Monthly Reports 2014-07 (Jul)
MMOOOONNTTHH
Cap
HHLLYY PPRR
T
July
Strong S
pital Impr
P
fs
RROOGGRREE
Through
y 201
Schools B
rovement
repared by
s3|Hodges
EESSSS RREE
14
Bond
t Projects
EEPPOORRTT
s
Pa
TT
age | 1
TABLE O
Executive
At
Capital Pro
G
G
G
Pa
Pa
Pa
Pa
J.
D
Te
Completed
G
G
G
Pa
Pa
Jo
J.
Te
Fa
O
Pr
Jo
G
J.
Fa
El
Pa
G
G
M
Inactive Ca
G
H
H
El
Appendix
Ex
OF CONTEN
Summary
ttachment 1 –
ojects
unn High Scho
unn High Scho
unn High Scho
alo Alto High S
alo Alto High S
alo Alto High S
alo Alto High S
L. Stanford Mid
uveneck Eleme
echnology
d Capital Proje
unn High Scho
unn High Scho
unn High Scho
alo Alto High S
alo Alto High S
ordan Middle S
L. Stanford Mid
erman Middle
airmeadow Ele
hlone Element
roperty Acquis
ordan Middle S
unn High Scho
L. Stanford Mid
airmeadow Ele
lementary Clas
alo Alto High S
unn High Scho
unn High Scho
Middle School P
apital Projects
arland Elemen
igh School Ma
oover Element
lementary Clas
xhibit A – Bond
NTS
Consolidated
ool – Phase I ‐ P
ool – E and K (L
ool – Central Bu
School – New C
School – Perfor
School – Scienc
School – New G
ddle School
entary School –
ects
ool – New Class
ool – New Gym
ool – Existing G
School – Athlet
School – Hayma
School
ddle School – L
School
ementary Scho
tary School
sition – 525 San
School – Interim
ool – Air Condit
ddle School – I
ementary Scho
ssroom Improv
School – Multi‐
ool – Industrial
ool – Aquatic Ce
Pre‐Design
ntary School
ster Plan
tary School
ssroom Improv
d Project List
Expenditure R
Parking and Dr
31 and MS) Bu
uilding Project
Classroom Build
rming Arts Cen
ce Building Add
Gymnasium
– New Classroo
sroom Building
nasium
ymnasium Mo
ic Stadium Imp
arket and Tow
Landscape and
ol – New Class
n Antonio Rd
m Classrooms
tioning of Exist
Interim Classro
ol – Portable R
vements – Inte
use Field
Arts Renovatio
enter
vements
eport
op‐off Sitewor
uildings Renova
ding and Medi
ter
dition
om Buildings a
g and World La
odernization
provements
er Building Imp
d Site Improvem
sroom Building
ting Buildings
ooms
Relocation
ractive Whiteb
on
rk Improvemen
ation
a Arts
and Moderniza
anguages Build
provements
ments
gs and Modern
board & Sound
nt
ation
ing
nization
d Assist System
Pa
page 3
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
m page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
age | 2
Gunn High
Offsite asp
the site to
Arastrader
Gunn High
AM Woo c
alarm test
complete b
Gunn High
DLM conti
and three
summer br
Palo Alto H
Occupancy
2014 at th
2014.
Palo Alto H
Alten Con
contractor
site, locate
pedestrian
Palo Alto H
The constr
constraints
into two in
work on co
Palo Alto H
Jeremiah T
access com
constructa
completion
Duveneck
Alpha Bay
classroom
field area
substantia
Technolog
Equipment
year.
h School – Mira
phalt and concr
o prepare for
ro and Miranda
h School – E an
completed floo
ing, smartboar
by August 11, 2
h School – Cent
nued design de
additional clas
reak, with an a
High School – N
y of the buildin
he new Math/S
High School – P
struction inst
r mobilized con
ed existing un
n, bicycle and v
High School – S
ruction schedu
s and access to
nterim science
onstruction do
High School – I
Tolbert Archite
mpliance appro
ability review
n of a bid set s
Elementary Sc
Builders (ABB)
building. Co
was installed
lly complete a
gy
t orders have a
anda Ave. Dro
rete paving, st
the opening o
a will be put ou
nd K (L‐31 and
oring, painting
rd installation,
2014.
tral Building P
evelopment of
ssrooms to the
anticipated sub
New Math/Soc
ngs was comple
Social Sciences
Performing Art
alled tree pro
nstruction trail
nderground ut
vehicle improve
Science Buildin
ule has been a
o the site. Also
e labs this sum
cuments in Jan
Indoor PE and
ects returned
ovals. The fina
comments an
cheduled for m
chool – New C
) completed in
mmissioning c
and will rem
nd ready for m
arrived and are
EXECUT
p‐Off (Phase I
riping, and gra
of school in e
ut to bid in Sep
MS) Buildings
, and cabinet,
, glazing, settin
roject
f the two‐story
e base program
bmission to DSA
cial Sciences B
eted in July 20
s building, wh
ts Center (PAC
otection meas
ers on July 7, 2
tilities, and be
ements will be
ng Addition
adjusted to oc
o, as part of th
mer to meet a
nuary 2015, wi
Athletic Facili
to DSA for ba
l DSA approva
nd finalizing t
mid‐Septembe
lassroom Build
nstallation of ex
commenced on
main fenced of
move‐in on Aug
e being deploy
IVE SUMM
‐ Parking and
ding work is co
early August 2
ptember 2014
Renovation
door, window
ng of acoustica
y option that a
m. DLM plans
A in December
Building and M
14. Move in o
ile move in of
C)
sures and con
2014. Alten cl
egan installatio
e in place by Au
ccur after cons
his project, exi
additional scie
th submittal to
ties
ackcheck on Ju
l for structura
the lease‐leas
r 2014.
dings and Mod
xterior metal r
n July 31, 201
ff for a few w
gust 11, 2014.
yed to the vario
MARY
Drop‐Off Impr
omplete. Grad
2014. The Cou
and plan for co
w frame install
al ceiling tiles,
adds a wellness
to review the
r 2014.
Media Arts Buil
of teacher mate
f Media Arts fu
nstruction fen
eared the site,
on of new ga
ugust 11, 2014
struction of th
isting portable
nce classroom
o DSA planned
uly 30, 2014 a
l is anticipated
seback agreem
dernization
railing and red
14 and punch l
weeks to esta
ous campuses
rovements)
deTech, Inc. ant
unty traffic sig
ompletion by D
ation. Before
and lighting a
s center, colleg
plans with sta
ding
erials and furn
urniture was c
ncing on June
, installed tem
s and water s
4.
he new gymna
es in the quad
m capacity need
d for June 2015
nd received fi
d in early Augu
ment are also
dwood soffits o
list also comm
blish growth.
for use during
Pa
ticipates clean
gnal replaceme
December 201
school resume
are anticipated
ge and career
aff upon return
niture started i
complete by Ju
30, 2014 an
porary power
services. Temp
asium, due to
are being reno
ds. DLM will re
5.
ire/life & safet
ust 2014. Addr
o in progress,
of the new two
menced. Sod f
All buildings
g the 2014/15
age | 3
ning up
ent on
14.
es, fire
d to be
center
n from
n June
uly 31,
nd the
to the
porary
space
ovated
esume
ty and
ressing
, with
o‐story
for the
s were
school
COMPLETE
Gunn High
The new M
Building cla
Gunn High
The new g
The tennis
Gunn High
The moder
Palo Alto H
The conces
the Fall 20
Palo Alto H
All Trusty B
Jordan Mid
Students o
J.L. Stanfo
Students o
J.L. Stanfo
Scapes com
Terman M
Students
moderniza
Fairmeado
Students o
525 San An
This site ha
Ohlone Ele
Move‐in to
new buildi
Jordan Mid
The portab
Gunn High
Best Contr
summer 20
ED CAPITAL PR
h School – New
Math and Eng
assrooms were
h School – New
gymnasium wa
courts were c
h School – Exist
rnized Bow gym
High School – A
ssions building
13 season.
High School – H
Builders compl
ddle School
occupied all new
rd Middle Sch
occupied all new
rd Middle Sch
mpleted the pr
iddle School
occupied the
ation was comp
ow Elementary
occupied all new
ntonio Road –
as been leased
ementary Scho
o the new bui
ng on January
ddle School ‐ I
bles were insta
h School – Air C
racting Service
011.
ROJECTS
w Classroom Bu
lish Building w
e occupied in F
w Gymnasium
s occupied on
ompleted Aug
ting Gymnasiu
m was occupie
Athletics Stadi
g, track re‐surfa
Haymarket an
leted the insta
w and modern
ool
w and modern
ool – Landscap
roject on sched
new instruct
pleted in Octob
y School – New
w and modern
Site Acquisitio
d to Athena Aca
ool – New Clas
lding and othe
3, 2012.
nterim Classro
alled and move
Conditioning o
es Inc. comple
uilding and Wo
was occupied
February, 2013
June 7, 2013 a
ust 27, 2013.
um Modernizat
ed by the camp
ium Improvem
acing, new orn
d Tower Build
llation of the n
nized buildings
nized buildings
pe and Sitewo
dule in the fall
tional spaces
ber 2013.
w Classroom Bu
nized buildings
on
ademy.
ssroom Buildin
er existing clas
ooms
ed into for fall 2
of Existing Build
eted the instal
orld Language
by staff and s
3.
and PE classes
tion
pus on Novemb
ments
namental fence
ing Improvem
new windows o
in fall 2013.
in fall 2013.
rk Improveme
2013.
and modern
uilding and Mo
in fall 2013.
ng and Modern
ssrooms occur
2011. DSA clos
dings
llation of air c
s Building
students on A
s were held in
ber 4, 2013.
e, signage and
ments
on August 9, 20
ents
ized buildings
odernization
nization
rred in Decem
seout received
conditioning u
ugust 15, 201
the new gym
entry lighting
013.
s in fall 2013
ber 2011. Stu
d November 19
units and cool
Pa
3. World Lan
on August 15,
were complet
3. The cafet
udents occupie
9, 2012.
roof coating
age | 4
nguage
2013.
ted for
torium
ed the
in the
J.L. Stanfo
Coulter Co
Fairmeado
Relocation
Elementar
Installation
classrooms
Palo Alto H
The fields w
2011.
