Planning & Design Meetings Fairmeadow Site Logistic Plan for CSTSC 12/1/2011 - PresentationDecember 2011Fairmeadow Elementary –Site Logistic Plan during ConstructionStart Construction•Building G•Library ExtensionFencedAreaFenced AreaConstruction Traffic •Deliveries and equipment moves will be scheduled toavoid school rush hours•Library books/counters/etcwill be temp reconfiguredpriortoWinterBreakprior to Winter Breakfor new construction Summer 2012Fairmeadow Elementary –Site Logistic Plan during ConstructionConstruction Continue•Building G•Bldg. F Remodel•Library Extension&RemodelEntire campus to be aconstruction zone•No access to daycare•No summer camp•Soccer to be scheduled at alternate fields Fall 2012Fairmeadow Elementary –Site Logistic Plan during ConstructionConstruction Continue•Building G•Portion Site ConstructionBeforeSchoolStartBefore School Start•Schedule Moves back toJackson Bldg.•Library•Portable Spring 2013Fairmeadow Elementary –Site Logistic Plan during ConstructionpgConstruction Continue•Building G Completion•Remodel Bldg. D•Kinder Play AreaBefore School Start•Pack and Relocated D•Site to be Inaccessible Play Area Summer 2013Fairmeadow Elementary –Site Logistic Plan during ConstructionConstruction Continue•Remodel Bldg. D•Remodel Bld. A•Fields and Play AreaSite Work: •Reschedule Soccer•Day Care accessiblePrior to Summer Break•Move out of APrior to School Year•SetupclassroomsatSet up classrooms at permanent location