1. Aimee Lopez (AL) called the meeting to order and handed out the agenda for the
meeting. Erwin Lee (EL) gave a brief overview of the status of the Theater design.
2. EL presented a Theater / Building 100 space diagram and handed out copies. The
purpose of the diagram was to show the proposed area to be captured by the
performing arts program. Chris Ades (CA) showed enlarged plans of Building 100
and the new Theater.
3. As a reference point, the Theater plans prepared by DLM for grant purposes only,
were used as an example for discussion purposes. The group studied the plans and
the space diagram and the ensuing discussion was as follows:
Building 100
EL noted that the space diagram shows 5,850 square feet in Building 100 given
over to the Theater’s programmatic needs. Given the limited footprint for the new
Theater the intent is to fit as many functions as practical into Building 100.
Diagram shows expanding exterior walls to the existing columns in order to
maximize the available area in Building 100.
Rachel Kellerman (RK) noted that the Home Economics classroom at the
northeast corner of Building 100 cannot move until the CTE building is built.
Areas available for re-purposing are the rooms south of it and a large office
adjacent to the Women’s Room.
Question was asked if the remodel of Building 100 was funded and EL answered
that yes it is though the work is not part of the Group 2 projects. Modernization of
Building 100 is slated to occur a few years later than the Theater.
EL suggested that if the current Band Room is too small it can be relocated to the
5,850 SF space and the Choir Room (also too small) could move into the existing
Band Room. Kathleen Woods (KW) noted that this discussion would have to wait
for Michael and Jeff who are not in attendance today.
Theater
KW noted that an instructional space was a priority and ideally it should be
located in the Theater. A second floor over the first floor storage area was
discussed as a way to increase area without expanding the building footprint.
RK noted that the instructional space could be located on the second floor.
PALO ALTO HIGH SCHOOL THEATER COMMITTEE MEETING
Palo Alto Unified School District
20 January 2010
P. 2
Chris Ades (CA) noted that a balcony was being considered for the Theater. A
balcony would shorten the length of the auditorium and allow more accessory
spaces within the same building footprint. JD agreed and suggested the seating
could have 400 on the first level and 200 on the balcony.
JD asked the committee what they thought of an instructional space as a black
box theater. Possible uses could include: large classroom, small recital hall,
scene work area, small audience hall, large holding space for groups waiting off-
stage. KW said that the space should function as a secondary rehearsal space
with seating for 50-120 and it should be intimate with a multi-use capacity. JD
observed that the space need not be a fully realized black box theater but rather
a simple room, finished in black with a pipe grid capable of supporting a simple
lighting system for modest and informal performances, such as scene work.
JD noted that the ERC room (Library) was a good size comparison for the
instructional space measuring approximately 32-feet by 44 feet. He added that
1,500 to 1,800 SF was an ideal size.
KW noted that a design classroom for 30 students was desired to teach lighting
and costume design. It was also suggested that this program could happen in
the Media Arts building.
JD noted that because of the nature of the design classroom’s curriculum it
would most likely occur in various locations and therefore there wasn’t a need
for a dedicated design classroom space.
JD asked the group if an orchestra pit was needed. KW answered that yes it
was essential. The type of musicals produced here such as Fiddler on the Roof,
require an orchestra pit for about 30 to 35 musicians. Adam Shalleck (AS) noted
that an orchestra pit is essentially a basement so it made sense to add more
area for storage to maximize the efficiency, budget permitting. The depth of an
orchestra pit is approximately 9-feet clear from the floor above.
Aimee Lopez (AL) noted that there’s a high water table which could lead to
waterproofing issues for a basement. EL noted that he would check the
geotechnical report.
3. AL asked the committee to review the Space Program Planner prepared by the
Shalleck Collaborative. AS began by explaining that the spaces and numbers on the
left (in blue) came from the initial Theater plans while the spaces and numbers in
black were from the Shalleck Collaborative and represented an ideal program
based on the committee’s initial feedback. Space by space explanation of the
program and discussion followed:
Lobby at 3,000 SF is larger than the initial design. AS noted that the lobby
should be as large as possible in order to hold a standing audience, however
the space can be flexible.
Restrooms are larger than the initial design and all agreed that for a theater
large restrooms were a priority.
Catering can be accounted for in the new Media Arts building. All agreed
that another one was not necessary.