Gunn High
This facility
Gunn High
This facility
Middle Sch
These proj
INACTIVE C
Garland El
The Board
elementar
High Schoo
The Board
closed.
Hoover Ele
This projec
Elementar
The projec
rd Middle Sch
onstruction com
ow Elementary
n of the portab
ry Classroom Im
n of SmartBoa
s and libraries
High School – M
were available
h School – Indu
y was available
h School – Aqu
y was available
hools Pre‐Desi
ects for pre‐de
CAPITAL PROJ
ementary Sch
of Education
y schools.
ol Master Plan
of Education
ementary Scho
ct has been put
ry Classroom Im
ct has been pla
ool ‐ Interim C
mpleted the wo
y School – Port
le was comple
mprovements
ards and Ligh
in April 2011.
Multi‐use Field
e for play on Fe
ustrial Arts Add
e for instructio
atic Center
e for use in July
ign – Jordan, J.
esign work hav
ECTS
ool Renovatio
has put new d
n
(BOE) approv
ool – Pre‐Desig
t on hold until
mprovements
ced on hold pe
Classrooms
ork on the relo
table Relocatio
te and occupie
– Installation
htspeed sound
d
ebruary 1, 201
dition & Renov
n in January 20
y 2009, and ha
.L. Stanford an
ve been closed
n
development f
ved the maste
gn
a growth plan
– Phase 1 Sch
ending further
No Boa
ocated portable
on
ed on August 8
of Interactive
d assist system
1, and final ch
vation
010. DSA close
s been closed
nd Terman
.
for Garland on
r plans for bo
is established
ools Barron Pa
discussions w
rd Actions in J
es in August 20
8, 2011.
Whiteboards
ms were com
hange order ne
eout received o
out with DSA.
n hold until a g
oth high schoo
d for the eleme
ark and El Carm
ith the BOE ab
July
011.
and Sound As
pleted for all
egotiations com
on July 18, 201
growth plan is
ols, and these
entary schools.
melo
bout elementar
Pa
ssist Systems
elementary
mpleted on Ma
11.
s established f
projects have
ry growth plan
age | 5
school
arch 9,
for the
e been
nning.
A B C C / A B - C C / B A - BGunn High School - High School Master Plan 172,390 166,328 138,714 80.5% 27,614 83.40% 6,062Gunn High School 1 - Aquatic Center 4,865,425 4,862,530 4,862,530 99.9% 0 100.00% 2,895Gunn High School 2 - I.A Building 5,082,402 5,065,128 5,065,128 99.7% 0 100.00% 17,274Gunn High School 3 - AD2- close out 5,777 5,777 5,777 100.0% 0 100.00% 0Gunn High School 4 - New classroom Buildings 25,035,201 24,755,495 24,755,495 98.9% 0 100.00% 279,706Gunn High School 5 - Parking & Drop Off improvements 3,940,000 1,971,562 1,372,034 34.8% 599,528 69.59% 1,968,438Gunn High School 6- New/Auxiliary Gymnasium 12,914,800 12,455,903 12,308,170 95.3% 147,733 98.81% 458,897Gunn High School 7- A/C 2,600,000 2,102,366 2,102,366 80.9% 0 100.00% 497,634Gunn High School 8 - MS & L-31 Buildings 2,120,839 1,687,604 613,792 28.9% 1,073,812 36.37% 433,235Gunn High School 9 - Central building 19,374,242 207,615 63,715 0.3% 143,900 30.69% 19,166,627Gunn High School - Reserved 0 0 0 0.0% 0 0.00% 0Palo Alto High Schools - High School Master Plan 172,999 167,759 161,616 93.4% 6,143 96.34% 5,240Palo Alto High School 1 - Stadium Field 5,090,000 4,749,887 4,749,887 93.3% 0 100.00% 340,113Palo Alto High School 2 - Multi-Use Field (Multi-Fund) 2,609,680 2,609,680 2,609,680 100.0% 0 100.00% 0Palo Alto high School 3 - New classroom & Media Art Building 38,415,003 36,188,953 34,727,311 90.4% 1,461,642 95.96% 2,226,051Palo Alto High School 4 - New Theater 29,370,049 26,648,272 1,419,441 4.8% 25,228,831 5.33% 2,721,777Palo Alto High School 5 - Haymarket and Tower Admin. Building 1,499,999 1,260,933 1,260,933 84.1% 0 100.00% 239,066Palo Alto High School 6- Science Addition 5,532,204 974,129 336,184 6.1% 637,945 34.51% 4,558,075Paly 7- indoor phusical ed and athletic facilities 350,000 172,719 164,917 47.1% 7,802 95.48% 177,281Palo Alto High School - Reserved 18,474,443 0 0 0.0% 0 0.00% 18,474,443Jordan Middle School -Program Management- MS Pre-Design 18,890 17,826 17,826 94.4% 0 100.00% 1,064Jordan Middle Schools 1- Interim Classrooms 600,342 488,033 488,033 81.3% 0 100.00% 112,309Jordan Middle School 2- Improvements 19,891,564 19,034,881 17,989,553 90.4% 1,045,328 94.51% 856,683J.L.S Middle School - Program Management- MS Pre-Design 18,799 18,408 18,408 97.9% 0 100.00% 391J.L.S Middle School 1 - Interim Classrooms 446,844 422,500 422,500 94.6% 0 100.00% 24,344 J.L.S Middle School 2- Improvements 17,184,699 15,496,634 15,383,589 89.5% 113,045 99.27% 1,688,065Terman Middle School - Program Management- MS Pre-Design 18,799 18,423 18,423 98.0% 0 100.00% 376Terman Middle School 1- Improvements 13,312,971 13,002,936 12,888,252 96.8% 114,684 99.12% 310,035PAUSD Elementary Schools - Program Management- Elem. Growth Plan 145,000 98,480 92,290 63.6% 6,190 93.71% 46,520Addison Elementary School 1-Phase I 21,267 21,267 21,267 100.0% 0 100.00% 0Duveneck Elementary School 1-Phase I 9,778,358 9,485,042 8,186,278 83.7% 1,298,764 86.31% 293,316Garland Elementary School 1- Phase I 22,178,544 280,113 280,113 1.3% 0 100.00% 21,898,431Fairmeadow Elementary School 1- Phase I 7,796,550 7,482,676 7,352,644 94.3% 130,032 98.26% 313,874Hoover Elementary School 1-Phase I 70,550 57,165 57,165 81.0% 0 100.00% 13,385Ohlone Elementary School 1- Phase I 10,597,870 10,481,389 10,481,389 98.9% 0 100.00% 116,481Elementary Schools 1 - Elementary Classroom Improvements 2,004,889 1,879,695 1,879,695 93.8% 0 100.00% 125,194Elementary Schools - Reserved 37,585,253 0 0 0.0% 0 0.00% 37,585,253PAUSD - Program Management 12,657,031 9,675,734 8,636,935 68.2% 1,038,799 89.26% 2,981,297PAUSD - Technology 10,485,054 9,637,340 9,637,340 91.9% 0 100.00% 847,714PAUSD - Technology -Reserved 3,422,312 0 0 0.0% 0 0.00% 3,422,312PAUSD - Reserved 6,043,535 0 0 0.0% 0 0.00% 6,043,535525 San Antonio -Property Acquisition 8,500,000 8,500,000 8,500,000 100.0% 0 100.00% 0Bond Issuance Cost & Other Transfer Out 20,288,777 20,288,777 20,288,777 100.0% 0 100.00% 0Total380,693,351 252,439,958 219,358,166 33,081,792 128,253,393Prepared by: Business Services Department based on QSS accounting SystemBudget BalanceCommittedBudgetSchool Name - Project NamePercent of Budget ExpendedPalo Alto Unified School DistrictStrong Schools Bond7/31/2014Percent of ExpendedContract BalanceExpenditures
Gunn H
Miranda
Phase I –
A. PROJE
Offsite
compl
for the
replac
Septem
B. BUDG
C. BOND
D. PROJE
Ph
im
th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
High Schoo
Ave. Drop O
– Parking an
ECT STATUS
e asphalt and
ete. GradeTec
e opening of sc
cement on Ara
mber 2014 and
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
hase I, Mirand
mprovements w
his fall.
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
l
Off
d Drop‐off I
d concrete pa
ch, Inc. anticip
chool in early A
astradero and
d plan for com
LE SUMMARY
T REFERENCE: 5
W:
a Ave. parking
was delayed by
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
mprovemen
aving, striping,
pates cleaning
August 2014. T
d Miranda will
pletion by Dec
5.5
and drop‐off p
y City of Palo A
$0
$3,940,000
$0
$3,940,000
$0
$0
$919,858
$2,919,840
$100,302
$3,940,000
38.4%
$121,380
$121,380
0.0%
Directives vs.
nts
, and grading
up the site to
The County tra
l be put out
cember 2014.
project is proce
Alto permit cha
C
S
A
B
C
B
S
B
A
B
S
A
B
A
N
S
*
(
g work is
o prepare
ffic signal
to bid in
eeding within
anges, with sig
Current Phase:
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design
BOE Approval
Authorize to Bid (2
BOE Approval
Submit to DSA
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Compl
* Anticipated Dates –
( ) Denotes number o
budget. Comp
nal work now
Construction
t (2)
n (2)
(2)
2)
t (1)
d
letion
– Subject to Change
of Board of Education
Pa
letion of off‐si
scheduled to o
n
March 31, 2009
April 14, 2009
June 19, 2012
June 26, 2012
December 18, 2
January 15, 201
June 11, 2013
June18, 2013
July 17, 2013
October 2, 2013
November 12, 2
November 19, 2
December 4, 20
August 8, 2014*
n Readings
age | 6
te
occur
9
2012
13
3
2013
2013
013
*
Gunn H
E and K (
A. PROJE
AM W
frame
smart
lightin
B. BUDG
C. BOND
D. PROJE
Co
20
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
High Schoo
(MS and L‐31
ECT STATUS
Woo complete
installation.
board installat
ng are anticipat
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
onstruction is
014.
