Monthly Reports 2014-06 (Jun)
MMOOOONNTTHH
Cap
HHLLYY PPRR
T
Jun
Strong S
pital Impr
P
fs
RROOGGRREE
Through
e 201
Schools B
rovement
repared by
s3|Hodges
EESSSS RREE
14
Bond
t Projects
EEPPOORRTT
s
Pa
TT
age | 1
TABLE O
Executive
At
Capital Pro
G
G
G
Pa
Pa
Pa
Pa
J.
D
Te
Completed
G
G
G
Pa
Pa
Jo
J.
Te
Fa
O
Pr
Jo
G
J.
Fa
El
Pa
G
G
M
Inactive Ca
G
H
H
El
Appendix
Ex
OF CONTEN
Summary
ttachment 1 –
ojects
unn High Scho
unn High Scho
unn High Scho
alo Alto High S
alo Alto High S
alo Alto High S
alo Alto High S
L. Stanford Mid
uveneck Eleme
echnology
d Capital Proje
unn High Scho
unn High Scho
unn High Scho
alo Alto High S
alo Alto High S
ordan Middle S
L. Stanford Mid
erman Middle
airmeadow Ele
hlone Element
roperty Acquis
ordan Middle S
unn High Scho
L. Stanford Mid
airmeadow Ele
lementary Clas
alo Alto High S
unn High Scho
unn High Scho
Middle School P
apital Projects
arland Elemen
igh School Ma
oover Element
lementary Clas
xhibit A – Bond
NTS
Consolidated
ool – Phase I ‐ P
ool – E and K (L
ool – Central Bu
School – New C
School – Perfor
School – Scienc
School – New G
ddle School
entary School –
ects
ool – New Class
ool – New Gym
ool – Existing G
School – Athlet
School – Hayma
School
ddle School – L
School
ementary Scho
tary School
sition – 525 San
School – Interim
ool – Air Condit
ddle School – I
ementary Scho
ssroom Improv
School – Multi‐
ool – Industrial
ool – Aquatic Ce
Pre‐Design
ntary School
ster Plan
tary School
ssroom Improv
d Project List
Expenditure R
Parking and Dr
31 and MS) Bu
uilding Project
Classroom Build
rming Arts Cen
ce Building Add
Gymnasium
– New Classroo
sroom Building
nasium
ymnasium Mo
ic Stadium Imp
arket and Tow
Landscape and
ol – New Class
n Antonio Rd
m Classrooms
tioning of Exist
Interim Classro
ol – Portable R
vements – Inte
use Field
Arts Renovatio
enter
vements
eport
op‐off Sitewor
uildings Renova
ding and Medi
ter
dition
om Buildings a
g and World La
odernization
provements
er Building Imp
d Site Improvem
sroom Building
ting Buildings
ooms
Relocation
ractive Whiteb
on
rk Improvemen
ation
a Arts
and Moderniza
anguages Build
provements
ments
gs and Modern
board & Sound
nt
ation
ing
nization
d Assist System
Pa
page 3
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
m page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
age | 2
Gunn High
All on site
Palo Alto a
Alto reque
Grade Tech
Gunn High
AM Woo c
fire alarm,
windows, d
Gunn High
DLM prese
two story
base progr
design dev
Palo Alto H
Occupancy
June 2014
Palo Alto H
The BOE a
on June 18
fencing wa
Palo Alto H
DLM will re
after const
larger proj
meet addit
Palo Alto H
DSA comp
June 2014
finalizing t
Duveneck
Alpha Bay
redwood s
ceilings an
rough in.
sod.
Technolog
Equipment
year.
h School – Mira
improvement
and County of
ested revisions
h anticipates c
h School – E an
completed aba
, and HVAC ro
doors, and floo
h School – Cent
ented schemat
option that ad
ram. The BOE
velopment.
