Loading...
Planning & Design Meetings Meeting #1 9/9/2009 - MinutesPalo Alto HS FACILITIES STEERING COMMITTEE MEETING Palo Alto Unified School District 03 June 2009 P. 1 PALO ALTO HIGH SCHOOL Palo Alto Unified School District PERFORMING ARTS/THEATER SUBCOMMITEE MEETING #1 DATE: 9 September 2009, 3:15pm-5:00pm SUBJECT: New Theater Conceptual Design ATTENDEES: See attached sign-in sheet The following are the highlights of the meeting: 1. Principal Jacquie McEvoy (JM) called the meeting to order. She introduced various meeting attendees. 2. Stu Berman (SB) showed a power point presentation of the Theater subcommittee’s design objectives. The desired theater usage is for: instrumental and choral concerts, plays, musicals, films, and school assemblies. The stage needs to fit 120 musicians for instrumental concerts. The desired seat count is 450 to 500 for musicals and 600 for assemblies, enough to seat an entire class such as the sophomore class. Other desired features include: a large stage, “green” room, orchestra pit, fly-loft, ample dressing rooms and storage, and a low exterior profile. 3. James Hilner (JH) explained how important music is for the performing arts curriculum. A stage able to fit a band of 120 musicians is important. He expressed his desire for a theater that can operate successfully for both music and drama. 4. Architect Erwin Lee (EL) introduced Adam Shalleck (AS), from the Shalleck Collaborative, who is a theater consultant. AS explained various aspects affecting Theater design. His presentation and ensuing discussion were as follows: Multi-Purpose Theaters  AS mentioned that a 600-seat theater works well for a multi-purpose venue.  AS explained how a school theater must serve various functions and how this can be done without compromising performance.  AS showed with a power-point animation how a theater can be converted from a drama venue into an acoustical music venue by the addition of a portable band shell that can be put together by 4 students. The shell includes a ceiling that is hoisted above when not in use. The walls require a 250 SF storage area and the overall cost is about $175,000.  AS explained how the shell is especially necessary if the Theater has a Fly Loft, as the shell directs all the sound out to the audience preventing it from being lost in the high bay space above the stage. For theaters without a Fly Loft the same acoustical treatment that’s over the seating area can continue over the stage. Palo Alto HS FACILITIES STEERING COMMITTEE MEETING Palo Alto Unified School District 03 June 2009 P. 2 Fly Loft or no Fly Loft  AS explained that theaters either have a Fly Loft over the stage or they have a tension grid that allows changes in scenery in a limited fashion. A Fly Loft allows full flexibility for quick scenery changes.  AS explained how a Fly Loft works, its size requirements (2 ½ times the height of the proscenium) and cost impacts. He also showed an animation of how it operates to change scenery through a system of counterweights.  AS showed examples of a tension grid system that does not require a high space above the stage.  AS explained how a Fly Loft is valuable to students as an instructional feature. He noted that the ambition of the audience generally determines the ambition of the stagecraft. Orchestra Pit of no Orchestra Pit  AS explained the requirements of an orchestra pit. It is generally 8-feet below the stage level and requires two exit stairs and a wheelchair lift for access. The pit typically extends out about ten feet beyond the proscenium and the platform can be raised that extends stage area, when not in use.  AS explained the benefits of an orchestra pit. They are valuable for musicals when singers are on stage and can project their voices over the musicians. 5. The following questions were directed to AS and EL: TH asked when can the decision be made to have or not have a Fly Loft? o AS answered that the decision should be made early on as it affects the overall theater design and budget. James Hilmer (JH) asked; how will the Theater house a band of 120? o AS answered that the size of the stage will be driven by the size of the band. He would not recommend that the Green Room accommodate such large numbers and that the Choral Room in Bldg. 100 could serve the purpose for these events. Caroline Willis (CW) asked; will the desired program would fit on the site and would the instructional spaces be included? o EL answered that a conceptual design has been started and presented first and second floor plans of a 600-seat Theater with preliminary spatial layouts. o EL noted that the site area is not large enough to house the instructional spaces and that it’s assumed that Building 100 will house these as it already does, as well as others that will be accommodated after the modernization of Building 100. TH asked; what construction cost per SF are we looking at for the Theater? o AS answered that it depended on the program and on fluctuating construction costs. Recent experience shows that it can range from $320 to $715 per SF. o EL added that the conceptual budget is based on a 15,500 SF theater at roughly $600 per SF. SB asked; does it makes sense to build the without all the equipment in place? o AS answered that yes it does and that the Theater can be outfitted later on. Palo Alto HS FACILITIES STEERING COMMITTEE MEETING Palo Alto Unified School District 03 June 2009 P. 3 AS asked; how may theaters have the Theater Subcommittee visited? o SB answered that they have visited 6 theaters including: Saratoga and Foothill. AS noted that he recommends they visit more including the California Theater. 6. JM explained that she intends to pursue a potential $3 million dollars in grant money that became available, in order to better fund equipment for the Theatre. Holly Ward of ‘Theater Boosters’ noted that her organization is very willing to help in raising money for the Theater project. 7. TH noted that we need to develop a conceptual design and program and account for an increase in student population. 8. AS and EL noted that they can address this group again in October after reviewing the building layout and program information. AS will develop a building program based on the various programmatic notes the subcommittee has given him. The next discussion promises to be more detailed and address issues such as, building features versus budget and building dimensions. END Prepared by Christopher Ades of Deems Lewis McKinley. Please advise if you feel that any of the above items are inaccurate or need further clarification or detail. cc: Attendees File