Planning & Design Meetings Design - Mtg # 2 12/16/2008 - MinutesPage 1 of 3 A E D I S Architecture & Planning Meeting Notes 1494 Hamilton Avenue, San Jose, CA 95125 408.264.2000 – Fax 408.264.2500 PROJECT: Garland E.S. Renovation & Additions DATE: 12/16/08 MEETING: Design - Mtg # 2 PLACE: DO PROJECT NO: 28067.00 TIME: 10:00am ATTENDEES: Todd Walter, (AEDIS) Ginni Davis, (District) Bob Golton, (District) Arindam Bose, (AEDIS) Kevin Skelly, (District) Paul Stickney, (OCM) Lori Alvarez, (District) John Lents, (District (Addison ES)) Michael O’ Neill, (District (Briones ES) DISTRIBUTION: Attendees AEDIS, File ATTACHMENTS: None Item # Notes Responsible NEW MINUTES GENERAL 1.1 It was confirmed that Garland will be a 4 strand school. For Info. 1.2 Capacity Info: a. The count will be (24) total classrooms; which shall include the existing buildings (14 classrooms) and the new classroom building (10 classrooms). Of the total (24) classrooms (2) shall be SDC classrooms. In addition to the (24) classrooms there shall also be one (1) Flex room which is not part of the total room count. b. There shall be (4) kindergarten classrooms within the total classroom count. c. Also, there will be a teacher’s work/lunch room in the new admin area. The teacher’s work/lunch room is priority one and the Flex room is priority two if the construction budget is exceeded. For Info. 1.3 Aedis presented 3 site layout options. Option 1 - As per original Master Plan option Option 2 - (E) Admin converted to Library and new 2 story classroom building bordering the South-East end of the campus and the admin relocated into the existing classroom wing facing California Avenue. Also two additional Kindergarten classrooms are created next to the current Kindergarten. Option 3 - (E) Admin converted to 2 Classrooms and new 2 story Library and Classroom building bordering the South-East end of the campus and the For Info. PROJECT: Garland E.S. Renovation and Additions DATE: 12/16/08 MEETING: Design - Mtg # 2 PROJECT NO: 28067.00 Page 2 of 3 admin relocated into the existing classroom wing facing California Avenue. Also two additional Kindergarten classrooms are created next to the current Kindergarten. 1.4 Option 3 was preferred over Option 2 because of the central location of the library between the existing Classroom wing and the proposed classroom wing. For Info. 1.5 Speech and Psychology rooms to be located preferably in the new Admin area. For Info. 1.6 a. AEDIS to make a restroom count and possibly add new restrooms to the new classroom building. b. Location of new elevator for new story classroom building to be identified along with stairs. AEDIS 1.7 Two more options to be included: Option 4 - Move 2 story Classroom Building to the South West edge of campus between Garland and Jordan MS. Option 5 – Make an ‘L’ shape single story classroom and library building. 1.8 Decorative fence to be provided between Garland ES and Jordan MS. 1.9 Next Meetings: a. Jan 6th or 7th – Presentation to the neighborhood association in the evening. b. Jan 13th - Board meeting and working sessions – Update on design to be presented. Presentation will have the following: 1. Design Boards 2. Schedule 3. Budget 4. Calculations of Turf area /student and acreage per student District/OCMI will send requirements to AEDIS for calculations to be included in the presentation. AEDIS/OCMI 1.10 Following schedule was acceptable by all: Prelim Concept Plan – December 2008 Schematic Design – January to March 2009 Design Development – April to June 2009 Construction Documents 50% - July to August 2009 Construction Documents 90% - September to October 30, 2009 DSA submittal – November 2009 DSA Approval / Construction Documents 100% - March 2010 Bid – April 2010 Construction – June 2010 to July 2011 Occupancy – August 2011 For Info. 1.11 District will review budget of the project with Board after the Board presentation. For Info. 1.12 AV / Technology – Scope: AEDIS to coordinate with Marie Scigliano with respect to Tech. Specs for each elementary school classroom. AEDIS PROJECT: Garland E.S. Renovation and Additions DATE: 12/16/08 MEETING: Design - Mtg # 2 PROJECT NO: 28067.00 Page 3 of 3 End of Meeting Notes This information is the understanding of AEDIS Architecture & Planning of the various items discussed and agreed upon during the meeting. Please contact the writer within five (5) days if there are any revisions and/or additions necessary to these meeting minutes.