High School – N
y of the buildin
at the new Ma
High School – P
warded the pr
8, and the not
as installed on
High School – S
esume meetin
truction of the
ject, existing p
tional science c
High School – I
leted their rev
, for a planned
he lease‐lease
Elementary Sc
Builders (ABB)
soffit of the ne
nd window ins
ABB complete
gy
t orders have a
anda Ave. Dro
s except for st
Santa Clara, G
after permit a
ompletion, exc
nd K (L‐31 and
atement, demo
ough‐ins have
oring by the en
tral Building P
tic design optio
dds a wellness
approved the
New Math/Soc
ngs will occur d
ath/Social Scie
Performing Art
roject to Alten
tice to procee
June 30, 2014
Science Buildin
gs with faculty
e new gymnas
portables in th
classroom cap
Indoor PE and
view on May 22
d DSA backche
back agreeme
chool – New C
) completed ex
ew two‐story c
tallation are c
ed the demolit
arrived and are
EXECUT
p‐Off (Phase I
triping have be
GradeTech, Inc
pproval delayi
cept for the Co
MS) Buildings
olition work an
commenced.
nd of July 2014
roject
ons to the BOE
s center, colle
schematic des
cial Sciences B
during summe
nces building.
ts Center (PAC
n Construction
ed was issued
and the contra
ng Addition
y after summer
sium, due to s
he quad are be
acity needs.
Athletic Facili
2, 2014. Jerem
eck in July/Aug
nt are also in p
lassroom Build
xterior wall pa
classroom buil
complete. In b
ion of the exis
e being deploy
IVE SUMM
‐ Parking and
een completed
c. commenced
ing completion
ounty traffic sig
Renovation
nd interior fra
AM Woo is
4.
E on June 3, 20
ge and career
sign two‐story
Building and M
r break. Move
Media Arts fu
C)
on June 3, 20
on June 23, 2
actor is expect
r break. The co
pace constrain
eing renovated
ties
miah Tolbert A
gust 2014. Ad
progress.
dings and Mod
inting and con
ding. In build
building C (flex
sting portables
yed to the vario
MARY
Drop‐Off Impr
d. After receiv
offsite demoli
n of the off‐site
gnal replaceme
ming in buildi
scheduled to
014 and recom
r center and th
option on June
Media Arts Buil
e‐in of teacher
urniture is antic
014. A pre‐con
2014. Tree pro
ted to mobilize
onstruction sc
nts and access
d into two int
Architects conti
ddressing cons
dernization
ntinued installa
ing F (library),
x room), ABB
s on campus a
ous campuses
rovements)
ing final appro
ition and grad
e improvemen
ent by the end
ngs E and K.
be complete
mmended movi
hree additiona
e 17, 2014. DL
ding
r materials and
cipated to arriv
nstruction mee
otection fenci
e on‐site startin
hedule has bee
s to the site.
terim science
inued to pick u
structability rev
ation of exterio
, tackable surf
completed fra
nd is re‐gradin
for use during
Pa
oval from the C
ing. The City o
ts to the end o
d of July 2014.
Plumbing, elec
with drywall,
ing forward wi
al classrooms
LM will procee
d furniture star
ve in July 2014
eting was cond
ng and constr
ng July 7, 2014
en adjusted to
Also, as part o
labs this summ
up DSA comme
view commen
or metal railing
face, casework
aming and ele
ng the fields fo
g the 2014/15
age | 3
City of
of Palo
of July.
ctrical,
paint,
ith the
to the
d with
rted in
4.
ducted
ruction
4.
o occur
of this
mer to
ents in
ts and
gs and
k, drop
ectrical
or new
school
COMPLETE
Gunn High
The new M
Building cla
Gunn High
The new g
The tennis
Gunn High
The moder
Palo Alto H
The conces
the Fall 20
Palo Alto H
All Trusty B
Jordan Mid
Students o
J.L. Stanfo
Students o
J.L. Stanfo
Scapes com
Terman M
Students
moderniza
Fairmeado
Students o
525 San An
This site ha
Ohlone Ele
Move‐in to
new buildi
Jordan Mid
The portab
Gunn High
Best Contr
summer 20
ED CAPITAL PR
h School – New
Math and Eng
assrooms were
h School – New
gymnasium wa
courts were c
h School – Exist
rnized Bow gym
High School – A
ssions building
13 season.