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
l
1) Buildings
ed flooring, pa
Before sch
tion, glazing, s
ted to be comp
LE SUMMARY
T REFERENCE: 3
W:
proceeding acc
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
Renovation
ainting, and c
ool resumes,
setting of acou
plete by Augus
3.4, 3.5, 3.13
cording to sche
$0
$2,120,839
$0
$2,120,839
$0
$0
$428,000
$1,690,552
$2,287
$2,120,839
28.9%
$122,800
$122,800
0.0%
Directives vs.
n
cabinet, door,
, fire alarm
ustical ceiling t
st 11, 2014.
edule and with
window
testing,
tiles, and
hin budget. Oc
Current Phase:
Schedule:
Architect Contrac
BOE Approval
Conceptual Desig
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Authorize to Bid (
BOE Approval
Approval by DSA
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates
( ) Denotes number o
ccupancy sched
Constructio
t (2)
n (2)
(2)
2)
t (1)
d
pletion
cy
– Subject to Change
of Board of Educatio
Pa
duled for Augu
n
March 31, 2009
April 14, 2009
September 8, 2
September 22,
June 11, 2013
June 18, 2013
November 25, 2
March 25, 2014
April 22, 2014
March 27, 2014
April 29, 2014
May 20, 2014
May 27, 2014
August 11, 2014
August 15, 2014
n Readings
age | 7
ust 13,
9
009
2009
2013
4
4
4*
4*
Gunn H
Central B
A. PROJE
DLM c
that a
three
review
with a
B. BUDG
C. BOND
D. PROJE
D
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
High Schoo
Building Proj
ECT STATUS
continued desig
dds a wellness
additional clas
w the plans wit
an anticipated s
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
esign developm
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
l
ject
gn developme
s center, colleg
ssrooms to the
th staff upon re
submission to
LE SUMMARY
T REFERENCE: 5
W:
ment drawings
unds
ment
y
ended
nt of the two‐s
ge and career c
base program
eturn from sum
DSA in Decem
5.5
s are in progres
$0
$19,374,242
$0
$19,374,242
$0
$0
$3,237,823
$15,936,419
$200,000
$19,374,242
0.3%
story option
center and
m. DLM plans t
mmer break,
ber 2014.
ss.
C
S
A
B
C
B
S
B
S
A
B
A
B
A
N
S
*
(
o
Current Phase:
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design (
BOE Approval
Submit to DSA
Authorize to Bid (2
BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Comple
* Anticipated Dates –
) Denotes number of
Design Develo
(2)
(2)
(2)
2)
(1)
etion
– Subject to Change
f Board of Education
Pa
opment
March 31, 2009
April 14, 2009
February 25, 201
March 11, 2014
June 3, 2014
June 17, 2014
December 2, 201
June 7, 2015*
June 21, 2015*
June 25, 2015*
August 12, 2015
August 29, 2015
September 10, 2
January, 2017*
n Readings
age | 8
14
14*
*
*
2015*
Palo Alt
Classroo
A. PROJE
Occup
mater
buildin
2014.
B. BUDG
C. BOND
D. PROJE
Fu
O
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
to High Sch
m Building a
ECT STATUS
pancy of the bu
rials and furnitu
ng, while mov
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
urniture install
ccupancy of th
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
hool
and Media A
uildings was co
ure started in J
ve in of Media
LE SUMMARY
T REFERENCE: 4
W:
ation and occu
he building sch
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
Arts
ompleted in Ju
June 2014 at th
a Arts furnitur
4.1 ‐ 4.3
upancy of the M
eduled for Aug
$0
$38,415,001
$0
$38,415,001
$18,448
$1,325,333
$7,261,915
$29,713,481
$95,826
$38,415,001
90.4%
$2,515,000
$85,252
9.7%
Directives vs.
uly 2014. Mov
he new Math/S
re was comple
Media Arts and
gust 1, 2014.
ve in of teache
Social Sciences
ete by July 31
d Math/Social
Current Phase:
Schedule:
Architect Contrac
BOE Approval
Conceptual Desig
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Authorize to Bid (
BOE Approval
Approval by DSA
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates
( ) Denotes number o
r
s
1,
Sciences build
Occupancy –
t (2)
n (2)
(2)
2)
t (1)
d
pletion
cy
– Subject to Change
of Board of Educatio
Pa
dings complete
– August 1, 2014
March 31, 2009
April 14, 2009
September 8, 2
September 22,
January 12, 201
January 26, 201
August 4, 2010
March 8, 2011
March 22, 2011
April 28, 2011
June 30, 2011
July 12, 2011
August 4, 2011
April 15, 2014
August 1, 2014*
n Readings
age | 9
ed.
9
009
2009
10
10
1
*
Palo Alt
Performi
A. PROJE
Alten
constr
mobili
site, i
under
service
will be
B. BUDG
C. BOND
D. PROJE
Co
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
to High Sch
ing Arts Cen
ECT STATUS
Construction
ruction fencin
ized construct
installed temp
ground utilitie
es. Temporary
e in place by Au
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
onstruction is
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
hool
nter (PAC)
n installed tr
ng on June
ion trailers on
porary power
es, and began i
y pedestrian, b
ugust 11, 2014
LE SUMMARY
T REFERENCE: 4
W:
proceeding acc
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
ree protectio
30, 2014 an
July 7, 2014.
r to the site
nstallation of
bicycle and veh
4.
4.11
cording to sche
$0
$29,370,049
$0
$29,370,049
$0
$0
$4,377,871
$24,845,000
$147,178
$29,370,049
4.8%
$2,184,400
$2,184,400
0%
Directives vs.
n measures
nd the contra
Alten cleared
, located exi
new gas and w
hicle improvem
edule and with
C
S
A
B
C
B
S
B
B
S
A
A
B
B
A
N
S
P
*
(
and
actor
d the
isting
water
ments
hin budget.
Current Phase:
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design (
BOE Approval
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (2
BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
Substantial Comple
Planned Occupanc
* Anticipated Dates –
) Denotes number of
Construction
(2)
n (2)
(3)
2)
(1)
etion
cy
– Subject to Change
f Board of Education
Pag
n
March 31, 2009
April 14, 2009
June 1, 2010
June 22, 2010
June 14, 2011
December 13, 20
January 17, 2012
March 28, 2013
January 16, 2014
January 14, 2014
January 28, 2014
May 13, 2014
June 3, 2014
June 23, 2014
February 13, 201
June 1, 2016*
n Readings
ge | 10
011
2
4
4
4
16*
Palo Alt
Science B
A. PROJE
The c
after c
constr
projec
renova
meet
will re
2015,
B. BUDG
C. BOND
D. PROJE
D
w
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
to High Sch
Building Add
ECT STATUS
onstruction sc
construction o
raints and acc
ct, existing p
ated into two
additional scie
esume work o
with submitta
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
esign developm
will not begin un
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
hool
dition
chedule has b
of the new gy
ess to the site
portables in
interim scien
ence classroom
n construction
l to DSA plann
LE SUMMARY
T REFERENCE: 4
W:
ment will resum
ntil after comp
unds
ment
y
ended
been adjusted
mnasium, due
e. Also, as pa
the quad a
ce labs this su
m capacity ne
n documents i
ed for June 20
4.1 ‐ 4.3
me in January
pletion of the G
$0
$5,532,204
$0
$5,532,204
$0
$60,309
$842,825
$4,628,294
$776
$5,532,204
6.1%
to occur
e to space
art of this
are being
ummer to
eeds. DLM
in January
15.
for anticipated
Gymnasium pro
C
S
A
B
C
B
S
B
S
A
B
A
B
A
N
S
P
*
(
d submittal to
oject.
Current Phase:
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design (
BOE Approval
Submit to DSA
Authorize to Bid (2
BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Comple
Planned Occupanc
* Anticipated Dates –
) Denotes number of
DSA in June 20
Design Devel
(2)
n (2)
(2)
2)
(1)
etion
cy
– Subject to Change
f Board of Education
Pag
015. Construct
lopment
March 12, 2013
March 19, 2013
March 12, 2013
March 19, 2013
September 10, 2
October 8, 2013
June 15, 2015*
February 2, 2016
February 19, 201
March 15, 2016*
May 30, 2016*
June 15, 2016*
July 1, 2016*
August 1, 2017*
August 15, 2017
n Readings
ge | 11
tion
2013
6*
16*
*
*
Palo Alt
Indoor P
A. PROJE
Jerem
July 3
compl
anticip
review
are als
mid‐Se
B. BUDG
C. BOND
D. PROJE
D
Va
A
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
to High Sch
E and Athlet
ECT STATUS
iah Tolbert Ar
30, 2014 and
iance approva
pated in early
w comments a
so in progress
eptember 2014
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
SA backcheck f
ance Brown Bu
ugust, with a b
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
hool
tic Facilities
rchitects retur
d received fi
als. The final
y August 2014
and finalizing t
s, with comple
4.
LE SUMMARY
T REFERENCE: 4
W:
for structural s
uilders and Tol
bid set schedul
unds
ment
y
ended
s
rned to DSA f
ire/life & saf
DSA approval
4. Addressing
the lease‐lease
tion of a bid s
4.1 ‐ 4.3
scheduled for e
bert Architects
ed to be ready
$0
$350,000
$0
$350,000
$0
$0
$225,000
$125,000
$0
$350,000
47.1%
for backcheck
fety and acc
l for structura
g constructabi
eback agreem
set scheduled
early August, 2
s will be comp
y for bidding in
C
S
A
B
C
B
S
B
S
R
A
L
A
N
S
P
*
(
on
cess
al is
ility
ent
for
2014.
leting construc
n mid‐Septemb
Current Phase:
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Re‐Submit to DSA
Approval by DSA
Lease Leaseback A
Award of Contract
Notice to Proceed
Substantial Compl
Planned Occupanc
* Anticipated Dates –
( ) Denotes number o
ctability and sc
ber.
