Planning & Design Meetings Steering Committee Meeting 1/6/2010 - PresentationA R C H I T E C T U R E
SCHEMATIC DESIGNSCHEMATIC DESIGN
GROUP 1 PROJECTS
H. M. GUNN
H I G H S C H O O L
Palo Alto Unified School District
12 January 2010
DLM
ARCHITECTUREA R C H I T E C T U R E
1
Gymnasium
Classroom Bldg A
Classroom Bldg. B
Classroom Bldg. A
Gunn High SchoolGunn High School
D e e m s L e w i s M c K i n l e y
2
Classroom Building ‘A’: Math and English
•Two-story building of approximately 40 850 SF (current trend)Two story building of approximately 40,850 SF (current trend)
37,850 SF (9/22/09)
•Added one lab space to each floor in lieu of having an oversized, flexible
l h fl Th t t l l t i 14 hclassroom on each floor. The total classroom count remains 14 on each
floor.
•Air conditioning included in new building
•Two departmental and four FSC meetings to review and discuss plan layout
as well as three coordination meetings with IT and Facilities Maintenance
Gunn High School
D e e m s L e w i s M c K i n l e y
22 Sept 2009 12 Jan 201022 Sept 2009 12 Dec 2010
Gunn High School
D e e m s L e w i s M c K i n l e y
English Dept First Floor
3
22 Sept 2009 12 Jan 2010
Gunn High School
D e e m s L e w i s M c K i n l e y
Math Dept Second Floor
22 Sept 2009
Gunn High SchoolGunn High School
D e e m s L e w i s M c K i n l e y 12 Jan 2010
4
22 Sept 2009
Gunn High SchoolGunn High School
D e e m s L e w i s M c K i n l e y 12 Jan 2010
22 Sept 2009
Gunn High School 12 Jan 2010
View from amphitheaterGunn High School
D e e m s L e w i s M c K i n l e y
12 Jan 2010View from amphitheater
5
View from parking across amphitheater
Gunn High SchoolGunn High School
D e e m s L e w i s M c K i n l e y
Gunn High SchoolGunn High School
D e e m s L e w i s M c K i n l e y
6
Project Milestones: Classroom Building A
Schematic Design Approval:26 January 2010Schematic Design Approval: 26 January 2010
Design Development Phase: January 2010 - March 2010
Construction Documents Phase: March 2010 - June 2010
DSA R i P i d J2010Fb 2011DSA Review Period:June 2010 –February 2011
Bid / Award Phase:March 2011 - May 2011
Construction:June 2011 – June 2013
BUDGET:$14,040,000
COST ESTIMATE:$13,536,920
ESTIMATED CHPS POINTS: 30 – 45 (25 minimum)
Gunn High School
D e e m s L e w i s M c K i n l e y
Classroom Building ‘B’: World Languages
•Single-story building of approximately 6 650 SF (current trend)Single story building of approximately 6,650 SF (current trend)
6,600 SF (6/23/09)
•Created IS workstation and increased workroom, more defined office and
resource area
•Air conditioning included in new building
•One departmental and four FSC meetings to review and discuss plan layout
Gunn High School
D e e m s L e w i s M c K i n l e y
7
22 Sept 2009
Gunn High SchoolGunn High School
D e e m s L e w i s M c K i n l e y 12 Jan 2010
22 Sept 2009
Gunn High School 12 Jan 2010
View from Arastradero RoadGunn High School
D e e m s L e w i s M c K i n l e y
12 Jan 2010View from Arastradero Road
8
View from Arastradero Road
S l d ti f i ti b ildi•Scale and proportion of existing buildings
• Rhythm of columns and vertical features
• Sun shading system at glass areas
Gunn High SchoolGunn High School
D e e m s L e w i s M c K i n l e y
View from Library
Gunn High SchoolGunn High School
D e e m s L e w i s M c K i n l e y View from Science Building
9
Gunn High SchoolGunn High School
D e e m s L e w i s M c K i n l e y
Project Milestones: Classroom Building B
Schematic Design Approval:January 2010Schematic Design Approval: January 2010
Design Development Phase: January 2010 - March 2010
Construction Documents Phase: April 2010 - June 2010
DSA R i P i d J 2010 Fb 2011DSA Review Period:June 2010 -February 2011
Bid / Award Phase:March 2011 – May 2011
Construction:June 2011 - June 2012
BUDGET:$2,760,000
COST ESTIMATE:$2,858,870
ESTIMATED CHPS POINTS: 30 – 45 (25 minimum)
Gunn High School
D e e m s L e w i s M c K i n l e y
10
Gymnasium
•Single-story building of approximately 20,260 SF (current trend)
20 400 SF (9/22/09)20,400 SF (9/22/09)
•Move weight and fitness room to new gymnasium in lieu of wrestling
•Wrestling will occupy converted space in existing gym by combining the
i ti tli d d i t lexisting wrestling and dance space into one large space
•Remove and replace one side with new set of bleachers in the existing gym
in lieu of leaving both sides as is.