Auditorium includes a balcony which will actually reduce the overall size
of the space. Both accommodate 600.
Stage (35’x90’) is currently sized for a band size of 120. An ‘Apron’ can
extend beyond the stage through the proscenium.
PALO ALTO HIGH SCHOOL THEATER COMMITTEE MEETING
Palo Alto Unified School District
20 January 2010
P. 3
Instrument Storage is assumed to be a need. AS asked if there was a
grand piano to store and the answer was no but the committee would like
to have one in the future and make accommodations for it.
Trap Room is a room below the front center portion of the stage used for
special effects and storage. The committee noted that it was great to have but
agreed it was not a necessary component considering the cost. JD agreed to
provide cost estimates for the trap room and orchestra pit.
Control Room at 200 SF should be large enough to accommodate 3 to 4
people for instructional purposes. Committee members thought that
instruction could occur outside this space so it can become smaller.
Follow Spot Rooms are typically located behind the aisles but final location is
still being determined. They should accommodate 2 people each and all agreed
that there should be a minimum of two follow spot rooms.
Green Room and Dressing Rooms are based on a layout with a large
gathering space in the center with make-up stations flanked by Boy’s and
Girl’s Changing Rooms on each side. AS drew a diagram of this layout and
another layout with separate Boy’s and Girl’s Green Rooms. All agreed that the
layout they preferred had the large center space.
Loading Area is a small receiving area close by the stage. James Hilmer (JH)
noted that most deliveries will be done by a small truck and that there wouldn’t
be any large trailer trucks. All agreed that this area, if required, should be
screened from view from the shopping center across the street.
Drama Classroom (Instructional Flexible Space) is to be a minimal size of
1,200 SF and it’s suggested it be located on the second floor.
Scene Prop Shop and Scene Storage can share a large space and JD
suggested location in Building 100. Currently the Scene Shop occupies a
small room in Building 100 and JH noted that most scene constructions occur
outdoors because of size constraints. Given the delay for Building 100
modernization these spaces could temporarily be located in the available
spaces next to Home Economics Classroom.
Costume Shop and Storage should be located close to Scene Prop Shop and
might also be located in Building 100.
Office spaces can be located in the second floor of the Theater.
4. JD recommended the committee visit the theaters at the Sacred Heart schools
in Atherton or Mt. Pleasant High School in Eastside to see a tension grid.
5. JD and AS noted that they would work on the floor plan based on the committee’s
comments. They will present an updated layout that reflects the programmatic elements
discussed and agreed to today.
6. AL noted that the next meeting would occur in about three weeks. More information
will be needed from the Choir and Band instructors.
END
Prepared by Christopher Ades of Deems Lewis McKinley. Please advise if you feel that any of the above
items are inaccurate or need further clarification or detail.
cc: Attendees, File
ME DI A A RTS
BL DG
BLD G 20 0
E XI S TI NG A RT R O OMS
5 ,85 0 S F
TH E ATER
1 6 ,900 S F
H AYMA RKE T T HE ATER
TO TAL 3 ,43 0 S F
ACCESS ORY SPACE 1,3 9 0 SF
BAN D ROO M 2,04 0 S F
TO TAL 1 ,480 SF
ACCESS ORY SPACE 5 20 SF
CH OIR R O OM 9 6 0 SF
T H E AT E R / B U I L D I N G 1 0 0 D I A G R A M
S CA LE 1”=40’-0’80’40 ’20’0