DSA Review
t (2)
n (2)
(2)
Agreement
t (1)
d
letion
cy
– Subject to Change
of Board of Education
Pag
cope clarificati
N/A
N/A
March 12, 2013
March 19, 2013
September 10, 2
October 8, 2013
December 4, 20
January 27, 201
August 15, 2014
November 18, 2
November 18, 2
December 1, 20
June 1, 2016*
August 15, 2016
n Readings
ge | 12
ons in
3
3
2013
3
013
14
4*
2014*
2014*
014
6*
Duvene
New Clas
A. PROJE
Alpha
metal
classro
2014
was in
establ
ready
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
eck Elemen
ssroom Buil
ECT STATUS
Bay Builders
railing and
oom building.
and punch list
nstalled and w
ish growth. A
for move‐in on
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project is pr
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
ntary Scho
dings and M
(ABB) compl
redwood sof
Commission
t also comme
will remain fen
ll buildings we
n August 11, 20
LE SUMMARY
T REFERENCE: 1
W:
roceeding with
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
ool
Modernizatio
leted installat
ffits of the
ning commenc
nced. Sod fo
nced off for a
re substantiall
014.
1.1 – 1.2, 1.4 –
hin budget, and
$0
$9,778,358
$0
$9,778,358
$20,316
$0
$2,098,650
$7,649,835
$9,557
$9,778,358
83.7%
$703 ,772
$435,376
3.8%
Directives vs.
on
ion of exterio
new two‐stor
ced on July 31
r the field are
a few weeks t
y complete an
– 1.10
d should be rea
or
ry
1,
ea
to
nd
ady for move‐i
Current Phase:
Schedule:
Architect Contrac
BOE Approval
Conceptual Desig
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (
BOE Approval
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates
( ) Denotes number o
in by August 5,
Constructio
ct (2)
n (2)
n (2)
(2)
ct (1)
d
pletion
cy
– Subject to Change
of Board of Educatio
Pag
, 2014.
n
April 27, 2010
May 11, 2010
December 14, 2
January 11, 201
June 14, 2011
June 28, 2011
February 27, 20
December 10, 2
December 18 2
January 15, 201
February 28, 20
March 12, 2013
March 25, 2013
July 31, 2014
August 5, 2014
on Readings
ge | 13
2010
11
012
2012
2012
13
013
3
3
*
Techno
A. PROJE
Equipm
for use
B. BUDG
C. BOND
D. PROJE
Eq
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
logy Impro
ECT STATUS
ment orders ha
e during the 20
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
quipment bein
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies & Computers
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
ovements
ave arrived and
014/15 school
LE SUMMARY
T REFERENCE: 1
W:
ng installed at e
unds
ment
y
ended
d are being de
year.
1.5 – 1.7
each campus fo
$0
$10,485,054
$0
$10,485,054
$0
$6,850,644
$539,269
$3,095,142
$0
$10,485,054
91.9%
ployed to the v
or the new sch
various campu
hool year.
Current Phase:
Schedule:
Architect Contrac
BOE Approval
Conceptual Desig
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (
BOE Approval
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates
( ) Denotes number o
uses
N/A
t (2)
n (2)
(2)
2)
t (1)
d
pletion
cy
– Subject to Change
of Board of Educatio
Pag
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
n Readings
ge | 14
Gunn H
New Clas
A. PROJE
The n
studen
have b
B. BUDG
C. BOND
D. PROJE
Th
st
oc
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
High Schoo
ssroom Buil
ECT STATUS
ew Math and
nts on August
been in use sin
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he World Lang
tudents on Feb
ccupied with st
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
l
dings A & B
d English Build
15, 2013. Wo
ce February, 2
LE SUMMARY
T REFERENCE: 3
W:
uages building
bruary 11, 2013
taff and studen
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
ding was occu
rld Language B
2013.
3.1, 3.3, 3.4
g move‐in occu
3. The Math &
nts on August
$0
$25,035,201
$0
$25,035,201
$24,948
$308,194
$3,789,909
$20,911,873
$277
$25,035,201
98.9%
$ 1,763,200
$ 126,231
9.3%
Directives vs.
upied by staff
Building classro
urred on Febru
& English buildi
15, 2013. The
f and
ooms
ary 8, 2013, an
ng move‐in oc
e project comp
Current Phase: O
Schedule:
Architect Contrac
BOE Approval
Conceptual Desig
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Authorize to Bid (
BOE Approval
Approval by DSA
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates
( ) Denotes number o
nd was occupie
ccurred on July
leted within bu
Occupancy – Augus
ct (2)
n (2)
n (2)
(2)
ct (1)
d
pletion
cy
– Subject to Change
of Board of Educatio
Pag
ed with staff an
y 15, 2013, and
udget.
st 15, 2013
March 31, 2009
April 14, 2009
September 8, 2
September 22,
January 12, 201
January 26, 201
August 4, 2010
March 8, 2011
March 22, 2011
May 27, 2011
July 13, 2011
July 22, 2011
August 24, 201
July 15, 2013
August 15, 2013
on Readings
ge | 15
nd
d was
9
2009
2009
10
10
1
1
3
Gunn H
New Gym
A. PROJE
The n
classe
tennis
compl
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
High Schoo
mnasium
ECT STATUS
ew gymnasium
s were held in
s courts surf
eted August 2
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he new gym w
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
l
m was occupi
n the new gym
facing and s
7, 2013.
LE SUMMARY
T REFERENCE: 3
W:
as occupied on
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
ed on June 7
m on August
striping was
3.4, 3.5, 3.13
n June 7, 2013
$0
$12,914,800
$0
$12,914,800
$0
$19,706
$2,461,402
$10,400,737
$32,955
$12,914,800
95.3%
$834,700
$7,909
9.9%
Directives vs.
7, 2013 and P
15, 2013. Th
installed an
.
S
A
S
S
A
A
A
S
PE
e
d
Current Phase:
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Authorize to Bid (
BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Comp
Planned Occupanc
* Anticipated Dates
( ) Denotes number o
Occupancy –
t (2)
n (2)
(2)
2)
t (1)
d
letion
cy
– Subject to Change
of Board of Educatio
Pag
– June 7, 2013
March 31, 2009
April 14, 2009
September 8, 2
September 22,
January 12, 201
January 26, 201
August 4, 2010
March 8, 2011
March 22, 2011
May 27, 2011
July 13, 2011
July 20, 2011
August 1, 2011
May 1, 2013
June 7, 2013
n Readings
ge | 16
9
009
2009
10
10
1
Gunn H
Existing G
A. PROJE
Romko
Novem
the ca
B. BUDG
C. BOND
D. PROJE
Th
N
Fund
This
budg
Chan
High Schoo
Gymnasium
ECT STATUS
on Inc. con
mber 2013. T
mpus on Nove
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project is pr
ovember 12, 2
ding and Budget
project is funded b
get. See that proje
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
l
m Moderniza
tinued punch
The modernize
ember 4, 2013.
LE SUMMARY
T REFERENCE: 3
W:
roceeding on‐s
2013.
by the New Gymn
ect budget for stat
ency
ency Balance
ngency Balance
ges
onstruction Change
tion
h list correc
d Bow gym w
.
3.4, 3.5, 3.13
schedule and w
asium project
tus.
$99,800
$99,800
0.0%
Directives vs.
ctions throug
was occupied b
within budget.
gh
by
Occupancy by
Current Phase:Cl
Schedule:
Architect Contrac
BOE Approval
Conceptual Desig
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Authorize to Bid (
BOE Approval
Approval by DSA
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates
( ) Denotes number
y the school occ
ose‐out / Occupan
ct (2)
gn (2)
n (2)
(2)
ct (1)
d
pletion
ncy
– Subject to Change
of Board of Educatio
Pag
curred on
ncy – November 1
March 31, 2009
April 14, 2009
September 8, 2
September 22,
January 12, 201
January 26, 201
August 4, 2010
February 12, 20
February 26, 20
January 23, 201
April 2, 2013
April 9, 2013
May 31, 2013
October 28, 20
November 12, 2
e
on Readings
ge | 17
12, 2013
9
2009
2009
10
10
013
013
13
13
2013
Palo Alt
Athletic S
A. PROJE
The m
surfac
been c
B. BUDG
C. BOND
D. PROJE
Th
oc
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
to High Sch
Stadium Imp
ECT STATUS
main project i
cing, new orna
completed.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he ornamental
ccupied Septem
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
hool
provements
including a co
mental fence,
LE SUMMARY
T REFERENCE: 4
W:
l fence was com
mber 10, 2012
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
s
oncessions bu
signage and e
4.13
mpleted on sch
. The bleache
$0
$5,090,000
$0
$5,090,000
$882
$2,746
$818,716
$4,267,656
$0
$5,090,000
93.3%
$310,200
$225,587
2.3%
Directives vs.
ilding, track r
entry lighting h
hedule in Augu
r replacement
re‐
has
ust 2013. The
work was com
Current Phase: C
Schedule:
Architect Contra
BOE Approval
Conceptual Desi
BOE Approval
Schematic Desig
BOE Approval
Submit to DSA
Authorize to Bid
BOE Approval
Approval by DSA
Bid Opening
Award of Contra
Notice to Procee
Substantial Com
Planned Occupa
Bleachers
Fence Completio
* Anticipated Dates –
()Denotesnumberof
concessions bu
mpleted on sch
Close‐out / Occup
act (2)
gn (2)
gn (2)
(2)
A
act (1)
ed
mpletion ‐ Concessi
ncy ‐ Concessions
on
– Subject to Change
fBoard ofEducation Rea
Pag
uilding was
hedule in June
pancy – August 1, 2
January 26, 20
February 9, 20
June 1, 2010
June 22, 2010
February 22, 2
March 8, 2011
April 4, 2011
June 28, 2011
July 19, 2011
July 26, 2011
December 1, 2
December 13,
January 4, 201
ion August 31, 20
September 10
March 31, 201
August 1, 2013
adings
ge | 18
2013.
