Planning & Design Meetings 12/2/2014 - PresentationDLMA R C H I T E C T U R EP A L O A L T O H I G H S C H O O L Palo Alto Unified School District2 December 2014Building 500 Renovation (Library)
Building 500 Renovation (Library)Palo Alto High SchoolPalo Alto Unified School DistrictExisting Building Floor Plan
Building 500 Renovation (Library)Palo Alto High SchoolPalo Alto Unified School DistrictConcept PlanSept 2014•Library faces directly to the quad•Student Activities opens to quad and can expand into Gallery•Gallery area is located in the double height space•Glass at exterior and interior to create long views and transparency•New set of student restrooms open directly to the quad•Guidance has direct access to both interior and exterior
Proposed Programs for Building 500:1. Library2. Student Activities3. Instructional Spaces4. Staff Collaboration5. Computer Lab6. Flexible Teaching “Maker Space”7. College Career Center8. Guidance9. Staff and Student RestroomsBuilding 500 Renovation (Library)Palo Alto High SchoolPalo Alto Unified School District
Building 500 Renovation (Library)Palo Alto High SchoolPalo Alto Unified School DistrictFloor Plan: 14 September•13,000 SF•265 Seating Capacity (approx.)Proposed Floor Plan:•13,000 SF (including mezzanine)•265 Seating Capacity (approx.)
Building 500 Renovation (Library)Palo Alto High SchoolPalo Alto Unified School DistrictFloor Plan
Palo Alto High SchoolPalo Alto Unified School DistrictTower BuildingFirst FloorFuture Program
Palo Alto High SchoolPalo Alto Unified School DistrictTower BuildingSecond Floor Future Program
Anticipated Schedule:Jan 2015 Complete Schematic DesignJul/Aug 2015 DSA submittalMay 2016 –Jun 2016 Bid PeriodJul 2016 –Aug 2017 ConstructionBuilding 500 Renovation (Library)Palo Alto High SchoolPalo Alto Unified School District
A R C H I T E C T U R E