Planning & Design Meetings Design Mtg # 2a 10/8/2009 - Minutes A E D I S Architecture & Planning Meeting Notes 1494 Hamilton Avenue, San Jose, CA 95125 408.264.2000 – Fax 408.264.2500 PROJECT: Jordan Middle School Modernization & New Construction DATE: 10/08/09 MEETING: Design Mtg # 2a PLACE: JMS PROJECT NO: 29035.00 TIME: 3:15 pm ATTENDEES: Michael Milliken (Principal at Jordan MS) Terry Noeth (Science Teacher) Sharon Ferguson (District Art Coordinator) Tami Warr (Science Teacher) Paul Gralen (Art Teacher) Lori Alvarez, (OCM) David Brigham (Music Teacher) Todd Walter, (AEDIS Principal) Vivian Boureaux (Music Teacher) Mariana Alvarez-Parga (AEDIS) Mark Ginanm (PE Teacher) Wendy Woo (AEDIS) ATTACHMENTS: Item # Notes 2a.1 G wing - Science a. Option 1b is preferred with 36”-wide peripheral tables, entry door on the side of the teaching area and central open space for lecture layout. b. Teaching wall is a necessary item. c. If possible, teacher’s desk should be a separate area. Due to circulation needs (door locations) it might be placed in line with the demonstration table. d. Two schemes will be developed, one showing cabinets with fixed students stations and another with movable stations. e. There could be upper cabinets on two entire walls. f. Show Prep room with emergency shower and fume hood. g. A narrative describing a proposed ventilation system will be sent to the District for their consideration. 2a.2 M wing - Art a. The 3D studio should have space for 7 tables and a teacher’s desk. b. Electrical capabilities will decide if the 3D studio moves into M1 or M2. c. In order to avoid taking interior space, the kilns (four total) will be placed on the south outside wall. Verify electrical capabilities for these. The current location of the kilns is in room S2 at the H wing. These will be checked to confirm they could be in an outdoor location. d. The storage room on H wing (S4) could be still dedicated to art, but it would remain as storage and not as kiln room to avoid longer distance to transport the art work. e. 2D studio could be smaller, may be 960 SF. f. Additional storage could be carved from 2D room g. A white wall could be placed on the east wall. h. Linear storage space will be confirmed. i. Acoustical panels will be removed. j. Display area would be available above the drying racks. k. A sink with clay trap would be pace in the west wall, where there is already a sink. It would e nice to have a deep large sink like a troth sink. The one at Gunn High school is a good example. Page 1 of 2 PROJECT: Jordan Middle School Modernization & New Construction DATE: 10/8/09 MEETING: Design Mtg #2A PROJECT NO: 29035.00 2a.3 New Band classrooms a. The classrooms to be placed in the existing cafetorium will be Band Rm #1 and Band Rm #2 with approximately 1500 SF and 960 SF. Band Rm #2 should be capable of sitting 30 to 35 students. b. The office should be placed with visibility and access to both rooms. c. The storage space does not need to be enclosed. It is preferred to have it open to Band Rm #2 where most of the instrument cabinets will be located. d. There is an adjacent room on the side of the kitchen that will be looked into to see if it could be part of Band Rm #2 and provide more storage space. e. Provide a sink in each room. If not possible, at least one should be centrally located. f. 2a.4 New Auditorium a. Verify dimension of existing stage with proposed. If proscenium is smaller, then having a deeper stage is no use. b. The height of the stage is proposed at 30”. This would facilitate sightlines for the front rows and for ADA access, a single run ramp would be sufficient. c. Auditoriums in other Middle schools: I. JLS: Auditorium 4,775 SF, Stage 1,474 SF II. Terman Auditorium 4,928 SF, Stage 1,792 SF III. Jordan: Auditorium 3,600 SF; Stage 900 SF IV. Proposed @ Jordan 4,800 SF, Stage 1,500 SF d. There should be storage for chairs and tables, costumes and propos and for PE. 2a.5 Next Steps a. Site feasibility studies including tennis courts layout will be evaluated by O’Connor Construction, Program Manager and then it will be discussed in a conference call with Michael Milliken. b. Layouts for Science, Art and Music rooms will be emailed to teachers for feedback prior to the next meeting including interior elevations. c. Material regarding the auditorium presented at this meeting will be emailed to the Drama teachers for feedback. End of Meeting Notes This information is the understanding of AEDIS Architecture & Planning of the various items discussed and agreed upon during the meeting. Please contact the writer within five (5) days if there are any revisions and/or additions necessary to these meeting minutes. Page 2 of 2