High School – H
Builders compl
ddle School
occupied all new
rd Middle Sch
occupied all new
rd Middle Sch
mpleted the pr
iddle School
occupied the
ation was comp
ow Elementary
occupied all new
ntonio Road –
as been leased
ementary Scho
o the new bui
ng on January
ddle School ‐ I
bles were insta
h School – Air C
racting Service
011.
ROJECTS
w Classroom Bu
lish Building w
e occupied in F
w Gymnasium
s occupied on
ompleted Aug
ting Gymnasiu
m was occupie
Athletics Stadi
g, track re‐surfa
Haymarket an
leted the insta
w and modern
ool
w and modern
ool – Landscap
roject on sched
new instruct
pleted in Octob
y School – New
w and modern
Site Acquisitio
d to Athena Aca
ool – New Clas
lding and othe
3, 2012.
nterim Classro
alled and move
Conditioning o
es Inc. comple
uilding and Wo
was occupied
February, 2013
June 7, 2013 a
ust 27, 2013.
um Modernizat
ed by the camp
ium Improvem
acing, new orn
d Tower Build
llation of the n
nized buildings
nized buildings
pe and Sitewo
dule in the fall
tional spaces
ber 2013.
w Classroom Bu
nized buildings
on
ademy.
ssroom Buildin
er existing clas
ooms
ed into for fall 2
of Existing Build
eted the instal
orld Language
by staff and s
3.
and PE classes
tion
pus on Novemb
ments
namental fence
ing Improvem
new windows o
in fall 2013.
in fall 2013.
rk Improveme
2013.
and modern
uilding and Mo
in fall 2013.
ng and Modern
ssrooms occur
2011. DSA clos
dings
llation of air c
s Building
students on A
s were held in
ber 4, 2013.
e, signage and
ments
on August 9, 20
ents
ized buildings
odernization
nization
rred in Decem
seout received
conditioning u
ugust 15, 201
the new gym
entry lighting
013.
s in fall 2013
ber 2011. Stu
d November 19
units and cool
Pa
3. World Lan
on August 15,
were complet
3. The cafet
udents occupie
9, 2012.
roof coating
age | 4
nguage
2013.
ted for
torium
ed the
in the
J.L. Stanfo
Coulter Co
Fairmeado
Relocation
Elementar
Installation
classrooms
Palo Alto H
The fields w
2011.
Gunn High
This facility
Gunn High
This facility
Middle Sch
These proj
INACTIVE C
Garland El
The Board
elementar
High Schoo
The Board
closed.
Hoover Ele
This projec
Elementar
The projec
rd Middle Sch
onstruction com
ow Elementary
n of the portab
ry Classroom Im
n of SmartBoa
s and libraries
High School – M
were available
h School – Indu
y was available
h School – Aqu
y was available
hools Pre‐Desi
ects for pre‐de
CAPITAL PROJ
ementary Sch
of Education
y schools. Disc
ol Master Plan
of Education
ementary Scho
ct has been put
ry Classroom Im
ct has been pla
ool ‐ Interim C
mpleted the wo
y School – Port
le was comple
mprovements
ards and Ligh
in April 2011.
Multi‐use Field
e for play on Fe
ustrial Arts Add
e for instructio
atic Center
e for use in July
ign – Jordan, J.
esign work hav
ECTS
ool Renovatio
has put new d
cussions with t
n
(BOE) approv
ool – Pre‐Desig
t on hold until
mprovements
ced on hold pe
Classrooms
ork on the relo
table Relocatio
te and occupie
– Installation
htspeed sound
d
ebruary 1, 201
dition & Renov
n in January 20
y 2009, and ha
.L. Stanford an
ve been closed
n
development f
the Board on fu
ved the maste
gn
a growth plan
– