Loading...
Planning & Design Meetings Ohlone Elementary School Building Committee 5/7/2009 - Minutes 1 of 1 450 Geary Street, Suite 100, San Francisco, CA 94102 tel 415.346.4040 fax 415.346.4103 mail@gelfand-partners.com www.gelfand-partners.com Meeting Notes Project: Project No: Date: Ohlone ES 0819 June 10, 2009 Meeting Subject: Ohlone Elementary School Building Committee Meeting Date: 05/07/09 3:00 PM Location: Ohlone ES Those Present: Susan Charles Principal, Ohlone Ken Shark Ohlone Bldg Committee Nico Janik Ohlone Bldg Committee Renee Alloy Ohlone Bldg Committee Martha Gates Ohlone Bldg Committee Ashley McCrea Ohlone Bldg Committee Barbara Portman Ohlone Bldg Committee Mira Ohlone Bldg Committee Alex Creighton Ohlone Farm Susan Dansker OKC Lori Alvarez PAUSD Connie Conroy PAUSD/Gilbane Lisa Gelfand GPA Jorge Rico GPA Steven Korovesis GPA The following new items were discussed: New Items Action By ITEM 2.1 Survey PAUSD PAUSD to provide accurate, updated survey clearly indicating property lines for Ohlone campus. Partial survey provided to GPA on 4-19-09 indicates possible easement in location of new building. Initial survey provided to GPA indicated different property line. 2.2 Structural Assessment fyi GPA presented results of seismic assessment on existing Ohlone campus buildings. Buildings conform to Field Act / code from when built, however would not conform to current code. GPA recommended improvements to lateral systems of existing campus buildings. PAUSD PAUSD to determine funding for seismic improvements to existing campus buildings, contingent on board approval. PAUSD to develop additional package for seismic improvements at Ohlone, separate from current new building / modernization package. 2.3 New Building fyi GPA presented current scheme for new building at Ohlone, including floor plans, elevations, sections, site plan, and description of radiant heating mechanical system. GPA GPA to investigate revising layout of flex and resource rooms to show shared work rooms between both spaces. GPA GPA to investigate possibility of roll up door at lobby space and using lobby and hall spaces as break out spaces for small group work. 2.4 Site GPA GPA presented scheme for reconfigured drop off and parking area. GPA to investigate new dumpster location and space for bus parking. GPA GPA to provide copy of site plan and shadow projections to Ohlone farm representative. End of Meeting Notes These notes will be considered substantially correct and complete unless otherwise notified in writing within five working days of receipt. P:\0819 - Ohlone ES - Palo Alto\200 Client\220 Client Meeting Notes