Palo Alto HSertaehTrennalP margorP ecapSOctober 21, 2009STNEMMOC/.TF .QS SSORG.TF .QS TENECAPSA451,81008,11ERTAEHT052,5SEITINEMA NORTAP8,077A.1Lobby - Orchestra Level3,0005555X5sf/person tight but workable for 600; Table seating +/-180A.2Lobby - Balcony Level900A.3051snoissecnoC/stekciTA.4ni thguorb sriahc/selbat ;snoissecnoC001egarotS esuoH fo tnorFA.5Women’s Restrooms400for 300; provide 2 x code = 5; 38 sf/fixtureA.6Men’s Restrooms200for 300; provide 2 x code = 3; 38 sf/fixtureA.7005egarotS & nehctiK gniretaC055,6MUIROTIDUA10,077A.8Seating area - Orchestra Level4,02010 sf/person, 2/3 of audience600A.9Seating area - Balcony Level1,98010 sf/person, 1/3 of audienceA.10Sound & Light Locks45075 sf each, others in gross6A.11001xiM esuoH nIBOTHER FACILITIES13 12020 185BOTHER FACILITIES13,12020,185STAGE & TECHNICAL AREAS 7,42011,415B.1muinecsorp elbatsujda w'54 ;ssorg ni revossorc '6 ;egats ’09 x ’53051,3egatSB.2'55 x '4022noprA egatseroFB.3004tiP artsehcrOManual platforms or lift as budget allows; basementB.4Upstage Support Area450shell/riser storage, large music ensemble overflowB.5)sdnats sriahc ,onaip( stnemurtsni egral002egarotS tnemurtsnIB6Bkt StB.6Backstage Storage200B.7tnemesaB004mooR parTB.857mooR remmiDB.957mooR reifilpmAB.10002mooR lortnoCB.11051moor topswolloFB.12051 smoortseR egatskcaBCh i RB.13Changing Restrooms 150B.14002mooR gnignahC syoBB.15003mooR gnignahC slriGB.16gniteem ,gnitiaw rotca ;pu-ekam009mooR neerGB.17002aerA gnidaoLPage 1 of 32,340X190X170X260X260X 5,260X410X100X2,240X280X200X200X200X260X150X 120180XX180X450X200XTotal 3,220Total 5,770Total 4,660LEGEND: (TEXT IN BLUE REPRESENTS CURRENT THEATER CONCEPT DESIGN)X - In TheaterO - Planned in 100 Building PRELIMINARY
Palo Alto HSertaehTrennalP margorP ecapSOctober 21, 2009STNEMMOC/.TF .QS SSORG.TF .QS TENECAPS007,5SNOITCNUF CSIM8,769B.17"xob kcalb"/stneve gib rof wolfrevo remrofrep/mrssalc amarD002,1moorssalC amarDB.18003aera troppus moorssalC amarDB.19selbat krow ;stneduts 03009moorssalC ngiseD and computer stations, scene & lightingB.20009pohS porP/enecSB.21057egarotS enecSB.22004egarotS porPB.23003pohS emutsoCB.24005egarotS emutsoCB.25ecaps troppus dna eciffO051eciffo rotceriD ertaehTB.261eciffo rotceriD lacinhceT50Office and support space5pp pB.27051aerA kroW yticilbuPB.28Admin. Offices0AREA TOTALS029,42,erA TEN laatoTTotal GROSS Area, Sq. Ft.38,338Total GROSS Area, Sq. Ft.38,338778,23.tF .qS .tF .qS ,tnirptooF detamitsEPage 2 of 3Total 900OOXXOOO9003006504003005003,950Total NET Area, Building 100 Total NET Area, Theater 14,5003,100Total NET Area Total GROSS Area, Building 100 Total GROSS Area, Theater Total GROSS Area 17,60016,4003,40019,800LEGEND: (TEXT IN BLUE REPRESENTS CURRENT THEATER CONCEPT DESIGN)X - In TheaterO - Planned in 100 Building PRELIMINARY
Palo Alto HSertaehTrennalP margorP ecapSOctober 21, 2009STNEMMOC/.TF .QS SSORG.TF .QS TENECAPS"Low" "High"Total GROSS Area, Sq. Ft.38,338 $/sf ROUGH Opinion$400 $475Bld C i C$8$8 62009 Bldg Construction Cost$15,335,385$18,210,769 ,gnivap ,epacsdnal ,krowhtrae ,seitilitu deriuqer lla sedulcni ecnawollA :krowetiSretaining walls, hardscape, site furnishings; Architect to verify$500,000 $1,000,000 2009 Total Construction Cost$15,835,385 $19,210,769Escalation per year5% 5%Escalation number of years11 2010 Total Construction CostCompounded$16,627,154 $20,171,308psnI & gnitseT :sedulcnIreilpitluM tsoC tfoSections, Construction Management, Building Agency Fees, Legal, Advertising, Fixtures, Furniture and Loose Equipment and 5% Contingency. Does not include design fees already contracted.20% 20%Soft Costs Total$3,325,431 $4,034,262"Low" "High"2010 Total Project Cost$19,952,585 $24,205,569Page 3 of 3THEATER (only)Current MP Budget = $ 11,763,000(Construction Cost)PRELIMINARY