Planning & Design Meetings Terman Schematic Design BOE Presentation 5/11/2010 - PresentationPALO ALTO UNIFIED SCHOOL DISTRICTBOARD OF EDUCATIONBOARD OF EDUCATIONPRESENTATION FOR:TERMAN MIDDLE SCHOOLSchematic DesignMay 11, 2010A E D I SA R C H I T E C T U R E & P L A N N I N GP A L O A L T O U N I F I E D S C H O O L D I S T R I C TA E D I S A R C H I T E C T U R E & P L A N N I N G1 Proposed Site PlanA E D I SA R C H I T E C T U R E & P L A N N I N GA E D I SA R C H I T E C T U R E & P L A N N I N G2 (E) BIKE CAGE5 (E) PARKING 5 (E) PRKGSTALLSSTALLSSTALLS7 (E) PARKING STALLS3 (E) PARKING STALLS3 (E) PRKGSTALLS(E) VISITORS()ACCESS TOADMINISTRATIONA E D I SA R C H I T E C T U R E & P L A N N I N GA wingExisting Floor PlanA E D I SA R C H I T E C T U R E & P L A N N I N G3 5 (E) PARKING 5 (E) PRKGSTALLSSTALLS(E) BIKE CAGE7 (E) PARKING STALLS3 (E) PRKGSTALLSA E D I SA R C H I T E C T U R E & P L A N N I N GA wingProposed Floor PlanA E D I SA R C H I T E C T U R E & P L A N N I N G4 CONTEXTFront of SchoolLibrary at Front of School with entrance on the side.A E D I SA R C H I T E C T U R E & P L A N N I N G5 CONTEXTColor Palette- Sage at Admin and Library building-Yellow at CafetoriumYellow at Cafetorium- Off-white at Classroom wingsOpeningspgA E D I SA R C H I T E C T U R E & P L A N N I N GA E D I S A R C H I T E C T U R E & P L A N N I N G6 Proposed A wing expansionA E D I SA R C H I T E C T U R E & P L A N N I N G7 Proposed A wing expansionA E D I SA R C H I T E C T U R E & P L A N N I N G8 Proposed Entry addition tonew Administration AreaA E D I SA R C H I T E C T U R E & P L A N N I N GA E D I S A R C H I T E C T U R E & P L A N N I N G9 Proposed Entry addition tonew Administration AreaA E D I SA R C H I T E C T U R E & P L A N N I N GA E D I S A R C H I T E C T U R E & P L A N N I N G10 A E D I SA R C H I T E C T U R E & P L A N N I N GProposed New LibraryA E D I S A R C H I T E C T U R E & P L A N N I N G11 A E D I SA R C H I T E C T U R E & P L A N N I N GProposed New LibraryA E D I S A R C H I T E C T U R E & P L A N N I N G12 C wingNew Drama Classroom AdditionEiti Fl PlPdFlPlA E D I SA R C H I T E C T U R E & P L A N N I N GExisting Floor PlanProposed Floor Plan13 Proposed New Drama ClassroomA E D I SA R C H I T E C T U R E & P L A N N I N G14 A E D I SA R C H I T E C T U R E & P L A N N I N GProposed New Drama ClassroomA E D I S A R C H I T E C T U R E & P L A N N I N G15 B wingKitchen area, Teachers’ Lounge and StorageA E D I SA R C H I T E C T U R E & P L A N N I N GExisting Floor PlanProposed Floor Plan16 D wing – Partial RemodelAdditionalAdditional185 SF atFitness RoomA E D I SA R C H I T E C T U R E & P L A N N I N GA E D I SA R C H I T E C T U R E & P L A N N I N GExisting Floor PlanProposed Floor Plan17 G wing – New Computer Classroom & LabExisting Floor PlanA E D I SA R C H I T E C T U R E & P L A N N I N GA E D I SA R C H I T E C T U R E & P L A N N I N GProposed Floor Plan18 Other ImprovementsIn all classrooms:I ll d llIn all classrooms:- Abandon radiant floor heating and install new individual furnaces in exterior closets.-Add 8’ counter top with cabinets.Install dust collectorVentilation & hti A E D I SA R C H I T E C T U R E & P L A N N I N GA E D I SA R C H I T E C T U R E & P L A N N I N G-Electrical upgrades-Window treatment-Seismic upgrades (add shear walls)Re-grade area for Drainage improvementsheating improvements19 Project Milestones• Approval of Schematic Design May 2010 • Design Development Phase May 2010 –Aug 2010 • Construction Document Phase Aug 2010 – Nov 2010 • DSA Review Nov 2010 – July 2011 Bid & A d PhJ l 2011A 2011•Bid & Award Phase July 2011 –Aug 2011 • Construction Aug 2011 – May 2013 *General Timeframe OnlyGeneral Timeframe Only.•CostEstimated Construction Cost$8,257,117Estimated Construction Cost$8,257,117Construction Budget Allocation$8,986,173A E D I SA R C H I T E C T U R E & P L A N N I N G20