Loading...
Planning & Design Meetings 1/4/2010 - PresentationA R C H I T E C T U R E SCHEMATIC DESIGNSCHEMATIC DESIGN GROUP 1 PROJECTS P A L O A L T O H I G H S C H O O L Palo Alto Unified School District 12 January 2010 DLM A R C H I T E C T U R E 1 Classroom BuildingClassroom Building Media Arts Buildingg PaloAlto High SchoolPalo Alto High School D e e m s L e w i s M c K i n l e y 2 Media Arts Building •Two-story building of approximately 23 250 SF (current trend)Two story building of approximately 23,250 SF (current trend) 20,500 SF (9/22/09) •Four departmental and four FSC meetings to review and discuss plan layout C tl fi i d i ith d t il d dj ti fl•Currently refining design with more detail and adjusting floor area •Responding to previous community comments by creating building exteriors that take more visual cues from the existing Tower and Haymarket Building. Palo Alto High School D e e m s L e w i s M c K i n l e y 22 Sept 2009 12 Jan 2010 Palo Alto High School D e e m s L e w i s M c K i n l e y First Floor Plan 3 22 Sept 2009 12 Jan 2010 Palo Alto High School D e e m s L e w i s M c K i n l e y Second Floor Plan • Clerestory around “the Forum” PaloAlto High School • Overlooks from balcony • Viewing platform •Transparency between spaces Palo Alto High School D e e m s L e w i s M c K i n l e y section through building 4 Walter Cronkite School at ASUWalter Cronkite School at ASU PaloAlto High SchoolPalo Alto High School D e e m s L e w i s M c K i n l e y PaloAlto High SchoolPalo Alto High School D e e m s L e w i s M c K i n l e y 5 • Similar fenestrations patterns • Entry gates and site features • Trellis and awnings elements • Outdoor spaces Wll f d l•Wall surfaces and color • Tile roof to match existing PaloAlto High SchoolPalo Alto High School D e e m s L e w i s M c K i n l e y 22 Sept 2009 PaloAlto High School 12 Jan 2010Views from Embarcadero RoadPalo Alto High School D e e m s L e w i s M c K i n l e y 12 Jan 2010Views from Embarcadero Road 6 PaloAlto High School Embarcadero Road Elevation Palo Alto High School D e e m s L e w i s M c K i n l e y • Modern facade to campus representing the face of media • Combining the new with the existing • Blending existing character with new identity 22 Sept 2009 PaloAlto High School 12 Jan 2009Palo Alto High School D e e m s L e w i s M c K i n l e y 7 22 Sept 2009 fPalo Alto High School D e e m s L e w i s M c K i n l e y 12 Jan 2010View from 100 Building 22 Sept 2009 • Develop outdoor seating area • Gathering spaces • Gateway from Embarcaderoy 12 Jan 2010view from 200 Building Palo Alto High School D e e m s L e w i s M c K i n l e y 8 Group 2 Project - Media Arts Project Milestones: Media Arts Building Schematic Design Approval:26 January 2010Schematic Design Approval: 26 January 2010 Design Development Phase: January 2010 - March 2010 Construction Documents Phase: April 2010 - June 2010 DSA R i P i d J 2010 Fb 2011DSA Review Period:June 2010 -February 2011 Bid / Award Phase:March 2011 - May 2011 Construction:June 2011 – June 2013 BUDGET:$7,700,000 COST ESTIMATE:$8,060,379 ESTIMATED CHPS POINTS: 30 – 45 (25 minimum) PaloAlto High SchoolPalo Alto High School D e e m s L e w i s M c K i n l e y 9 Classroom Building: Math and Social Sciences •Two-story building of approximately 38,300 SF (current trend) 36 850 SF (9/22/09)36,850 SF (9/22/09) •Incorporate central plant services into the classroom building by adding a boiler and pump room on the first floor and roof mounted air chillers. P j t i l d it hill d d h t t it i i•Project scope includes site chilled and hot water site piping •Visited a two-story school with a similar central plant configuration to determine if noise was a problem for adjacent classrooms—it was not. •Three departmental and four FSC meetings to review and discuss plan layout Palo Alto High School D e e m s L e w i s M c K i n l e y First Floor History and Social Sciences 22 Sept 2009 • Access to core without going through Resource Rm • Central plant services incorporated on 1 st floor •Large flexible classroom PaloAlto High School Large flexible classroom • Covered walkway to Building 700 Palo Alto High School D e e m s L e w i s M c K i n l e y 12 Jan 2010 10 Second Floor Math 22 Sept 200922 Sept 2009 At ithtithhR R•Access to core without going through Resource Rm • Large flexible classroom Palo Alto High School D e e m s L e w i s M c K i n l e y 8 Dec 200912 Jan 2010 22 Sept 2009 PaloAlto High School D e e m s L e w i s M c K i n l e y Palo Alto High School 12 Jan 2010 11 PaloAlto High SchoolPalo Alto High School D e e m s L e w i s M c K i n l e y 22 Sept 2009 PaloAlto High SchoolPalo Alto High School D e e m s L e w i s M c K i n l e y 12 Jan 2010View from court between Library and 400 Building 12 • Sloping tile roofs • Bas Reliefs in wall with arched motifs • Window fenestrations similar to Tower Building • Vertical elements suggestive of buttresses PaloAlto High SchoolPalo Alto High School D e e m s L e w i s M c K i n l e y 22 Sept 2009 PaloAlto High School 12 Jan 2010View from 700 BuildingPalo Alto High School D e e m s L e w i s M c K i n l e y 12 Jan 2010View from 700 Building 13 22 Sept 2009 12 Jan 2010View from 900 BuildingPalo Alto High School D e e m s L e w i s M c K i n l e y 12 Jan 2010View from 900 Building Group 2 Project - Classroom Building 14 Project Milestones: Classroom Building Schematic Design Approval:26 January 2010Schematic Design Approval: 26 January 2010 Design Development Phase: January 2010 - March 2010 Construction Documents Phase: April 2010 - June 2010 DSA R i P i d J2010Fb 2011DSA Review Period:June 2010 -February 2011 Bid / Award Phase:March 2011 - May 2011 Construction:June 2011 - June 2013 BUDGET:$15,800,000 COST ESTIMATE:$15,442,515 ESTIMATED CHPS POINTS: 30 – 45 (25 minimum) PaloAlto High SchoolPalo Alto High School D e e m s L e w i s M c K i n l e y CHPS V ifi d P j t Targeted Points: 30-40 (25 points minimum) CHPS Verified Project Sustainable Design and Strategies Sustainable Sites Water Energy Materials Reduce bldg. footprint, bicycles, water run off Conservation, low flow fixtures, efficiencies HVAC systems, energy mgmt High recycle content construction waste mgmtMaterials Indoor Environmental Quality High recycle content, construction waste mgmt Daylighting, ventilation/filtration, acoustics Palo Alto High School D e e m s L e w i s M c K i n l e y 15 Next Steps: •Schematic Design Phase approval by Board of Education in January 2010Schematic Design Phase approval by Board of Education in January 2010 •Submit documents to DSA in June 2010 •Commence building construction of Math/Social Sciences and Humanities d th M di A t B ildi i i 2011and the Media Arts Building in spring 2011 •Continue working through the CEQA process and mitigation measures •Continue working through the Landscape Master Plan to compliment the Facilities Master Plan Palo Alto High School D e e m s L e w i s M c K i n l e y A R C H I T E C T U R E 16