Planning & Design Meetings Steering Committee Meeting 1/6/2010 - PresentationA R C H I T E C T U R E SCHEMATIC DESIGNSCHEMATIC DESIGN GROUP 1 PROJECTS H. M. GUNN H I G H S C H O O L Palo Alto Unified School District 12 January 2010 DLM ARCHITECTUREA R C H I T E C T U R E 1 Gymnasium Classroom Bldg A Classroom Bldg. B Classroom Bldg. A Gunn High SchoolGunn High School D e e m s L e w i s M c K i n l e y 2 Classroom Building ‘A’: Math and English •Two-story building of approximately 40 850 SF (current trend)Two story building of approximately 40,850 SF (current trend) 37,850 SF (9/22/09) •Added one lab space to each floor in lieu of having an oversized, flexible l h fl Th t t l l t i 14 hclassroom on each floor. The total classroom count remains 14 on each floor. •Air conditioning included in new building •Two departmental and four FSC meetings to review and discuss plan layout as well as three coordination meetings with IT and Facilities Maintenance Gunn High School D e e m s L e w i s M c K i n l e y 22 Sept 2009 12 Jan 201022 Sept 2009 12 Dec 2010 Gunn High School D e e m s L e w i s M c K i n l e y English Dept First Floor 3 22 Sept 2009 12 Jan 2010 Gunn High School D e e m s L e w i s M c K i n l e y Math Dept Second Floor 22 Sept 2009 Gunn High SchoolGunn High School D e e m s L e w i s M c K i n l e y 12 Jan 2010 4 22 Sept 2009 Gunn High SchoolGunn High School D e e m s L e w i s M c K i n l e y 12 Jan 2010 22 Sept 2009 Gunn High School 12 Jan 2010 View from amphitheaterGunn High School D e e m s L e w i s M c K i n l e y 12 Jan 2010View from amphitheater 5 View from parking across amphitheater Gunn High SchoolGunn High School D e e m s L e w i s M c K i n l e y Gunn High SchoolGunn High School D e e m s L e w i s M c K i n l e y 6 Project Milestones: Classroom Building A Schematic Design Approval:26 January 2010Schematic Design Approval: 26 January 2010 Design Development Phase: January 2010 - March 2010 Construction Documents Phase: March 2010 - June 2010 DSA R i P i d J2010Fb 2011DSA Review Period:June 2010 –February 2011 Bid / Award Phase:March 2011 - May 2011 Construction:June 2011 – June 2013 BUDGET:$14,040,000 COST ESTIMATE:$13,536,920 ESTIMATED CHPS POINTS: 30 – 45 (25 minimum) Gunn High School D e e m s L e w i s M c K i n l e y Classroom Building ‘B’: World Languages •Single-story building of approximately 6 650 SF (current trend)Single story building of approximately 6,650 SF (current trend) 6,600 SF (6/23/09) •Created IS workstation and increased workroom, more defined office and resource area •Air conditioning included in new building •One departmental and four FSC meetings to review and discuss plan layout Gunn High School D e e m s L e w i s M c K i n l e y 7 22 Sept 2009 Gunn High SchoolGunn High School D e e m s L e w i s M c K i n l e y 12 Jan 2010 22 Sept 2009 Gunn High School 12 Jan 2010 View from Arastradero RoadGunn High School D e e m s L e w i s M c K i n l e y 12 Jan 2010View from Arastradero Road 8 View from Arastradero Road S l d ti f i ti b ildi•Scale and proportion of existing buildings • Rhythm of columns and vertical features • Sun shading system at glass areas Gunn High SchoolGunn High School D e e m s L e w i s M c K i n l e y View from Library Gunn High SchoolGunn High School D e e m s L e w i s M c K i n l e y View from Science Building 9 Gunn High SchoolGunn High School D e e m s L e w i s M c K i n l e y Project Milestones: Classroom Building B Schematic Design Approval:January 2010Schematic Design Approval: January 2010 Design Development Phase: January 2010 - March 2010 Construction Documents Phase: April 2010 - June 2010 DSA R i P i d