Loading...
Planning & Design Meetings Design Meeting #1p –Wing 900 Modernization 12/9/2009 - MinutesPage 1 of 2 A E D I S Architecture & Planning Meeting Notes 1494 Hamilton Avenue, San Jose, CA 95125 408.264.2000 – Fax 408.264.2500 PROJECT: JL Stanford Middle School Modernization & New Construction DATE: 12/09/09 MEETING: Design Meeting #1p –Wing 900 Modernization PLACE: Conf Rm B PE Department PROJECT NO: 29034.00 TIME: 2:00 pm ATTENDEES: Brauman Creightom (PE Teacher) Sharon Ofek (JLS Admin) Amanda Holmquist (PE Teacher) Chris Grierson (JLS Admin) Ericka Berkson (PE Teacher) Lori Alvarez (OCM) David DeAmicis (PE Teacher) Todd Walter (AEDIS Principal) Selena Reed (PE Teacher) Mariana Alvarez-Parga (AEDIS) Ryan Fletcher ((JLS Admin) Item # Notes 1.1 Schedule Jordan SD set Update to PAUSD Board January 2010 Terman SD set Update to PAUSD Board February 2010 JL Stanford SD set Update to PAUSD Board March 2010 1.2 Exercise Room 903 a. Needs to be enlarged. Since Dance Room is too small, it is preferred to combine these two spaces into a large one. b. AEDIS to develop Option 1: Combine rooms assuming it is structural feasible. A storage space still needs to be provided at one end of the room; and, Option 2: remove storage room #902 to add square footage to Room 903 and convert the classroom or the Dance Room into a central storage. This new storage space should have access from outside for outdoor equipment. c. Replace louvered opening with operable windows and shade control. d. Confirm size of Rooms 901 and 904. 1.3 Boys Locker Room a. Improve ventilation in restroom area b. Power in Men’s office c. New epoxy floor d. Add 65 lockers (from 506 to 571). If needed, storage space could be opened to the locker room to place additional lockers. This space could be moved to the north-east corner of building. e. Add privacy wall 1.4 Girls Locker Room a. Improve ventilation in restroom area b. Power in Men’s office c. New epoxy floor d. Add 61 lockers (from 468 to 529) PROJECT: JL Stanford Middle School Modernization & New Construction DATE: 12/09/09 MEETING: Design Mtg #1p – PE Department PROJECT NO: 29034.00 Page 2 of 2 1.5 Basketball courts a. There are currently two full size basketball courts and one half-size. b. New building placement Option 2 is preferred with four full size courts in the same orientation. c. With the placement of the new building, the emergency storage would be relocated. 