2013
010
010
2011
1
2011
, 2011
12
012
0, 2012
13
3
Palo Alt
Haymark
A. PROJE
All Tr
windo
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
to High Sch
ket and Tow
ECT STATUS
rusty Builders
ows on August
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project com
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
hool
wer Building
completed t
9, 2013, on sch
LE SUMMARY
T REFERENCE: 4
W:
mpleted on sch
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
Improveme
the installatio
hedule and wit
4.1 ‐ 4.3
edule and with
$0
$1,500,000
$0
$1,500,000
$0
$62,844
$179,000
$1,258,159
$0
$1,500,000
84.2%
$39,200
$33,930
1.3%
Directives vs.
nts
on of the ne
thin budget.
hin budget.
ew
Current Phase: C
Schedule:
Architect Contrac
BOE Approval
Conceptual Desig
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Authorize to Bid
BOE Approval
Approval by DSA
Bid Opening
Award of Contrac
Notice to Procee
Substantial Comp
* Anticipated Dates
( ) Denotes number
Close‐out / Occupa
ct (2)
gn (2)
n (2)
(2)
ct (1)
d
pletion
s – Subject to Change
r of Board of Educatio
Pag
ancy – August 9, 2
N/A
N/A
N/A
N/A
N/A
N/A
May 25, 2012
April 24, 2012
May 6, 2012
August 24, 201
January 17, 20
January 29, 20
February 21, 2
August 9, 2013
e
on Readings
ge | 19
2013
12
13
13
013
3
Jordan
A. PROJE
Studen
start o
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
Middle Sc
ECT STATUS
nts occupied a
of school in fall
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project is co
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
hool
all new and m
l 2013.
LE SUMMARY
T REFERENCE: 2
W:
ompleted on sc
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
modernized bu
2.1 – 2.3, 2.6 –
chedule and w
$0
$19,891,564
$0
$19,891,564
$6,111
$86,265
$3,723,370
$16,007,031
$68,787
$19,891,564
90.4%
$1,398,700
$847,769
4.0%
Directives vs.
ildings for the
– 2.8, 2.10 – 2.1
within budget.
C
S
A
B
C
B
S
B
S
A
B
A
B
A
N
S
P
*
(
e
12, 6.3 – 6.5
Current Phase: Clo
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Authorize to Bid (2
BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Compl
Planned Occupanc
* Anticipated Dates –
( ) Denotes number of
ose‐out / Occupan
t (2)
n (2)
(2)
2)
t (1)
etion
cy
– Subject to Change
of Board of Education
Pag
ncy – August 15, 2
October 28, 200
October 30, 200
June 23, 2009
September 8, 20
March 23, 2010
April 27, 2010
December 21, 2
June 28, 2011
July 19, 2011
October 5, 2011
December 8, 20
December 13, 2
December 27, 2
August 1, 2013
August 15, 2013
n Readings
ge | 20
013
08
08
009
010
1
11
011
011
3
J.L. Stan
A. PROJE
Studen
start o
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
nford Midd
ECT STATUS
nts occupied
of school in fall
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project com
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
dle School
all new and m
l 2013.
LE SUMMARY
T REFERENCE: 2
W:
mpleted on sch
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
modernized b
2.1 – 2.3, 2.5 –
edule and with
$0
$17,184,699
$0
$17,184,699
$8,879
$144,790
$3,545,843
$13,485,187
$0
$17,184,699
89.5%
$1,057,800
$902,445
2.8%
Directives vs.
uildings for th
– 2.8, 2.11 – 2.1
hin budget. Clo
C
S
A
B
C
B
S
B
B
S
A
B
A
B
A
N
S
P
*
(
he
12, 6.4, 6.5
ose‐out in prog
Current Phase: Cl
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design
BOE Approval
BOE Approval (Site
Submit to DSA
Authorize to Bid (2
BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Compl
Planned Occupanc
* Anticipated Dates – Subj
( ) Denotes number of Boa
gress.
ose‐out / Occupan
t (2)
n (2)
(3)
ework)
2)
t (1)
d
letion
cy
ject to Change
ard of Education Readings
Pag
ncy – August 15, 2
October 28, 200
October 30, 200
June 23, 2009
September 8, 20
June 1, 2010
June 22, 2010
September 28, 2
May 6, 2011
November 29, 2
December 13, 2
January 24, 201
May 3, 2012
May 8, 2012
May 30, 2012
August 7, 2013
August 15, 2013
ge | 21
2013
08
08
009
2010
2011
2011
12
3
J.L. Stan
Landscap
A. PROJE
B. BUDG
C. BOND
D. PROJE
Th
Fund
This p
proje
Perce
Chan
nford Midd
pe and Site I
ECT STATUS
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project com
ding and Budget
project is funded b
ect budget. See th
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
dle School
Improvemen
LE SUMMARY
T REFERENCE: 2
W:
mpleted on sch
by the J.L. Stanford
hat project budget
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
nts
2.1 – 2.3, 2.5 –
edule and with
d Middle School
for status.
89.5%
$1,057,800
$902,445
2.8%
Directives vs.
– 2.8, 2.11 – 2.1
hin budget.
C
S
A
C
S
S
A
A
A
S
C
(
12, 6.4, 6.5
Current Phase: Cl
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design
BOE Approval
BOE Approval (Sit
Submit to DSA
Authorize to Bid (2
BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Comp
Completion
* Anticipated Dates – Subj
( ) Denotes number of Boa
ose‐out / Occupan
t (2)
n (2)
(3)
ework)
2)
t (1)
d
letion
ject to Change
ard of Education Readings
Pag
ncy – August 16, 2
October 28, 200
October 30, 200
June 23, 2009
September 8, 20
June 1, 2010
June 22, 2010
September 28, 2
May 6, 2011
November 29, 2
December 13, 2
January 24, 201
May 3, 2013
May 8, 2013
May 23, 2013
August 16, 2013
August 16, 2013
ge | 22
2013
08
08
009
2010
2011
2011
12
3
3
Terman
A. PROJE
Studen
mode
cafeto
B. BUDG
C. BOND
D. PROJE
Th
15
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
n Middle Sc
ECT STATUS
nts occupied
rnized building
orium moderni
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project com
5, 2013. The p
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
chool
d the new
gs for the star
zation was com
LE SUMMARY
T REFERENCE: 2
W:
mpleted on sch
project is curre
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
instructional
rt of school in
mpleted in Oct
2.1 – 2.8, 2.11
edule, with ex
ntly within bud
$0
$13,312,971
$0
$13,312,971
$4,153
$75,747
$2,720,590
$10,507,733
$4,748
$13,312,971
96.7%
$929,900
$12,909
9.4%
Directives vs.
spaces an
fall 2013. Th
tober 2013.
– 2.12
ception of the
dget.
nd
he
Cafetorium, w
Current Phase: C
Schedule:
Architect Contrac
BOE Approval
Conceptual Desig
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Authorize to Bid
BOE Approval
Approval by DSA
Bid Opening
Award of Contrac
Notice to Procee
Substantial Comp
Planned Occupan
* Anticipated Dates
( ) Denotes number
which was occu
Close‐out / Occupa
ct (2)
gn (2)
n (2)
(2)
ct (1)
d
pletion
ncy
s – Subject to Change
r of Board of Educatio
Pag
upied on Novem
ancy – November
October 28, 20
October 30, 20
June 23, 2009
September 8, 2
May 11, 2010
May 25, 2010
December 21,
June 28, 2011
July 19, 2011
September 1, 2
December 6, 2
December 13,
December 27,
October 31, 20
November 15,
e
on Readings
ge | 23
mber
15, 2013
008
008
2009
2010
2011
011
2011
2011
013
2013
Fairmea
New Clas
A. PROJE
Studen
start o
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
adow Elem
ssroom Buil
ECT STATUS
nts occupied a
of school in fall
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project com
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
mentary Sc
ding and Mo
all new and m
l 2013.
LE SUMMARY
T REFERENCE: 1
W:
mpleted on sch
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
chool
odernization
modernized bu
1.1 – 1.2, 1.4 –
edule and with
$0
$7,796,550
$0
$7,796,550
$32,381
$98,962
$1,992,928
$5,671,159
$1,120
$7,796,550
94.2%
$642 ,300
$186,122
7.1%
Directives vs.
n
uildings for the
– 1.10
hin budget.
C
Sc
A
B
C
B
Sc
B
S
A
B
A
B
A
N
S
P
*
( )
e
Current Phase:Clos
chedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
chematic Design (
BOE Approval
ubmit to DSA
Authorize to Bid (2
BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
ubstantial Comple
Planned Occupancy
Anticipated Dates –
) Denotes number of
se‐out / Occupanc
(2)
(2)
(2)
)
(1)
etion
y
– Subject to Change
f Board of Education
Pag
cy – August 15, 20
October 13, 2009
October 27, 2009
March 23, 2010
April 6, 2010
September 14, 2
September 28, 2
April 18, 2011
October 11, 2011
October 25, 2011
November 14, 20
December 5, 201
December 13, 20
January 3, 2012
August 5, 2013
August 15, 2013
Readings
ge | 24
013
9
9
010
010
1
1
011
11
011
Ohlone
New Clas
A. PROJE
Move‐
occurr
buildin
B. BUDG
C. BOND
D. PROJE
O
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
Elementa
ssroom Buil
ECT STATUS
‐in to the new
red in Decemb
ng on January
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
ccupancy occu
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
ary School
ding and Mo
w building and
ber 2011. Stu
3, 2012.
LE SUMMARY
T REFERENCE: 1
W:
urred on Janua
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
odernization
other existing
udents occupie
1.1 – 1.2, 1.4 –
ry 3, 2012. Pro
$0
$10,597,870
$0
$10,597,870
$7,461
$49,049
$2,180,418
$8,360,942
$62,598
$10,597,870
98.9%
$748,400
$459,113
3.9%
Directives vs.
n
classrooms
ed the new
– 1.10
oject complete
C
S
A
B
C
B
S
B
S
A
B
A
B
A
N
S
P
*
(
ed on schedule
Current Phase:
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Authorize to Bid (2
BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Compl
Planned Occupanc
* Anticipated Dates –
( ) Denotes number o
e and within bu
Occupancy –
t (2)
n (2)
(2)
2)
t (1)
d
letion
cy
– Subject to Change
of Board of Education
Pag
udget.
– January 3, 2012
September 30, 2
October 14, 200
March 3, 2009
March 17, 2009
June 2, 2009
June 23, 2009
November 24, 2
April 27, 2010
May 11, 2010
May 18, 2010
July 13, 2010
August 3, 2010
August 19, 2010
November 18, 2
January 3, 2012
n Readings
ge | 25
2008
08
9
2009
0
2011
2
Site Acq
525 San A
A. PROJE
This si
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
quisition
Antonio Rd
ECT STATUS
te has been le
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he site has bee
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
ased to Athena
LE SUMMARY
T REFERENCE: 1
W:
en leased to At
unds
ment
y
ended
a Academy.
1.1 – 1.2, 1.4 –
thena Academy
$0
$8,500,000
$0
$8,500,000
$0
$0
$8,500,000
$0
$0
$8,500,000
100.0%
– 1.10
y.
Current Phase:
Schedule:
Architect Contrac
BOE Approval
Conceptual Desig
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (
BOE Approval
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates
( ) Denotes number o
N/A
t (2)
n (2)
(2)
2)
t (1)
d
pletion
cy
– Subject to Change
of Board of Educatio
Pag
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
n Readings
ge | 26
Jordan
A. PROJE
The po
B. BUDG
C. BOND
D. PROJE
Th
M
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
*Bud
Middle Sc
ECT STATUS
ortables were
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
his project com
Move in occurre
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
dget previously exp
hools ‐ Int
installed and m
LE SUMMARY
T REFERENCE: 2
W:
mpleted ahead
ed on Septemb
unds
ment
y
ended
pended
erim Class
moved into for
2.1, 6.4, 6.5
of schedule an
ber 30, 2011.
$0
$392,120
$208,222
$600,342
$0
$0
$180,286
$419,292
$764
$600,342
76.8%*
srooms
fall 2011. DSA
nd under budg
A closeout rece
get.
Current Phase:
Schedule:
Approval by DSA
Authorize to Bid (
BOE Approval
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Occupancy
* Anticipated Dates
( ) Denotes number o
eived Novemb
Move‐in
2)
t (1)
d
pletion
– Subject to Change
of Board of Educatio
Pag
er 19, 2012.
June 16, 2011
June 14, 2011
June 28, 2011
July 14, 2011
July 20, 2011
July 27, 2011
September 20,
September 30,
n Readings
ge | 27
2011
2011
Gunn H
Air Cond
A. PROJE
Best C
condit
B. BUDG
C. BOND
D. PROJE
Pr
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
High Schoo
itioning of E
ECT STATUS
Contracting Se
tioning units an
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
roject has been
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
l
Existing Buil
ervices Inc. co
nd cool roof co
LE SUMMARY
T REFERENCE: 3
W:
n closed‐out.
unds
ment
y
ended
dings
ompleted the
oating in the su
3.7
$0
$2,600,000
$0
$2,600,000
$1,919
$0
$454,610
$2,120,580
$22,891
$2,600,000
80.9%
installation o
ummer 2011.
C
S
A
B
C
B
S
B
S
A
A
B
B
A
N
S
*
(
of air
Current Phase:
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (2
BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
Substantial Compl
* Anticipated Dates –
( ) Denotes number o
Completed
t (2)
n (2)
(2)
2)
t (1)
etion
– Subject to Change
of Board of Education
Pag
March 27, 2010
April 6, 2010
N/A
N/A
N/A
N/A
October 20, 201
February 10, 20
February 22, 20
March 8, 2011
March 28, 2011
April 8, 2011
April 11, 2011
August 8, 2011
n Readings
ge | 28
10
11
11
J.L. Stan
A. PROJE
Coulte
reloca
B. BUDG
C. BOND
D. PROJE
Pr
This
JLS p
nford Midd
ECT STATUS
er Constructio
ted portables
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
roject complet
portable reloca
project. Refer to
dle School
on completed
in August 2011
LE SUMMARY
T REFERENCE: 2
W:
ted on schedul
ation project fun
o pg. 14
‐ Interim
the work o
1.
2.1, 6.4, 6.5
e and is curren
nded by main
Classroom
on the
ntly in close‐ou
ms
ut.
Current Phase:
Schedule:
Approval by DSA
Jordan Project
Authorize to Bid (
BOE Approval
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates
( ) Denotes number
Occupancy
(2)
ct (1)
d
pletion
ncy
s – Subject to Change
of Board of Educatio
Pag
‐ August 11, 2011
April 19, 2011
June 16, 2011
May 10, 2011
May 24, 2011
June 1, 2011
June 13, 2011
June 20, 2011
August 8, 2011
August 15, 201
e
on Readings
ge | 29
1
Fairmea
Portable
A. PROJE
Reloca
B. BUDG
C. BOND
D. PROJE
Pr
This
JLS p
adow Elem
Relocation
ECT STATUS
ation of the po
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
roject complet
portable reloca
project. Refer to
mentary Sc
Project
ortable was com
LE SUMMARY
T REFERENCE: 6
W:
ted ahead of sc
ation project fun
o pg. 14
chool
mplete and occ
6.4
chedule on Aug
nded by main
cupied on Aug
gust 8, 2011.
ust 8, 2011.
Current Phase:
Schedule:
Architect Contrac
BOE Approval
Conceptual Desig
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (
BOE Approval
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates
( ) Denotes number
Occupancy
ct (2)
gn (2)
n (2)
(2)
ct (1)
d
pletion
ncy
– Subject to Change
of Board of Educatio
Pag
‐ August 8, 2011
February 15, 20
N/A
N/A
N/A
N/A
N/A
March 3, 2011
March 3, 2011
May 11, 2011
May 24, 2011
June 14, 2011
June 14, 2011
June 20, 2011
August 1, 2011
August 8, 2011
e
on Readings
ge | 30
011
Elemen
Interacti
Installati
A. PROJE
Install
system
classro
B. BUDG
C. BOND
D. PROJE
A
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
ntary Classr
ve Whitebo
ion
ECT STATUS
ation of Smar
ms were com
ooms and libra
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
ll SmartBoards
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
room Impr
ards and So
rtBoards and L
mpleted for a
aries in April 20
LE SUMMARY
T REFERENCE: 1
W:
s and Lightspee
unds
ment
y
ended
rovements
ound Assist S
Lightspeed sou
all elementar
011.
1.5 – 1.7
ed sound syste
$0
$2,004,889
$0
$2,004,889
$0
$0
$275,488
$1,729,401
$0
$2,004,889
93.9%
s
System
und assist
ry school
ems installed.
C
S
A
C
S
S
A
A
A
C
(
Current Phase: Co
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (2
BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
Completion
* Anticipated Dates – Su
( ) Denotes number of B
omplete ‐ May 15,
t (2)
n (2)
(2)
2)
t (1)
d
ubject to Change
Board of Education Readi
Pag
, 2011
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
November 9, 20
November 23, 2
February 25, 20
March 8, 2011
March 9, 2011
May 15, 2011
ings
ge | 31
010
2010
011
Palo Alt
Multi‐Us
A. PROJE
The fie
chang
B. BUDG
C. BOND
D. PROJE
Fi
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
to High Sch
se Field
ECT STATUS
elds were avai
e order negoti
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
eld was open f
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
hool
lable for play o
ations comple
LE SUMMARY
T REFERENCE: 4
W:
for use on Feb
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
on February 1,
ted on March
4.14
ruary 1, 2011.
$0
$2,609,680
$1,007,255
$3,616,935
$0
$1,506
$698,293
$2,916,682
$454
$3,616,935
100.0%
$269,300
$230,579
1.5%
Directives vs.
2011, and fina
9, 2011.
al
Current Phase:
Schedule:
Architect Contra
BOE Approval
Conceptual Desig
BOE Approval
Schematic Desig
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid
BOE Approval
Bid Opening
Award of Contra
Notice to Procee
Substantial Com
Planned Occupa
* Anticipated Dates
( ) Denotes number
Occupancy
ct (2)
gn (2)
n (2)
A
(2)
act (1)
ed
pletion
ncy
s – Subject to Chang
r of Board of Educati
Pag
y – February 1, 201
September 30
October 14, 20
N/A
N/A
November 18,
December 09,
March 19, 200
September 30
February 24, 2
March 17, 200
March 16, 201
April 7, 2010
June 1, 2010
January 31, 20
February 1, 20
e
ion Readings
ge | 32
11
, 2008
008
, 2008
2008
09
, 2009
2009
09
10
011
011
Gunn H
Industria
A. PROJE
This fa
receiv
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
High Schoo
al Arts Addit
ECT STATUS
acility was ava
ed on July 18,
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he building occ
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
l
tion and Ren
ailable for ins
2011.
LE SUMMARY
T REFERENCE: 3
W:
cupied as sche
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
novation
truction in Jan
3.1, 3.7, 3.11
duled, and the
$0
$5,082,402
$0
$5,082,402
$1,061
$88,985
$1,002,057
$3,990,300
$0
$5,082,402
99.3%
$349,000
$141,967
41.6%
Directives vs.
nuary 2010. D
e project comp
C
Sc
A
B
C
B
Sc
B
Su
A
A
B
B
A
N
Su
P
*
( )
DSA closeout
pleted within b
urrent Phase:
chedule:
Architect Contract
OE Approval
onceptual Design
OE Approval
chematic Design (
OE Approval
ubmit to DSA
Approval by DSA
Authorize to Bid (2
OE Approval
id Opening
Award of Contract
Notice to Proceed
ubstantial Comple
lanned Occupancy
Anticipated Dates –
) Denotes number of
udget.
Occupancy –
(2)
(2)
2)
)
(1)
etion
y
Subject to Change
f Board of Education
Pag
January 4, 2010
N/A
N/A
N/A
N/A
N/A
N/A
June 17, 2008
December 24, 20
October 14, 2008
October 28, 2008
December 16, 20
December 24, 20
January 6, 2009
November 25, 20
January 4, 2010
Readings
ge | 33
008
8
8
008
008
009
Gunn H
Aquatic C
A. PROJE
This fa
out wi
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
High Schoo
Center
ECT STATUS
acility was ava
ith DSA.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
his project com
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
l
ailable for use
LE SUMMARY
T REFERENCE: 3
W:
mpleted within
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
in July 2009, a
3.12
budget.
$0
$4,865,423
$0
$4,865,423
$0
$0
$647,169
$4,218,253
$0
$4,865,423
99.9%
$389,887
$195,148
49.9%
Directives vs.
and has been
C
Sc
A
B
C
B
Sc
B
S
A
A
B
B
A
N
S
P
*
( )
closed
Current Phase:
chedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
chematic Design (
BOE Approval
ubmit to DSA
Approval by DSA
Authorize to Bid (2
BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
ubstantial Comple
Planned Occupancy
Anticipated Dates –
) Denotes number of
Occupancy –
(2)
(2)
(2)
)
(1)
etion
y
– Subject to Change
f Board of Education
Pag
June 15, 2009
N/A
N/A
N/A
N/A
N/A
N/A
December 11, 20
April 24, 2008
April 8, 2008
April 22, 2008
May 28, 2008
June 4, 2008
December 6, 200
June 15, 2009
June 15, 2009
Readings
ge | 34
007
08
Middle
Jordan, J
A. PROJE
AEDIS
Board
progra
projec
transf
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
School Pre
J.L. Stanford
ECT STATUS
presented rec
of Education
am document
cts for pre‐de
erred to the pr
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
his project has
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
e‐Design
d and Terma
commended co
for approval o
s for the new
sign work hav
rogram conting
LE SUMMARY
T REFERENCE: 2
W:
been complet
unds
ment
y
ended
n
oncept plans fo
on September
w projects at
ve been close
gency on June
2.1 – 2.12
ted. Board app
$0
$56,488
$0
$56,488
$0
$0
$56,488
$0
$0
$56,488
96.8%
or each campu
r 8, which bec
each campus.
ed, and funds
14, 2011.
proval received
C
S
A
B
C
B
S
B
S
A
A
B
B
A
N
S
P
*
(
us to the
ame the
. These
s will be
d on Septembe
Current Phase:
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design (
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (2
BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
Substantial Comple
Planned Occupanc
* Anticipated Dates –
) Denotes number of
er 8, 2009.
Complete
(2)
(2)
(2)
2)
(1)
etion
y
– Subject to Change
f Board of Education
Pag
October 28, 200
October 30, 200
June 23, 2009
September 8, 20
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
n Readings
ge | 35
8
8
009
Garland
Campus
A. PROJE
The Bo
hold u
The b
June 2
at the
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
d Elementa
Modernizat
ECT STATUS
oard of Educat
until a growth
oard voted to
2011. Discussio
elementary sc
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
his project has
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
ary School
tion
tion has put n
plan is establis
terminate the
ons with the B
chools are ongo
LE SUMMARY
T REFERENCE: 1
W:
been placed o
unds
ment
y
ended
ew developme
shed for the el
e lease with S
Board on future
oing.
1.1, 1.4 – 1.10
on hold.
$0
$22,178,544
$0
$22,178,544
$0
$0
$3,915,789
$17,400,000
$862,755
$22,178,544
1.3%
ent for Garland
ementary scho
Stratford Schoo
e plans for gro
C
S
A
B
C
B
S
B
S
A
A
B
B
A
N
S
P
*
(
d on
ools.
ol in
owth
Current Phase:
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (2
BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
Substantial Compl
Planned Occupanc
* Anticipated Dates –
( ) Denotes number o
On Hold
t (2)
n (2)
(2)
2)
t (1)
d
letion
cy
– Subject to Change
of Board of Education
Pag
October 28, 200
October 30, 200
February 10, 20
February 24, 20
June 2, 2009
June 23, 2009
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
n Readings
ge | 36
08
08
009
009
High Sc
Palo Alto
A. PROJE
The Bo
for bo
closed
reserv
B. BUDG
C. BOND
D. PROJE
M
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
hool Mast
o HS and Gu
ECT STATUS
oard of Educa
oth high scho
d, with funds t
ve funds.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
Master planning
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
ter Plan
nn HS
tion (BOE) app
ools, and the
transferred to
LE SUMMARY
T REFERENCE: 3
W:
g effort comple
unds
ment
y
ended
proved the ma
se projects h
o the respectiv
3.1 – 3.14, 4.1
ete.
$0
$285,387
$0
$285,387
$0
$0
$285,387
$0
$0
$285,387
86.2%
aster plans
have been
ve campus
– 4.14
C
S
A
G
G
G
(
Current Phase:
Schedule:
Architect Contract
BOE Approval
Initial Master Plan
BOE Approval
Paly CEQA Approv
BOE Approval
Gunn Master Plan
BOE Approval
Gunn CEQA Appro
BOE Approval
Master Plan Revis
Paly MP Revision A
Gunn MP Revision
* Anticipated Dates –
( ) Denotes number o
Complete
t (2)
n Approval (2)
val (2)
n Update (2)
oval (2)
sion Approval (2)
Approval (2)
n Approval (2)
– Subject to Change
of Board of Education
Pag
March 31, 2009
April 14, 2009
September 8, 20
September 22, 2
February 9, 201
February 23, 20
March 23, 2010
April 6, 2010
April 27, 2010
May 11, 2010
September 14, 2
October 9, 2010
October 12, 201
n Readings
ge | 37
9
009
2009
10
010
0
2010
0
10
Hoover
Pre‐Desig
A. PROJE
This p
eleme
B. BUDG
C. BOND
D. PROJE
Pr
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Elementa
gn
ECT STATUS
roject has bee
entary schools.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
roject is curren
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
ary School
n put on hold
LE SUMMARY
T REFERENCE: 1
W:
ntly on hold.
unds
ment
y
ended
until a growth
1.1 – 1.2, 1.4 –
$0
$70,550
$0
$70,550
$0
$0
$70,550
$60
$0
$70,550
81.0%
h plan is establ
– 1.10
C
S
A
B
C
S
B
S
A
A
B
B
A
N
S
P
*
(
ished for the
Current Phase:
Schedule:
Architect Contract
BOE Approval
Conceptual Design
Schematic Design
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (2
BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
Substantial Compl
Planned Occupanc
* Anticipated Dates –
( ) Denotes number o
On Hold
t (2)
n (2)
(2)
2)
t (1)
d
letion
cy
– Subject to Change
of Board of Education
Pag
April 27, 2010
May 11, 2010
November 9, 20
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
n Readings
ge | 38
010
Elemen
A. PROJE
DSA co
that i
coveri
classro
schoo
pendin
growt
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
ntary Classr
ECT STATUS
omments were
nclude new li
ngs, ventilatio
ooms at Barr
ls. The author
ng further disc
h planning.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
his project has
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
room Impr
e returned to G
ghting, adding
on, and replac
ron Park and
rization to bid
cussions with th
LE SUMMARY
T REFERENCE: 1
W:
been placed o
unds
ment
y
ended
rovements
Gelfand for Ph
g operable wi
ement of ceili
El Carmelo
has been plac
he BOE about
1.5 – 1.7
on hold.
$0
$2,004,889
$0
$2,004,889
$0
$0
$275,488
$1,729,401
$0
$2,004,889
93.9%
s
hase 1 plans
ndows and
ing tiles for
elementary
ced on hold
elementary
C
S
A
C
S
S
A
A
A
S
(
Phase 1 Schools:
Current Phase: O
Schedule:
Architect Contract
BOE Approval
Conceptual Design
BOE Approval
Schematic Design
BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (2
BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
Substantial Comp
Planned Occupanc
* Anticipated Dates – Su
( ) Denotes number of B
Barron Park and E
n Hold
t (2)
n (2)
(2)
2)
t (1)
d
letion
cy
ubject to Change
Board of Education Readi
Pag
El Carmelo
June 8, 2010
June 22, 2010
N/A
N/A
November 9, 20
December 7, 20
December 23, 2
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
ings
ge | 39
010
010
2010
OHS WEST:260388860.1 A-1
EXHIBIT A
PALO ALTO UNIFIED SCHOOL DISTRICT
BOND PROJECT LIST
[Note: The order in which projects are listed is not an indication of priority for funding or completion. Not all listed
projects will be completed at every site.]
1. ELEMENTARY SCHOOL PROJECTS
Addison Barron Park Briones Duveneck El Carmelo
Escondido Fairmeadow Garland Greendell Hays
Hoover Nixon Ohlone Palo Verde
1. Construct new permanent classrooms and classroom buildings to accommodate enrollment
growth and expanded programs.
2. Replace temporary classrooms with permanent classrooms.
3. Acquire and install modular classrooms, as needed.
4. Expand libraries to accommodate enrollment growth.
5. Improve or provide new security systems, including alarms, lighting, locks, monitoring
systems, fencing, etc.
6. Upgrade climate control systems, including passive technologies to conserve energy, such as
shade canopies, energy-efficient windows, window coverings and shade control;
install/replace heating, ventilation and air conditioning.
7. Install/improve local area network (LAN) and wide area network (WAN) infrastructure to
accommodate technology upgrades; install/upgrade communications systems.
