Loading...
Planning & Design Meetings Terman Pre-Design Meeting #2 5/12/2009 - Minutes A E D I S Architecture & Planning Meeting Notes 1494 Hamilton Avenue, San Jose, CA 95125 408.264.2000 – Fax 408.264.2500 PROJECT: Terman MS Pre-Design DATE: 5/12/09 MEETING: Advisory Committee Mtg #2 PLACE: Terman MS PROJECT NO: 28066.00 TIME: 3:30 pm ATTENDEES: Carmen Giedt, (Terman, Principal) Tom Hodges, (O’Connor Construction) Dede Barnhart (Terman, Librarian) Lori Alvarez, (O’Connor Construction) Todd Walter, (AEDIS) DISTRIBUTION: Attendees AEDIS, File ATTACHMENTS: I. Notes from librarian Item # Notes Action 2.1 Updated utilization plan was reviewed and the following shall be included in the project scope: 1. Existing classrooms H9,H10 and H11 shall remain as (3) classrooms, no need to consolidate them into (2) classrooms. 2. If the existing structural system will allow, K12 and K13 shall be consolidated into a single classroom. 3. If the existing structural system will allow, K9 classroom and video production shall be relocated to one of the new classrooms within the Admin/Library building and the current K9 classroom, production room and storage shall be converted into a single classroom. If this is not possible due to the structural system then K9 as is shall remain in its current location. 2.2 The following outlines the Administration / library building expansion and renovation: 1. Library a. The librarian (Dede) handed out a program document that included space needs, shelving requirements and book capacity. See attached document. b. In addition, it was noted that a key program requirement is to have the library adjacent to the new computer lab. 2. Computer Lab a. Set up this room to include a lab to accommodate 32 students and a resource room that has direct access and supervision to the computer lab. The lab shall PROJECT: Terman Middle School DATE: 5/12/09 MEETING: Advisory Committee Mtg #2 PROJECT NO: 28066.00 Page 2 of 2 closely match the JLS and Jordan computer lab size. b. Direct access to the library is required. 3. Administration a. Space should be located where the current library is located. b. Provide a clear entry point. c. The existing planter area in front of the library is not required to remain. 2.3 Site issues: 1. It was noted that there is a drainage issue between the gymnasium and the “E” wing. 2.4 Gymnasium Issues: 1. Add an epoxy flooring in the boys and girls locker room area to match the shower flooring material. 2. Replace the existing windows / louvers in the gymnasium with new operable windows. 3. Modify the entrance hallway to the gymnasium at the west entrance to eliminate the reception counter area and restroom and re-align the hallway to the existing windows located on the west side of the gym. This will provide space to expand D22 (Fitness room). The new alignment shall include a new restroom. 4. Add a door from the girls PE office directly to the new entry hallway. End of Meeting Notes This information is the understanding of AEDIS Architecture & Planning of the various items discussed and agreed upon during the meeting. Please contact the writer within five (5) days if there are any revisions and/or additions necessary to these meeting minutes.