Planning & Design Meetings Jordan Neighborhood Meeting #1 3/16/2010 - PresentationPALO ALTO UNIFIED SCHOOL DISTRICTCommunity MeetingCommunity MeetingPRESENTATION FOR:DAVID STARR JORDAN MIDDLE SCHOOLSchematic DesignMarch 23, 2010A E D I SA R C H I T E C T U R E & P L A N N I N GP A L O A L T O U N I F I E D S C H O O L D I S T R I C TA E D I S A R C H I T E C T U R E & P L A N N I N G1
Jordan M.S. - Existing Campus750 N. California AveGYMNASIUMMUSICMIDDLEFIELDPKG LOTFIELDSINDUSTRIAL ARTSLIBRARYCLASSROOM WINGSCLASSROOM WINGSSCIENCE CLASSROOMSCAFETORIUMCLASSROOM WINGSCLASSROOM WINGSCLASSROOM WINGSA E D I SA R C H I T E C T U R E & P L A N N I N GADMINISTRATION OFFICECALIFORNIA AVE PKG LOT2
Proposed Site Plan20 stalls4 stallsDrainageN41 t ll41stalls11 stalls5 stallsA E D I SA R C H I T E C T U R E & P L A N N I N GParking configuration90 (E) parking spaces81 Proposed spaces3
N WING – Proposed Site Plan(N) TREESDROP OFF LANE(N) TREESSHADE STRUCTUREand (E) TREES TO REMAINBENCHESA E D I SA R C H I T E C T U R E & P L A N N I N GA E D I SA R C H I T E C T U R E & P L A N N I N G4
N WING – Proposed New Classroom WingNew Classroom Wing7,600 SFA E D I SA R C H I T E C T U R E & P L A N N I N GSix (6) classroomsConference RoomStudents Restrooms5
Proposed N WING – 3D viewA E D I SA R C H I T E C T U R E & P L A N N I N G6
Proposed N WING – 3D ViewA E D I SA R C H I T E C T U R E & P L A N N I N G7
CHPS Verified ProjectTargeted Points 35-45(25 minimum)(25 minimum)Sustainable Design StrategiesSustainable Sites Limit stormwater run-offLight pollution ReductionLight pollution ReductionReduced Heat Island (cool roofs)Water Reduced use Low flow fixturesIrrig. commissioning plan Energy Energy PerformanceEfficient envelopeEMSEMSMaterials Construction site waste MgmtRecycled ContentEnvironmentally preferred matsEnvironmentally preferred mats.Indoor Environ. DaylightingQuality Flexible classroom lightingEnhanced HV filtrationA E D I SA R C H I T E C T U R E & P L A N N I N GLow-emitting matsOperable windowsImproved Acoustical Performance8
G WING – Science BuildingExisting Floor PlanProposed Floor PlanA E D I SA R C H I T E C T U R E & P L A N N I N GTwo (2) new Science labs (1,290 SF each) - Fixed Lab stations.Remodeled Prep rooms with Emergency shower and fume hood.Thermal Comfort Upgrades: New HVAC units and cool roof coating9
G WING – Science BuildingA E D I SA R C H I T E C T U R E & P L A N N I N G10
M WING – New Art RoomsExisting Floor PlanProposed Floor Plan3D art studio 1 173 SFA E D I SA R C H I T E C T U R E & P L A N N I N G3D art studio 1,173 SF2D art studio 1,041 SFEnlarged Office and Storage space11
M WING – New Art RoomsA E D I SA R C H I T E C T U R E & P L A N N I N G12
J,K & C WINGS – Thermal Comfort UpgradesCWing 8400SFJ&K Wi 21 350 SFC Wing 8,400 SFNew individual room HV unitsNew custodial roomNew cool roof coatingJ&K Wings 21,350 SFNew HVAC system (split system)New exhaust fansA E D I SA R C H I T E C T U R E & P L A N N I N G13
H WING – Thermal Comfort UpgradesH Wing 10,156 SFImprove envelope performanceReplace windows with dual pane, low-E glazingBlow-In insulation at wallsRemove SkylightsCool Roof CoatingBatt Insulation R30Improve ventilationA E D I SA R C H I T E C T U R E & P L A N N I N GAdd exhaust fans14
L WING – Existing CafetoriumExisting Floor PlanA E D I SA R C H I T E C T U R E & P L A N N I N GRemodel existing 3,180 SF cafetorium spaceRemove existing wood structure stage 1,180 SF15
L WING – Proposed New MU BuildingProposed Floor PlanProposed Floor PlanA E D I SA R C H I T E C T U R E & P L A N N I N GNew 4,300 SF Multi-use room (existing 3,180 SF)New 1,800 SF Stage (existing 1,180 SF)Relocated music classrooms adjacent to auditorium allowing for more space and practice roomsStorage rooms for drama, PE and MU.16
L WING – Proposed New MU BuildingA E D I SA R C H I T E C T U R E & P L A N N I N GN. CALIFORNIA AVENEWELL RD17
L WING – Proposed Massing StudiesStudy #1Study #2A E D I SA R C H I T E C T U R E & P L A N N I N G18
L WING – Proposed Massing StudiesStudy #1A E D I SA R C H I T E C T U R E & P L A N N I N GStudy #219
L WING – Proposed Massing StudiesStudy #1A E D I SA R C H I T E C T U R E & P L A N N I N GStudy #2Study #220
New MU Building - CHPS Verified ProjectTargeted Points 35-45(25 minimum)(25 minimum)Sustainable Design StrategiesSustainable Sites Limit stormwater run-offLight pollution ReductionWtIi ti i i i lWaterIrrigation commissioning plan Energy Energy PerformanceEfficient envelopeEMSEMSMaterials Construction site waste MgmtBuilding ReuseRecycled ContentyEnvironmentally preferred mats.Indoor Environ. DaylightingQuality Enhanced HV filtrationA E D I SA R C H I T E C T U R E & P L A N N I N GLow-emitting mats21
D Wing – GymnasiumGymnasium New athletic wood floor (6,400 SF) Locker RoomsAdditional lockersA E D I SA R C H I T E C T U R E & P L A N N I N Ge a e c ood oo (6, 00 S )Seismic upgrade: reinforce roof diaphragmNew cool roofNew windowsADA benchPrivacy walls22
Seismic UpgradesA E D I SA R C H I T E C T U R E & P L A N N I N G23
Seismic Upgrades – Typical at A, B, E, F and HA E D I SA R C H I T E C T U R E & P L A N N I N GAdditional Shear wall (fill in some windows)24