Planning & Design Meetings Neighborhood Meeting #2 3/12/2009 - PresentationDLMA R C H I T E C T U R E
DLMA R C H I T E C T U R EPALO ALTO H I G H S C H O O L M A S T E R P L A N Palo Alto Unified School District12 March 2009
Master Plan Project Groupings:CONSIDERATIONS• Projects currently under construction such as athletic fields• Project that will happen regardless of priority list such as interim housing and upgrades to infrastructure• Projects that are a high priority to the school such as classroom space• Projects grouped together for ease of construction and phasing sequences such as those in the same areaPalo Alto High School Master PlanD e e m s L e w i s M c K i n l e y
Master Plan: Project ListPreliminary1. Football Stadium Bleachers $ 1.87m (project cost w/escalation)2. Multi-use Fields $ 2.493. Interim Housing $ 0.944. Classroom Building $21.955. Media Arts Center $10.68 6. New Science Lab at Existing Science Building $ 0.797. Utilities, Maintenance and Infrastructure $ 3.288. Theater $16.349. Theater Parking and Drop-off $ 1.3810. Library Renovation and Upgrade $ 9.3511. Lecture Hall Renovation (Bldg. 300A) $0.89mPalo Alto High School Master PlanD e e m s L e w i s M c K i n l e y
Master Plan: Project ListPreliminary12. Renovate Buildings 100, 300 and 700 $ 2.66(project cost w/escalation)13. Weight Room/ Fitness Center $ 6.8814. Career Tech Building $11.8615. Tower Building Renovation – Phase 1 $ 7.9116. Tower Building Renovation – Phase 2 $21.4717. Haymarket Theater Renovation $ 7.9518. New Gymnasium $12.8919. Gymnasium Modernization $ 2.73 20. Expand and Modernize Student Center (Option A) $ 9.19 21. Center Campus Site Development $ 3.9122. Modernization and Upgrades $ 7.03 .Palo Alto High School Master PlanD e e m s L e w i s M c K i n l e y
Master Plan: Project ListPreliminary23. Embarcadero/El Camino Entry and Parking $ 3.91m (project cost w/escalation)24. Churchill Ave Entry and Parking $ 5.8625. Miscellaneous Site Improvements $ 3.9126. Others $ 0.00TOTAL $ 178.12Note:•Various projects could be grouped together to create fewer, larger projects in lieu of many smaller projects. •Some project, such as infrastructure upgrades, are a high District priority.Palo Alto High School Master PlanD e e m s L e w i s M c K i n l e y
Master Plan Projects Groupings:Preliminary (cost)project cumulativeR Interim Housing $ 0.94m $ 0.94m1. Football Stadium Bleachers, Multi-use Fields $ 4.36 $ 5.302. Classroom Bldg, Media Arts, Science Lab, Infrastructure $36.70 $42.003. Theater, Theater Parking, Weight Rm./Fitness Center, Library Renovation, Lecture Hall 300A , $34.84 $76.844. Career Tech, Bldg. 100(minor), 300, and 700 RenovationTower Bldg. – Phase 1 $22.43 $99.275. Tower Bldg. – Phase 2, Haymarket, New Gym, Gym Mod$45.04 $144.316. Student Center Addition and Remodel, Quad,Churchill Parking and Plaza, Misc. Site Improvements,Embarcadero/El Camino Parking $33.81 $178.12 TOTAL$178.12Palo Alto High School Master PlanD e e m s L e w i s M c K i n l e y
Master Plan Projects Groupings:Preliminary (cost)project cumulativeR Interim Housing $ 0.94m $ 0.94m1. Football Stadium Bleachers, Multi-use Fields $ 4.36 $ 5.302. Classroom Bldg, Media Arts, Science Lab, Infrastructure $36.70 $42.003. Theater, Theater Parking, Weight Rm./Fitness Center, Library Renovation, Lecture Hall 300A , $34.84 $76.844. Career Tech, Bldg. 100(minor), 300, and 700 RenovationTower Bldg. – Phase 1 $22.43 $99.275. Tower Bldg. – Phase 2, Haymarket, New Gym, Gym Mod$45.04 $144.316. Student Center Addition and Remodel, Quad,Churchill Parking and Plaza, Misc. Site Improvements,Embarcadero/El Camino Parking $33.81 $178.12 TOTAL$178.12Palo Alto High School Master PlanD e e m s L e w i s M c K i n l e y
Master Plan:PROPOSAL WITH CORPORATION YARD RELOCATED•Relocate tennis courts•Add basketball courts•Expand sports plaza•Creates food concessions and restrooms•Provide additional teacher parking adjacent to new classroom building•Create outdoor learning areas adjacent to new classroom building•Provide more room around west baseball diamond•Create additional parking adjacent to district officePalo Alto High School Master PlanD e e m s L e w i s M c K i n l e y
DLMA R C H I T E C T U R E