Loading...
Planning & Design Meetings Meeting #9 3/4/2009 - PresentationGUNN HIGH SCHOOLG U N N H I G H S C H O O L M A S T E R P L A N Palo Alto Unified School District4 March 2009DLMDLMA R C H I T E C T U R E Master Plan Project Groupings:CONSIDERSATIONSCONSIDERSATIONS• Projects currently under construction such as aquatic center• Project that will happen regardless of priority list such as interim housing• Projects that are a high priority to the school as classroom space• Projects grouped together for construction sequences such as those in the same areaGunn High School Master PlanD e e m s L e w i s M c K i n l e y Master Plan: Project ListPreliminary(project cost w/escalation)1Interim Housing$ 0 94m1.Interim Housing$ 0.94m2. Aquatic Center $ 5.013. Industrial Arts Renovation $ 5.524Cl B ildiA(tt)$19 494.Classroom Building -A (two-story)$19.495. Classroom Building –B (one-story) $ 3.836. New Gym and Lobby at Existing Gym $11.667. Modernization of Existing Gym $ 2.178. Parking and Drop-off Improvements $ 4.929. Utilities and Infrastructure $ 0.6610. Student Activities / Media Arts / Conference Center $12.0711. Special Education Center $ 1.21Gunn High School Master PlanGunn High School Master PlanD e e m s L e w i s M c K i n l e y Master Plan: Project ListPreliminary(project cost w/escalation)11Science Labs and Support Facilities$32611.Science Labs and Support Facilities $ 3.2612. Classroom Building Modernization L-wing $ 2.6513. Parking and Drop-off Improvements $ 5.1614Utiliti d I f t t U d$06914.Utilities and Infrastructure Upgrades$ 0.6915. Performing Arts Building $ 9.8516. Spangenberg Modernization $ 6.8817. Spangenberg Lobby and Upgrades $ 3.3818. Amphitheater Improvements $ 0.7219. Art Building Addition and Modernization $ 7.4020. West Access Road and Parking Improvements $ 1.22Gunn High School Master PlanD e e m s L e w i s M c K i n l e y Master Plan: Project ListPreliminary(project cost w/escalation)21Entry Court and Entry Structure$12821.Entry Court and Entry Structure$ 1.2822. Guidance and Counseling Center-AD2 $ 3.0023. Admin Expansion and Remodel-AD1 $ 4.8824QdI t$26324.Quad Improvements$ 2.6325. Field Structures for Athletics $ 2.4226. Miscellaneous Site Improvements $ 2.7327. Demolition of Existing RC Building $ 0.1128. OtherTOTAL $125.72 mGunn High School Master PlanD e e m s L e w i s M c K i n l e y Master Plan Groups:Preliminaryproject cumulative0 Aquatic Center IABldg Interim Housing$11 470. Aquatic Center, IA Bldg, Interim Housing$11.471. Classroom Buildings A and B, Gymnasium,Gymnasium Mod, Parking and Drop-off $42.73 $54.202St d tA ti iti /M di A t S i l Ed C t2.Student Activities/Media Arts, Special Ed. Center, Science Lab, L-wing Mod $25.04 $79.243. Performing Arts Bldg, Spangenberg Lobby and Mod, A-wing Mod, Amphitheater Upgrades $29.45 $108.694. Admin Addition and Remodel, Guidance andCounseling Center, Entry Court and Structure $ 9.16 $117.855. Quad, Demo of RC Bldg, Site Improvements $ 7.89 $125.74and Field Structures for AthleticsTOTAL$125 74Gunn High School Master PlanTOTAL$125.74Gunn High School Master PlanD e e m s L e w i s M c K i n l e y Next Steps:•Prioritization and phasingPrioritization and phasing• Implementation and scheduling• Finalize documentation• Approval by Board of Education• Authorization to commence projectsGunn High School Master PlanD e e m s L e w i s M c K i n l e y A R C H I T E C T U R E