equipping of existing and newly constructed, modernized or rehabilitated classrooms
and facilities on an ongoing basis, including to replace worn, broken, or out-of-date furniture and
equipment for all classrooms, athletic facilities and other facilities, as needed.
1. Replace existing or acquire new computers, technology and related equipment on an ongoing
basis.
2. Establish a planned maintenance fund to address maintenance work expected to be needed to
all District facilities on an ongoing basis (other than as may be necessary for current
maintenance, operation or repairs), in order to implement the District’s comprehensive facilities
maintenance plan.
3. Acquisition of any of the facilities on the Bond Project List through temporary lease or lease-
purchase arrangements, or execute purchase option under a lease for any of these authorized
facilities.
4. If and as opportunities become available, and to the extent the Board of Education determines
that bond funds are available for the purpose, acquisition of land and other interests in real
property for future school buildings and other District facilities, and construction of such
facilities, and rehabilitation/renovation of District-owned buildings and sites not otherwise
listed.
5. Repair, upgrade, modify, expand, refinish, replace and construct site improvements, including
off-street parking areas, pickup/dropoff, signage, paths, sidewalks and walkways, canopies, hard
courts (student play areas), athletic play fields, landscaping, irrigation, permanent athletic field
equipment and facilities (including nets, basketball standards, goals and goalposts, backstops),
field lighting, etc.
6. ADDITIONAL NECESSARY AND INCIDENTAL PROJECTS
1. Remove, dispose of, and otherwise remediate hazardous materials, including asbestos, lead,
etc., where necessary.
2. Address unforeseen conditions revealed by construction/modernization (including plumbing
or gas line breaks, dry rot, seismic, structural, etc.).
3. Other improvements required to comply with existing building codes, including the Field Act,
and access requirements of the Americans with Disabilities Act (ADA).
4. Site preparation/restoration in connection with new construction, renovation or remodeling,
or installation or removal of relocatable classrooms, including ingress and egress, demolition
of existing structures, removing, replacing, or installing irrigation and drainage, utility lines
(such as gas lines, water lines, electrical lines, sewer lines, and communication lines), trees and
landscaping, relocating fire access roads, traffic lights and mitigation, and acquiring any
necessary easements, licenses, or rights of way to the property.
5. Rental or construction of storage facilities and other space on an interim basis, as needed to
accommodate construction materials, equipment, and personnel, and interim classrooms
(including relocatables) for students and school functions or other storage for classroom
materials displaced during construction.
A-6
OHS WEST:260388860.1
7. RENOVATION/MODERNIZATION (DEFINED)
For purposes of the Bond Project List, renovation and modernization projects are intended to
restore the building systems and infrastructure, weather protections, finishes, and technology, or
reallocate and reorganize space, to a condition that will provide a sustainable, functional educational
and administrative environment for future years, comparable to new construction.
Renovation projects may include, but are not limited to nor necessarily encompass, all of the
following, depending upon the age, condition and needs of each particular school facility:
1. upgrade electrical, communication, fire alarm, and similar building systems as well as main
power service and distribution, which may include active and passive solar power and
heating system acquisition, installation and construction
2. Replace, repair or upgrade plumbing, piping and drainage systems, including water supply,
meters, water heating, and wastewater systems, plumbing fixtures and sinks, etc., within
buildings and sites and to connect with city supply and drainage systems
3. Replace or modify aging heating, ventilation and air cooling systems with energy-efficient
heating and air cooling systems (HVAC), including installing energy management systems
(EMS);
4. Replace, modify, upgrade interior lighting and exterior safety/security lighting systems and
fixtures, as necessary;
5. Repair, modify and construct structural elements of the existing structure as necessary;
6. Replace or repair aging roofs with similar materials or District standard materials;
7. Replace, repair, install and construct, as necessary, interior walls, floor and ceiling finishes,
doors, door locks, windows, cabinets and casework, and equipment attached to wall surfaces
(including white boards, marker boards, tack boards, television mounts, scoreboards, fire
extinguishers, kitchen cabinets/equipment, etc.);
8. Upgrade, modify and construct restroom facilities;
9. Comply, as necessary, with Americans with Disabilities Act (ADA) and Title 24
requirements;
10. Refinish the exterior finishes of the school (including stucco, wood and metal trims, wood
siding, paint, etc.); replace doors and windows
11. Modify, expand, separate, convert and construct school support areas; staff work and lunch
areas; and educational areas to provide adequate, functional environments;
12. Modify, replace and construct functional components of altered or replaced building
components (including rainwater leaders, fascias, mansards, etc.);
For any project involving renovation, modernization, remodeling or rehabilitation of a
building or the major portion of a building, the District may proceed with new replacement
construction instead (including any necessary demolition), if the Board of Education
determines that replacement and new construction is more practical than rehabilitation and
renovation, considering the building’s age, condition, expected remaining life, comparative
cost, and other relevant factors.