Loading...
Planning & Design Meetings Duveneck Schematic Design BOE Presentation 6/14/2011 - PresentationDuveneck Elementary School Board Meeting June 14, 2011 Schematic Design June 14, 2011 DUVENECK ELEMENTARY SCHOOL 1 Duveneck Elementary School Board Meeting June 14, 2011 Priorities for Duveneck: -Utilize site area to maximum potential. -Maximize daylighting in new classroom buildings -Provide new exterior courtyard between new library and future multi- use building. -Increase connection to all classrooms. -Provide outdoor activity space. -Maximize sustainable building and site development strategies. -Consider site organization, access, use, and traffic with respect to block. -Improve ventilation in existing buildings and provide fresh air in new buildings. 2 Duveneck Elementary School Board Meeting June 14, 2011 turf kinder play garden LEGEND daycare blacktop redtop kindergarten classrooms library administration multipurpose phase 2 AREA CALCULATIONSredtop - 17,292 sfblacktop - 25,685 sfturf - 44,879 sfkindergarten play - 11,923 sfplay structure - 7,198 sf K 1 1 K 2 2 2 2 3 3 3 3 CRCR 4 4 4 4 DKC DKC K K 5 5 5 5 MPFLEX BIKES BIKESLIBRARYRSPRSP ADMIN CR 1 1 Site Plan 3 Duveneck Elementary School Board Meeting June 14, 2011 Duveneck Elementary School Board Meeting May 24, 2011 K 1 1 K 2 2 2 2 3 3 3 3 CR CR 4 4 4 4 DKC DKC K K 5 5 5 5 MP FLEX LIBRARYRSPRSP ADMIN CR 1 1 turf kinder play garden LEGEND daycare blacktop redtop kindergarten classrooms library administration multipurpose phase 2 AREA CALCULATIONS redtop - 17,292 sfblacktop - 25,685 sfturf - 44,879 sfkindergarten play - 11,923 sfplay structure - 7,198 sf Site Plan Dana Heather Hamilton Alester Alternate Drop off zones No Park or Stop for D/O Crosswalk Bike Parking ~30 each Pedestrian PoT City School Traffic Safety Committee Meeting - May 19, 2011 Vehicular PoT 4 Duveneck Elementary School Board Meeting June 14, 2011 Aerial View 5 Duveneck Elementary School Board Meeting June 14, 2011 Solar Studies Summer Solstice 9am Equinox 9am Summer Solstice 12pm Equinox12pm Summer Solstice 3pm Equinox 3pm 6 Duveneck Elementary School Board Meeting June 14, 2011 North East South West Exterior Elevations: Building 2 (Kindergarten) 7 Duveneck Elementary School Board Meeting June 14, 2011 North East South West Exterior Elevations: Building 3 (1st Grade wing) 8 Duveneck Elementary School Board Meeting June 14, 2011 East West North South West Exterior Elevations: Building 1(4 & 5 Grade wing) East 9 Duveneck Elementary School Board Meeting June 14, 2011 Plan: Building 2 (Kindergarten) 10 Duveneck Elementary School Board Meeting June 14, 2011 Plan: Building 3 (1st Grade wing) 11 Duveneck Elementary School Board Meeting June 14, 2011 Plan: Building 1(4th Grade wing) 12 Duveneck Elementary School Board Meeting June 14, 2011 Plan: Building 1(5th Grade wing) 13 Duveneck Elementary School Board Meeting June 14, 2011 Plan: Building F (Library) 14 Duveneck Elementary School Board Meeting June 14, 2011 Perspective: Kindergarten Quad 15 Duveneck Elementary School Board Meeting June 14, 2011 Perspective: Kindergarten Quad 16 Duveneck Elementary School Board Meeting June 14, 2011 Perspective: First Grade Wing 17 Duveneck Elementary School Board Meeting June 14, 2011 Perspective: Kindergarten Wing 18 Duveneck Elementary School Board Meeting June 14, 2011 Perspective: 4 & 5 Grade Wing 19 Duveneck Elementary School Board Meeting June 14, 2011 Perspective: 4 & 5 Grade Wing 20 Duveneck Elementary School Board Meeting June 14, 2011 Perspective: 4 & 5 Grade Wing 21 Duveneck Elementary School Board Meeting June 14, 2011 Modernization: Classroom Buildings A & D NEW PENDANT LIGHTING AND OCCUPANCY SENSORS NEW OPERABLE WINDOWS AT CLERESTORY,OPERATED BY VENTILATION CONTROLS NEW EXTERIOR WALL LOUVERSAND VENTILATION CONTROLS NEW WALL MOUNTED SMART BOARD AND PROJECTOR NEW BASE AND WALLCABINETS NEW SURFACE MOUNTED LIGHTING & OCCUPANCY SENSORS NEW ACCESSIBLEDOUBLE SINK 22 Duveneck Elementary School Board Meeting June 14, 2011 Board Review/Approval of Conceptual Design Dec. 7 - Dec. 14, 2010 Board Review of Schematic Design June 14 – June 28, 2011 Design Development July 2011 – Sept. 2011 Construction Documents Oct. 2011 – Jan. 2012 DSA Review Jan. 2011 - June 2012 Bid & Award July 2012 – Sep. 2012 Construction Oct. 2012 – March 2014 Occupancy Aug 2014 Project Milestones: Building 23 Duveneck Elementary School Board Meeting June 14, 2011 CHPS Target Points: Summary Scorecard Leadership, Education and Innovation........... Sustainable Sites........................................................... Water..................................................................................... Energy.................................................................................. Climate................................................................................ Materials and Waste Management.................... Indoor Environmental Quality.............................. Total Target Points...................................................... 4 13 3 15 0 3 20 58 24