Planning & Design Meetings Meeting #8 2/18/2009 - PresentationA R C H I T E C T U R E PALO ALTO H I G H S C H O O L M A S T E R P L A N Palo Alto Unified School District18 February 2009DLM18 February 2009DLMA R C H I T E C T U R E Master Planning Process:•Review existing documents and site walks of the campusesReview existing documents and site walks of the campuses• Initial master plan meetings to review, discuss, and exchange ideas• Testing of ideas from the initial meetings through conceptual plan options• Review conceptual plans and develop further based on specific input• Revise conceptual plans and finalize documentationPalo Alto High School Master PlanD e e m s L e w i s M c K i n l e y Master Planning Phases:CONSIDERSATIONS•Projects currently under construction such as athletic fieldsProjects currently under construction such as athletic fields• Project that will happen regardless of priority list such as interim hi d dtiftthousing and upgrades to infrastructure• Projects that are a high priority to the school such as classroom space• Projects grouped together for ease of construction and phasing sequences such as those in the same areaPalo Alto High School Master PlanD e e m s L e w i s M c K i n l e y Master Plan: Project ListPreliminary1. Football Stadium Bleachers $ 1.15m (construction cost)2Multi-use Fields$2102.Multiuse Fields$ 2.103. Interim Housing $ 0.754. Classroom Building $17.255C T h B ildi$8255.Career Tech Building$ 8.256. Theater/Performing Arts Center $20.207. Haymarket Theater Renovation $ 5.308. Library Renovation and Upgrade $ 7.509. Media Arts Center $12.56$76.17m10. Weight Room/ Fitness Center $ 5.2511. New Gymnasium $ 8.75Subtotal $89.06mPalo Alto High School Master PlanD e e m s L e w i s M c K i n l e y Master Plan: Project ListPreliminary12. Gymnasium Modernization $ 1.7513Expand and Modernize Student Center (OptionA)$65013.Expand and Modernize Student Center (Option A)$ 6.5014. Replace Student Center (Option B) $8.70m $ 0.0015. New Science Lab at Existing Science Building $ 0.6016R ti f T B ildi$12 4416.Renovation of Tower Building$12.4417. Center Campus Site Development $ 2.5018. Modernization and Upgrades $ 4.5019. Churchill Ave Entry and Parking $ 3.7520. Embarcadero/El Camino Entry and Parking $ 3.5021. Embarcadero Access Road $ 0.6022. Miscellaneous Site Improvements $ 2.75Subtotal $38.89mPalo Alto High School Master PlanD e e m s L e w i s M c K i n l e y Master Plan: Project ListPreliminary23. Utilities, Maintenance and Infrastructure $ 2.5024Others$00024.Others$ 0.00Subtotal $ 2.50mTOTAL $ 130.45Note:•Various projects could be grouped together to create fewer, larger projects in lieu of many pj g p g , gpj ysmaller projects. •Some project, such as infrastructure upgrades, are a high District priority.Palo Alto High School Master PlanD e e m s L e w i s M c K i n l e y Master Planning Phases:Preliminary (cost)PROPOSED PHASES construction project1. Interim Housing $ 0.75m $0.98m2.Football Stadium Bleachers, Multi-use Fields$ 3.05 4.362.Football Stadium Bleachers, Multiuse Fields$ 3.05 4.363. Classroom Bldg, Library Renovation and Upgrade, Utilities and Infrastructure $ 27.25 35.434MediaArts Center Career Tech Science Lab$ 2141 27834.Media Arts Center, Career Tech, Science Lab$ 21.41 27.835. Theater/Performing Arts Center , EmbarcaderoEl Camino Parking and Access $ 24.30 31.606. Haymarket Theater and Tower Bldg Renovation $ 17.74 23.067. Weight Rm./Fitness, Gymnasium, Modernizations, Churchill Parking, Student Center, Quad $ 35.75 46.48TOTAL 169.74PaloAlto High School Master PlanPalo Alto High School Master PlanD e e m s L e w i s M c K i n l e y Next Steps:•Prioritization and phasingPrioritization and phasing• Implementation and scheduling• Finalize documentation• Approval by Board of Education• Authorization to commence projectsGunn High School Master PlanD e e m s L e w i s M c K i n l e y A R C H I T E C T U R E