J 2010 Fb 2011DSA Review Period:June 2010 -February 2011 Bid / Award Phase:March 2011 – May 2011 Construction:June 2011 - June 2012 BUDGET:$2,760,000 COST ESTIMATE:$2,858,870 ESTIMATED CHPS POINTS: 30 – 45 (25 minimum) Gunn High School D e e m s L e w i s M c K i n l e y 10 Gymnasium •Single-story building of approximately 20,260 SF (current trend) 20 400 SF (9/22/09)20,400 SF (9/22/09) •Move weight and fitness room to new gymnasium in lieu of wrestling •Wrestling will occupy converted space in existing gym by combining the i ti tli d d i t lexisting wrestling and dance space into one large space •Remove and replace one side with new set of bleachers in the existing gym in lieu of leaving both sides as is. •Covered connection to existing gymnasium •Three departmental and four FSC meetings to review and discuss plan layout Gunn High School D e e m s L e w i s M c K i n l e y 22 Sept 2009 G nn High SchoolGunn High School D e e m s L e w i s M c K i n l e y 12 Jan 2010 11 Modernization Scope • Remove and replace existing wood floor •Replace light fixturespg • Remove bleachers and replace new at one side • Reconfigure existing wrestling/dance room • Convert existing weight room to classrooms • Provide wind/rain screen at south entry WIND/RAIN SCREEN Gunn High School Modernization at Existing Gymnasium Gunn High School D e e m s L e w i s M c K i n l e y 22 Sept 200922 Sept 2009 Gunn High School 12 Jan 2010View from parkingGunn High School D e e m s L e w i s M c K i n l e y 12 Jan 2010View from parking 12 • Natural lighting through clerestory windows • Translucent fiberglass panels to diffuse light Ttttkffllihtdi Gunn High School •Truss structure to make roof feel light and airy • Covered connection to existing gym Gunn High School D e e m s L e w i s M c K i n l e y • Glass entry lobby • Covered entry / arrival • Exterior sun shading devices •Translucent fiberglass panels•Translucent fiberglass panels Gunn High SchoolGunn High School D e e m s L e w i s M c K i n l e y 13 Gunn High SchoolGunn High School D e e m s L e w i s M c K i n l e y Project Milestones: Gymnasium Schematic Design Approval:26 January 2010Schematic Design Approval: 26 January 2010 Design Development Phase: January 2010 - March 2010 Construction Documents Phase: April 2010 - June 2010 DSA R i P i d J 2010 F b 2011DSA Review Period:June 2010 –February 2011 Bid / Award Phase:March 2010 – May 2011 Construction:June 2011 – November 2012 BUDGET:$ 9,950,000 COST ESTIMATE:$ 9,892,813 ESTIMATED CHPS POINTS: 30 – 45 (25 minimum) Gunn High School D e e m s L e w i s M c K i n l e y 14 CHPS V ifi d P j t Targeted Points: 30-45 (25 points minimum) CHPS Verified Project Sustainable Design and Strategies Sustainable Sites Water Energy Materials Reduce bldg. footprint, bicycles, water run off Conservation, low flow fixtures, efficiencies HVAC systems, energy mgmt High recycle content construction waste mgmtMaterials Indoor Environmental Quality High recycle content, construction waste mgmt Daylighting, ventilation/filtration, acoustics Gunn High School D e e m s L e w i s M c K i n l e y Next Steps: •Schematic Design Phase approval by Board of Education in January 2010Schematic Design Phase approval by Board of Education in January 2010 •Submit documents to DSA in June 2010 •Commence building construction of Math/English, World Languages and G i i S i /S 2011Gymnasium in Spring/Summer 2011 •Continue working through the CEQA process and mitigation measures •Continue working through the Landscape Master Plan to compliment the Facilities Master Plan Gunn High School D e e m s L e w i s M c K i n l e y 15 A R C H I T E C T U R E 16