Loading...
Planning & Design Meetings Subcommittee Meeting 5/1/2012 - MinutesSubcommittee Meeting Palo Alto High School 01 May 2012 Page 1 PALO ALTO HIGH SCHOOL Palo Alto Unified School District PERFORMING ARTS CENTER (PAC) SUBCOMMITTEE MEETING DATE: 1 May 2012, 3:30 pm -4:30 pm SUBJECT: Palo Alto High School Performing Arts Center ATTENDEES: Sign-in sheet (attached) The following are the highlights of the meeting: 1. Tom Hodges (TH) explained that the Schematic Design Phase of the project is now complete and that the purpose of the meeting is to review the design as it is now realized in greater detail. He explained that a Value Engineering session with DLM and consultants occurred to evaluate the design and cost. This meeting will review value engineering items being discussed that could potentially impact the Subcommittee. Subcommittee reviewed the latest interior and exterior renderings and expressed approval. 2. The following Value Engineering items were discussed: • Removal of the third catwalk o Subcommittee expressed acceptance of the removal of the third catwalk (previously provided for the purpose of maintaining the rear row of house lights. TH mentioned that Ron Smith had confirmed that the District has a lift that can be used to maintain the lights if they cannot be accessed by a catwalk. • Green Room, folding Partition o Subcommittee expressed acceptance of a manual folding partition in the Green Room in lieu of the motorized partition currently shown in the documents. TH relayed Ron Smith’s concern that a motorized partition would eventually break or required maintance. Subcommittee stated that they had thought it was going to be manual all along and did not know that it was being shown to be motorized. • Classroom window height o Subcommittee expressed acceptance of reduced window height at the classroom (with a new top height of approximately 9 feet above finish floor). Subcommittee stated that they do want some windows but taller windows were not necessary and would just make blocking them when necessary more difficult. • Basement size o Brad Gunkel (BG) reviewed reduced basement size and explained that DSA may require an elevator (in lieu of the wheelchair lift currently shown) if the basement size is not reduced. Cost of basement space is high as is that of an elevator. Subcommittee Meeting Palo Alto High School 01 May 2012 Page 2 o Michael Najar (MN) stated that it would be helpful if a method of organizing storage were introduced (such as cabinets or shelves) to better structure the use of the reduced space so that it does not become too cluttered. Taking this into consideration, Subcommittee accepted reduced basement square footage. o James Hilmer (JH) stated concerns about maintenance and cleaning of mechanical plenums under stage. He asked if a screen could be provided at the grate to prevent items from falling through. He also asked if a portion of the grate in front of the doors to piano storage could be deleted to provide a smooth surface for the piano to roll out over. 3. Other Discussions: • JH explained that after discussion and evaluation of the motorized counterweight sets for fixed electric battens, the theater group prefers it not to be motorized. Next Meetings (Information): 4. A Technical Check-in Meeting will be scheduled during the Design Development Phase. 5. Landscape Committee Meeting scheduled for May 15th at 1:30. END Prepared by Brad Gunkel of Deems Lewis McKinley. Please advise in writing if you feel that any of the above items are inaccurate. cc: Attendees, File