Planning & Design Meetings Shematic Design Kickoff Mtg. 3/16/2009 - MinutesPage 1 of 2 A E D I S Architecture & Planning Meeting Notes 1494 Hamilton Avenue, San Jose, CA 95125 408.264.2000 – Fax 408.264.2500 PROJECT: Garland E.S. Renovation & Additions DATE: 3/16/09 Shematic Design MEETING: Kickoff Mtg. PLACE: D.O. Bldg D PROJECT NO: 28067.00 TIME: 3:30pm ATTENDEES: Ginni Davis (PAUSD Assist. Superintendent) Laura Losier (Library Coordinator) Michael O’Neill (Principal at Briones ES) Debbie Benson (P.E. Primary) Nancy Coffey (Music Coordinator) Karen Dolkas (P.E. Upper Grades) Elaine Saussotte (Elem. Secretary) Lori Alvarez (O’Connor Construction) Duane Kester (Maintenance Operations) Todd Walter (AEDIS Architects) Melvin Dumas (Custodian) Mariana Alvarez-Parga (AEDIS Arch.) Sharon Ferguson (Visual Art Coordinator) DISTRIBUTION: Attendees, AEDIS File ATTACHMENTS: None Item # Notes Responsible 1.1 Introduction Introduction Program Manager: O’Connor Construction Architect: Aedis Architecture + Planning info 1.2 Process Process and Work Plan There will be two more meetings: a meeting on Thursday 3/19/09 for each user group and a follow up general meeting on Monday 4/13/09. info 1.3 Conceptual Plan Presentation The conceptual plan approved by PAUSD Board was presented. The plan shows scope being · General upgrade on existing classrooms, · New two-story classroom building, · New library placed in an existing wing with some expansion, · New multi-purpose building with food service area, · New and expanded administration in its current location, · New Flex room in new classroom wing · Relocated Portable building housing day care program, and · Removal of existing portable classrooms It was explained that the plan shows “place holders” for the different programmatic spaces. This group would be a key contributor to determine the needs of each space that will be studied during the schematic phase. info PROJECT: Garland E.S. Renovation and Additions DATE: 3/16/09 MEETING: Schematic Design – Gral Mtg # 1 PROJECT NO: 28067.00 Page 2 of 2 1.4 User Groups A preliminary list was given to the attendees showing items for each space. This list is to be completed by the group to help determine needs and design of each program space (Admin, Flex Rm, Ext. Play areas, Custodial, Library, Day Care, MP and food service, Primary and upper grade classroom). info 1.5 CHPS Sustainable design and minimum standards were briefly explained as this project will follow CHPS standards. info 1.6 Budget The estimated total project cost is $22M to $22.5M. This budget includes construction cost and soft costs, these being DSA fees (Department of State Architect), Professional fees and estimated escalation costs. info 1.7 Project Schedule A Project Schedule was presented showing estimated construction to be completed by March 2012. Info 1.8 Next Mtg Thursday 3/19/09 from 8:30am to 12:30pm. Info End of Meeting Notes This information is the understanding of AEDIS Architecture & Planning of the various items discussed and agreed upon during the meeting. Please contact the writer within five (5) days if there are any revisions and/or additions necessary to these meeting minutes.