Loading...
Planning & Design Meetings 11/2/2011 - PresentationP A L O A L T O H I G H S C H O O L P l Al U ifi d S h l Di iPalo Alto Unified School DistrictFacility Site Committee2 November 2011PERFORMING ARTS CENTERPERFORMING ARTS CENTER Schematic Design:Program Elements:Program Elements:Program remains•Lobby with restrooms, tickets, concession and gallery/display areaidfbd h h l dh•Stage sized for band, orchestra, choral, and theater•Full fly loft•Orchestra pit and trap room•Control room and tech equipment support rooms•Green Rooms with adjacent toilet and dressing rooms•Scene, prop and costume storage, front of house storage,p p g, g•Performing Arts Classroom•Performing Arts Center officeTotalArea: approx 26 000 SFTotal Area: approx 26,000 SFPaloAlto High SchoolPalo Alto High SchoolD e e m s L e w i s M c K i n l e y First Floor Plan Upper Side Box Plan2 November 2011Palo Alto High SchoolD e e m s L e w i s M c K i n l e yRevised Floor Plan - Single Story with Basement East-West SectionPalo Alto High SchoolD e e m s L e w i s M c K i n l e yNorth-South Section Palo Alto High SchoolExample of Catwalks Above False ArchesD e e m s L e w i s M c K i n l e yp Palo Alto High SchoolD e e m s L e w i s M c K i n l e ySite Plan Palo Alto High SchoolTree Mitigation StrategyxxxXXXD e e m s L e w i s M c K i n l e yggy Palo Alto High SchoolD e e m s L e w i s M c K i n l e yTree Status Remains SameTree Inventory Plan View from El Camino575 seat max.Palo Alto High SchoolView from El Camino2 November 2011D e e m s L e w i s M c K i n l e y View from El Camino575 seat max.2 N b 2011View from El Camino2 November 2011Aerial ViewRemains Similar Remains Similar View from El Camino540 seats plusPalo Alto High SchoolView from El Caminop2 November 2011D e e m s L e w i s M c K i n l e yRemains Similar Performing Arts Center gSchedule1. BOE Presentation December 13, 2011,Schematic Design2. DSA submittal July 20123. Bid / Award April 20135SC iJ20135.Start Construction June 20136. Planned Occupancy August 2015Palo Alto High SchoolD e e m s L e w i s M c K i n l e y Proposed Schematic Design BudgetProposed Schematic Design BudgetEstimated Construction Cost $17,350,000Change Order Contingency $ 1,735,000Total Construction Budget $19,085,000Soft Costs (Architect, CM, Inspection, Other fees)$ 5,310,049 (p)Total Proposed Project Budget $24,395,049Palo Alto High SchoolD e e m s L e w i s M c K i n l e y ARCHITECTUREA R C H I T E C T U R E