•Covered connection to existing gymnasium
•Three departmental and four FSC meetings to review and discuss plan layout
Gunn High School
D e e m s L e w i s M c K i n l e y
22 Sept 2009
G nn High SchoolGunn High School
D e e m s L e w i s M c K i n l e y
12 Jan 2010
11
Modernization Scope
• Remove and replace existing wood floor
•Replace light fixturespg
• Remove bleachers and replace new at one side
• Reconfigure existing wrestling/dance room
• Convert existing weight room to classrooms
• Provide wind/rain screen at south entry
WIND/RAIN SCREEN
Gunn High School
Modernization at Existing Gymnasium
Gunn High School
D e e m s L e w i s M c K i n l e y
22 Sept 200922 Sept 2009
Gunn High School
12 Jan 2010View from parkingGunn High School
D e e m s L e w i s M c K i n l e y
12 Jan 2010View from parking
12
• Natural lighting through clerestory windows
• Translucent fiberglass panels to diffuse light
Ttttkffllihtdi
Gunn High School
•Truss structure to make roof feel light and airy
• Covered connection to existing gym
Gunn High School
D e e m s L e w i s M c K i n l e y
• Glass entry lobby
• Covered entry / arrival
• Exterior sun shading devices
•Translucent fiberglass panels•Translucent fiberglass panels
Gunn High SchoolGunn High School
D e e m s L e w i s M c K i n l e y
13
Gunn High SchoolGunn High School
D e e m s L e w i s M c K i n l e y
Project Milestones: Gymnasium
Schematic Design Approval:26 January 2010Schematic Design Approval: 26 January 2010
Design Development Phase: January 2010 - March 2010
Construction Documents Phase: April 2010 - June 2010
DSA R i P i d J 2010 F b 2011DSA Review Period:June 2010 –February 2011
Bid / Award Phase:March 2010 – May 2011
Construction:June 2011 – November 2012
BUDGET:$ 9,950,000
COST ESTIMATE:$ 9,892,813
ESTIMATED CHPS POINTS: 30 – 45 (25 minimum)
Gunn High School
D e e m s L e w i s M c K i n l e y
14
CHPS V ifi d P j t
Targeted Points: 30-45
(25 points minimum)
CHPS Verified Project
Sustainable Design and Strategies
Sustainable Sites
Water
Energy
Materials
Reduce bldg. footprint, bicycles, water run off
Conservation, low flow fixtures, efficiencies
HVAC systems, energy mgmt
High recycle content construction waste mgmtMaterials
Indoor Environmental Quality
High recycle content, construction waste mgmt
Daylighting, ventilation/filtration, acoustics
Gunn High School
D e e m s L e w i s M c K i n l e y
Next Steps:
•Schematic Design Phase approval by Board of Education in January 2010Schematic Design Phase approval by Board of Education in January 2010
•Submit documents to DSA in June 2010
•Commence building construction of Math/English, World Languages and
G i i S i /S 2011Gymnasium in Spring/Summer 2011
•Continue working through the CEQA process and mitigation measures
•Continue working through the Landscape Master Plan to compliment the
Facilities Master Plan
Gunn High School
D e e m s L e w i s M c K i n l e y
15
A R C H I T E C T U R E
16