8. Building exterior and building shell renovation, including seismic structural upgrades and
Americans with Disability Act (ADA) improvements to bring all buildings to current code;
roofs; repainting and/or resurfacing.
9. Classroom and other school facilities modernization and building interior improvements,
including infrastructure and major building system upgrades.
10. Modernization/replacement of administration/multipurpose/library space.
Numbers Added
A-2
OHS WEST:260388860.1
2. MIDDLE SCHOOL PROJECTS
David Starr Jordan Jane Lathrop Stanford Terman
1. Construct new permanent classrooms and classroom buildings to accommodate enrollment
growth and expanded programs.
2. Classroom and other school facilities modernization and building interior improvements,
including infrastructure and major building system upgrades.
3. Construct extra school-wide storage space.
4. Expand classrooms and classroom wings, library and administration spaces.
5. Improve or provide new security systems, including alarms, lighting, locks, monitoring
systems, fencing, etc.
6. Upgrade climate control systems, including passive technologies to conserve energy, such as
shade canopies, energy-efficient windows, window coverings and shade control;
install/replace heating, ventilation and air conditioning.
7. Install/improve local area network (LAN) and wide area network (WAN) infrastructure to
accommodate technology upgrades; install/upgrade communications systems.
8. Renovate gymnasium, including new gym floors, doors, windows, bleachers and athletic
equipment; upgrade building infrastructure, including power and water distribution.
9. Renovate swimming pool and pool deck; new filtration system; new storage and restrooms;
upgrade pool equipment.
10. Replace and/or improve play fields, including drainage and irrigation, install water meters;
replace landscaping; re-surface and re-stripe hardcourts and replace outdoor athletic
equipment.
11. Repair/Replace and/or improve concrete walkways and asphalt; canopies; parking lot and
driveways.
12. Building exterior and building shell renovation, including seismic structural upgrades and
Americans with Disability Act (ADA) improvements to bring all buildings to current code;
roofs; repainting and/or resurfacing.
A-3
OHS WEST:260388860.1
3. GUNN HIGH SCHOOL PROJECTS
1. Construct new permanent classrooms and classroom buildings to accommodate enrollment
growth and expanded programs.
2. Demolish old library building.
3. Replace temporary classrooms with permanent classrooms.
4. Construct additional restrooms.
5. Construct second gymnasium.
6. Construct new soccer field.
7. Upgrade climate control systems, including passive technologies to conserve energy, such as
shade canopies, energy-efficient windows, window coverings and shade control;
install/replace heating, ventilation and air conditioning.
8. Install/improve local area network (LAN) and wide area network (WAN) infrastructure to
accommodate technology upgrades; install/upgrade communications systems.
9. Building exterior and building shell renovation, including seismic structural upgrades and
Americans with Disability Act (ADA) improvements to bring all buildings to current code;
roofs; repainting and/or resurfacing.
10. Improve or provide new security systems, including alarms, lighting, locks, monitoring
systems, fencing, etc.
11. Classroom and other school facilities modernization and building interior improvements,
including infrastructure and major building system upgrades.
12. Replace swimming pool with new 35-meter pool, pool equipment and support structures,
pool decking, bleachers, storage, restrooms, showers, associated equipment.
13. Renovate gymnasium; interior renovation including gymnasium floors and bleachers; replace
athletic equipment.
14. Modernize football stadium, including new bathrooms and concession stands.
A-4
OHS WEST:260388860.1
4. PALO ALTO HIGH SCHOOL PROJECTS
1. Construct new permanent classrooms and classroom buildings to accommodate enrollment
growth and expanded programs.
2. Replace temporary classrooms with permanent classrooms.
3. Construct additional restrooms.
4. Upgrade climate control systems, including passive technologies to conserve energy, such as
shade canopies, energy-efficient windows, window coverings and shade control;
install/replace heating, ventilation and air conditioning.
5. Install/improve local area network (LAN) and wide area network (WAN) infrastructure to
accommodate technology upgrades; install/upgrade communications systems.
6. Building exterior and building shell renovation, including seismic structural upgrades and
Americans with Disability Act (ADA) improvements to bring all buildings to current code;
roofs; repainting and/or resurfacing.
7. Classroom and other school facilities modernization and building interior improvements,
including infrastructure and major building system upgrades.
8. Library modernization and building interior improvements, including infrastructure and
major building system upgrades.
9. Renovation or replacement of the Tower Building to accommodate administration,
classroom and program support space.
10. Renovate Main Gymnasium and second gymnasium, including seismic upgrades; accessibility
improvements; construction of new restrooms; install new roofing; replace doors and
windows; replace gymnasium floors and athletic equipment, bleachers and renovation of
interior. Renovation or replacement of weight training facility.
11. Construct new theater building.
12. Renovate and improve soccer field, including new retaining wall and bleachers; new fencing
and storage.
13. Modernize football stadium, including replace bleachers; new bathrooms and concession
stands.
14. Replace and/or improve play fields, including drainage and irrigation, install water meters;
replace landscaping; re-surface and re-stripe hardcourts and replace outdoor athletic
equipment.
A-5
OHS WEST:260388860.1
5. OTHER DISTRICT-WIDE PROJECTS
Furnishing and equipping of existing and newly constructed, modernized or rehabilitated classrooms
and facilities on an ongoing basis, including to replace worn, broken, or out-of-date furniture and
equipment for all classrooms, athletic facilities and other facilities, as needed.
1. Replace existing or acquire new computers, technology and related equipment on an ongoing
basis.
2. Establish a planned maintenance fund to address maintenance work expected to be needed to
all District facilities on an ongoing basis (other than as may be necessary for current
maintenance, operation or repairs), in order to implement the District’s comprehensive facilities
maintenance plan.
3. Acquisition of any of the facilities on the Bond Project List through temporary lease or lease-
purchase arrangements, or execute purchase option under a lease for any of these authorized
facilities.
4. If and as opportunities become available, and to the extent the Board of Education determines
that bond funds are available for the purpose, acquisition of land and other interests in real
property for future school buildings and other District facilities, and construction of such
facilities, and rehabilitation/renovation of District-owned buildings and sites not otherwise
listed.
5. Repair, upgrade, modify, expand, refinish, replace and construct site improvements, including
off-street parking areas, pickup/dropoff, signage, paths, sidewalks and walkways, canopies, hard
courts (student play areas), athletic play fields, landscaping, irrigation, permanent athletic field
equipment and facilities (including nets, basketball standards, goals and goalposts, backstops),
field lighting, etc.
6. ADDITIONAL NECESSARY AND INCIDENTAL PROJECTS
1. Remove, dispose of, and otherwise remediate hazardous materials, including asbestos, lead,
etc., where necessary.
2. Address unforeseen conditions revealed by construction/modernization (including plumbing
or gas line breaks, dry rot, seismic, structural, etc.).
3. Other improvements required to comply with existing building codes, including the Field Act,
and access requirements of the Americans with Disabilities Act (ADA).
4. Site preparation/restoration in connection with new construction, renovation or remodeling,
or installation or removal of relocatable classrooms, including ingress and egress, demolition
of existing structures, removing, replacing, or installing irrigation and drainage, utility lines
(such as gas lines, water lines, electrical lines, sewer lines, and communication lines), trees and
landscaping, relocating fire access roads, traffic lights and mitigation, and acquiring any
necessary easements, licenses, or rights of way to the property.
5. Rental or construction of storage facilities and other space on an interim basis, as needed to
accommodate construction materials, equipment, and personnel, and interim classrooms
(including relocatables) for students and school functions or other storage for classroom
materials displaced during construction.
A-6
OHS WEST:260388860.1
7. RENOVATION/MODERNIZATION (DEFINED)
For purposes of the Bond Project List, renovation and modernization projects are intended to
restore the building systems and infrastructure, weather protections, finishes, and technology, or
reallocate and reorganize space, to a condition that will provide a sustainable, functional educational
and administrative environment for future years, comparable to new construction.
Renovation projects may include, but are not limited to nor necessarily encompass, all of the
following, depending upon the age, condition and needs of each particular school facility:
1. upgrade electrical, communication, fire alarm, and similar building systems as well as main
power service and distribution, which may include active and passive solar power and
heating system acquisition, installation and construction
2. Replace, repair or upgrade plumbing, piping and drainage systems, including water supply,
meters, water heating, and wastewater systems, plumbing fixtures and sinks, etc., within
buildings and sites and to connect with city supply and drainage systems
3. Replace or modify aging heating, ventilation and air cooling systems with energy-efficient
heating and air cooling systems (HVAC), including installing energy management systems
(EMS);
4. Replace, modify, upgrade interior lighting and exterior safety/security lighting systems and
fixtures, as necessary;
5. Repair, modify and construct structural elements of the existing structure as necessary;
6. Replace or repair aging roofs with similar materials or District standard materials;
7. Replace, repair, install and construct, as necessary, interior walls, floor and ceiling finishes,
doors, door locks, windows, cabinets and casework, and equipment attached to wall surfaces
(including white boards, marker boards, tack boards, television mounts, scoreboards, fire
extinguishers, kitchen cabinets/equipment, etc.);
8. Upgrade, modify and construct restroom facilities;
9. Comply, as necessary, with Americans with Disabilities Act (ADA) and Title 24
requirements;
10. Refinish the exterior finishes of the school (including stucco, wood and metal trims, wood
siding, paint, etc.); replace doors and windows
11. Modify, expand, separate, convert and construct school support areas; staff work and lunch
areas; and educational areas to provide adequate, functional environments;
12. Modify, replace and construct functional components of altered or replaced building
components (including rainwater leaders, fascias, mansards, etc.);
For any project involving renovation, modernization, remodeling or rehabilitation of a
building or the major portion of a building, the District may proceed with new replacement
construction instead (including any necessary demolition), if the Board of Education
determines that replacement and new construction is more practical than rehabilitation and
renovation, considering the building’s age, condition, expected remaining life, comparative
cost, and other relevant factors.