Loading...
Planning & Design Meetings Design Committee Mtg # 7 2/23/2009 - MinutesPage 1 of 1 A E D I S Architecture & Planning Meeting Notes 1494 Hamilton Avenue, San Jose, CA 95125 408.264.2000 – Fax 408.264.2500 PROJECT: Garland E.S. Renovation & Additions DATE: 2/23/09 MEETING: Design Committee Mtg # 7 PLACE: District Office – Bldg D PROJECT NO: 28067.00 TIME: 6:30pm ATTENDEES: Kevin Skelly (District Superintendent) Tom Hodges, (OCM) Bob Golton, (District Chief Business Official) Lori Alvarez, (OCM) John Lents, (Principal at Addison ES) Todd Walter, (AEDIS Principal) Michael O’Neill, (Principal at Briones ES) Mariana Alvarez-Parga (AEDIS) Arnold Teten (Gilbane Building Company) Item # Notes 7.1 Introduction: - Purpose of meeting: discuss presentation to the Board of Education on February 24th. 7.2 District Presentation - Introduction - Meetings to date - Request for approval of: Placement of two-story building, new MP bldg by Admin office, etc - Budget increase breakdown: $11.1M site renovation, library, flex room, six classrooms + $2.9M MP bldg + $1.0M Admin Bldg + $0.2 relocation of Childcare portable bldg + $3.8M six additional classrooms + $1.3M fields and hardscape + $1.8M design contingency and escalation = $22.1M 7.3 AEDIS Presentation - Design priorities - Option 7A (presented at previous Board Meeting) - New Option 7A-3 (per community meeting) showing: Reduced MP bldg footprint Increase setback for pedestrian visibility by cars exiting the parking area Music and General storage placed in the two-story building, next to the Flex room and accessible from fields Restroom core on 1st and 2nd floors - MP Bldg orientation studies (three studies in one slide) - Timeline 7.4 Program - Placing the building at an angle frames the entry plaza better and provides a cheated perspective from the street that is smoother than a parallel wall in the direction of travel. - Having the library under the 2nd story of the new wing would result in a long narrow space with no room for high ceilings and glass frontage. The library should remain in location suggested in Option 7A. - Exact orientation of the Mp bldg will be defined during Schematic Design End of Meeting Notes This information is the understanding of AEDIS Architecture & Planning of the various items discussed and agreed upon during the meeting. Please contact the writer within five (5) days if there are any revisions and/or additions necessary to these meeting minutes.