1.6 Next Steps a. Bond Advisory Committee Meeting on Tuesday 12/16 at 3:15 pm. End of Meeting Notes This information is the understanding of AEDIS Architecture & Planning of the various items discussed and agreed upon during the meeting. Please contact the writer within five (5) days if there are any revisions and/or additions necessary to these meeting minutes. REF.REF. 111 SF UTILITY 906 45 SF VESTIBULE 907 77 SF ELECTRICAL 908 258 SF P.E. STORAGE 909 77 SF WOMENS TOILET 910 65 SF WOMENS VESTIBULE 912 235 SF WOMENS P.E. OFFICE 913 205 SF WOMENS P.E. OFFICE 914 90 SF EQUIPMENT ROOM 918 175 SF EQUIPMENT ROOM 917 487 SF MECHANICAL 919 90 SF EQUIPMENT ROOM 921 181 SF EQUIPMENT ROOM 920 232 SF MENS P.E. OFFICE 923 77 SF MENS TOILET 924 65 SF MENS VESTIBULE 925 112 SF P.E. STORAGE 926 230 SF P.E. STORAGE 927 45 SF VESTIBULE 928 79 SF JANITOR 929 1928 SF GIRLS LOCKER RM 905 275 SF JANITOR LOUNGE 904 1629 SF WEIGHTLIFTING PING - PONG 903 184 SF EQUIPMENT ROOM 902 721 SF CLASSROOM 901 8118 SF CLASSROOM 900 135 SF GIRLS VESTIBULE 915 193 SF GIRLS TOILET 916 716 SF CLASSROOM 934 190 SF BOYS TOILET 932 133 SF BOYS VESTIBULE 931 275 SF STORAGE 933 1928 SF BOYS LOCKER RM 930 1629 SF WRESTLING / AEROBIC 936 184 SF EQUIPMENT ROOM 93531' - 5"1' - 0"16' - 6"19' - 9"13' - 0"6' - 4"9' - 8"9' - 7"7' - 0"12' - 5"9' - 9 3/4"13' - 1"16' - 11 1/4"17' - 4 1/2"7' - 8 1/2"18' - 9"30' - 10 1/4"18' - 9 3/4"7' - 6 1/16"16' - 9 3/16"13' - 1"9' - 9 3/4"19' - 5"9' - 7"7' - 1"8' - 11"81' - 8"270' - 6" A E D I S A R C H I T E C T U R E & P L A N N I N G JL STANFORD MIDDLE SCHOOL MODERNIZATION AND NEW CONSTRUCTION SCHEMATIC DESIGN 12/09/09 PALO ALTO UNIFIED SCHOOL DISTRICT BICYCLE PARKING AC SWIMMING POOL SHACK CONC CLASSROOM 1-STORY TEMPORARY CLASSROOM 1-STORY 9'CLF6'CLF 9'CLF 9'CLF 6'CLF6'CLF4'CLF6'CLF 4'CLF 4'CLF TRENCH PATCH TANBARK20 BICYCLE PARKING AC SWIMMING POOL SHACK CONC CLASSROOM 1-STORY TEMPORARY CLASSROOM 1-STORY 9'CLF6'CLF6'CLF9'CL 9'CLF 6'CLF6'CLF4'CLF6'CLF 4'CLF 4'CLF TRENCH PATCH TANBARK20 BICYCLE PARKING AC SWIMMING POOL SHACK CONC CLASSROOM 1-STORY TEMPORARY CLASSROOM 1-STORY 9'CLF6'CLF 9'CLF 9'CLF 6'CLF6'CLF4'CLF6'CLF 4'CLF 4'CLF TRENCH PATCH TANBARK20 20' - 0"11' - 7 1/2"3 4 5 6 1 2 RESTROOMS RESTROOMS ELEV6' - 0"7 8 9 10 CONFERENCEROOM ELEV SECOND FLOOR FIRST FLOOR 120' - 0"(E) BUILDING(E) BUILDING (E) BUILDING(E) BUILDINGE.R.ELEC 2 1 ' - 4 " ELEV 1 2 3 4 5 RE S TRO OM S 6 7 8 9 10 CO NF E RENCE ROOM REST ROOM S FIRST FLOOR SECOND FLOOR 10' - 3"60' - 0"120' - 0"(E) BUILDING(E) BUILDING (E) BUILDING(E) BUILDINGMEC H E L E C E.R. ELEV 20' - 0" ELEVE.R. 1 2 6543 FIRST FLOOR ELEV 10987 SECOND FLOOR RESTROOMS RESTROOMS CONFERENCE ROOM (E) BUILDING(E) BUILDING (E) BUILDING(E) BUILDING120' - 0"47' - 0"74' - 4"ELEC 16' - 8" 16' - 8" A E D I S A R C H I T E C T U R E & P L A N N I N G JL STANFORD MIDDLE SCHOOL MODERNIZATION AND NEW CONSTRUCTION SCHEMATIC DESIGN 11/23/09 PALO ALTO UNIFIED SCHOOL DISTRICT SCALE 1" = 30'-0" OPTION 1 SCALE 1" = 30'-0" OPTION 2 SCALE 1" = 30'-0" OPTION 3 N