Loading...
Planning & Design Meetings Neighborhood Meeting 4/26/2010 - PresentationPALO ALTO UNIFIED SCHOOL DISTRICTCommunity Meeting #1Community Meeting #1PRESENTATION FOR:J.L. STANFORD MIDDLE SCHOOLSchematic DesignApril 26, 2010A E D I SA R C H I T E C T U R E & P L A N N I N GP A L O A L T O U N I F I E D S C H O O L D I S T R I C TA E D I S A R C H I T E C T U R E & P L A N N I N G1 Proposed Site PlanNA E D I SA R C H I T E C T U R E & P L A N N I N GA E D I SA R C H I T E C T U R E & P L A N N I N G2 NClNew Classroom Wing and Proposed Student Courtyard- Student Courtyard.- Relocated Basketball courts.- New bicycle cage yg(capacity: 20 bikes)and bicycle path from Mitchell Park.- Exist. Soccer field reduced lengthfrom 330’ to 285’.U12 regulation size is 300’A E D I SA R C H I T E C T U R E & P L A N N I N GA E D I SA R C H I T E C T U R E & P L A N N I N G300.3 PdStdtProposed Student Courtyard at New Classroom Wingg- Permeable paving.- Terraced concrete ti ith tdseating with outdoor stage.- sloped no-mow plantingA E D I SA R C H I T E C T U R E & P L A N N I N GA E D I SA R C H I T E C T U R E & P L A N N I N G- Raised concrete seatwall/planter4 Proposed Plant Palette and Pavers OptionsLarge Canopy TreeFlowering Accent TreeCMtlLarge Canopy TreeTreeChinese PistacheCarpe MyrtleTreeChinese ElmEstate paverA E D I SA R C H I T E C T U R E & P L A N N I N GArizona paverEstate paverAshlar state patternHerringbonepattern5 Proposed New Wing- Four (4) classrooms.- Conference and storage rooms with laptop cart recharge station.- Student and staff Restrooms.- Custodian, electrical ,and mechanical rooms.- New lockers at covered walkways.A E D I SA R C H I T E C T U R E & P L A N N I N G1stFloorA E D I SA R C H I T E C T U R E & P L A N N I N G6 Proposed New Wing-Six (6) classrooms-Six (6) classrooms.- New lockers at covered walkways.A E D I SA R C H I T E C T U R E & P L A N N I N G2ndFloorA E D I SA R C H I T E C T U R E & P L A N N I N G7 Context- Sloped roofs- Accent trimsThi l-Thin columnsA E D I SA R C H I T E C T U R E & P L A N N I N G8 Context- Window proportion- Clerestories- High ceilingsA E D I SA R C H I T E C T U R E & P L A N N I N G9 Proposed New WingA E D I SA R C H I T E C T U R E & P L A N N I N GA E D I SA R C H I T E C T U R E & P L A N N I N G10 Proposed New WingA E D I SA R C H I T E C T U R E & P L A N N I N GA E D I SA R C H I T E C T U R E & P L A N N I N G11 Proposed New WingA E D I SA R C H I T E C T U R E & P L A N N I N GView from the courtyard12 Proposed New WingA E D I SA R C H I T E C T U R E & P L A N N I N GView from athletic fields13 CHPS Verified ProjectTargeted Points 35-45(25 minimum)(25 minimum)Sustainable Design StrategiesSustainable Sites Limit stormwater run-offLight pollution ReductionLight pollution ReductionReduced Heat Island (cool roofs)Water Reduced use Low flow fixturesIrrig. commissioning plan Energy Energy PerformanceEfficient envelopeEMSEMSMaterialsConstruction site waste MgmtRecycled ContentEnvironmentally preferred matsEnvironmentally preferred mats.Indoor Environ. DaylightingQuality Flexible classroom lightingEnhanced HV filtrationA E D I SA R C H I T E C T U R E & P L A N N I N GLow-emitting matsOperable windowsImproved Acoustical Performance14 Teachers Resource CenterExisting- Lockable computer carts storage and recharging stationwork area and computer deskA E D I SA R C H I T E C T U R E & P L A N N I N GProposed-work area and computer desk- cabinets and open shelving15 Classroom wingsExistingProposed-Access to-Interactive white-Tankless instantWindowNew 350 SFA E D I SA R C H I T E C T U R E & P L A N N I N GAccess to department storage rooms from breezewayInteractive white boards and Voice Amplification SystemTankless instant water heaters at all classroom sinks.-Window coverings -New 350 SF storage room at the end of 200 wing16 600 wing - ScienceExisting- Convert two classrooms to science labsscience labs- Thermal comfort upgradesProposedA E D I SA R C H I T E C T U R E & P L A N N I N GA E D I SA R C H I T E C T U R E & P L A N N I N G17 700 wing-Two (2) new testing roomsProposedExistingA E D I SA R C H I T E C T U R E & P L A N N I N GA E D I SA R C H I T E C T U R E & P L A N N I N GTwo (2) new testing rooms - New lockable storage in flex room 18 900 wingExisting Floor PlanA E D I SA R C H I T E C T U R E & P L A N N I N GA E D I SA R C H I T E C T U R E & P L A N N I N G19 900 wingNew Floor Plan- Expanded Exercise Room with new flooring.- Expanded Locker Rooms for additional lockers- Heating and ventilationupgradesNew Floor PlanA E D I SA R C H I T E C T U R E & P L A N N I N GA E D I SA R C H I T E C T U R E & P L A N N I N G- New large storage and new storage rooms - Replaced windows and new windows in lieu of louvers20 ProposedLandscapein BetweenClassroom Wings- Expand corridors width- Outdoor teaching areas- Landscaped areas:Low shrub massingMedium shrub massingTall shrub massingTall shrub massing- Seating areas- Memorial GardenA E D I SA R C H I T E C T U R E & P L A N N I N GA E D I SA R C H I T E C T U R E & P L A N N I N G21 Proposed Landscape in Between Classroom Wings-New hardscape atNew hardscape at current foot traffic- Removed guardrails and new seating areas. gAlong breezeway.- New trees with low, medium and tall shrub imassingA E D I SA R C H I T E C T U R E & P L A N N I N GA E D I SA R C H I T E C T U R E & P L A N N I N G22 Proposed Landscape in Between Classroom Wingsoutdoor teaching areas-- New memorial garden and seating area.- Outdoor teaching area in between 200 wing and Computer Classroom.- New 350 SF storage room at the end of 200 wing. A E D I SA R C H I T E C T U R E & P L A N N I N G23 Project Milestonesj• Approval of Schematic Design May 2010 • Design Development Phase May 2010 –Aug 2010 • Construction Document Phase Aug 2010 – Nov 2010 • DSA Review Nov 2010 – July 2011 Bid & A d PhJ l 2011A 2011•Bid & Award Phase July 2011 –Aug 2011 • Construction Aug 2011 – May 2013 *General Timeframe OnlyGeneral Timeframe Only.A E D I SA R C H I T E C T U R E & P L A N N I N G24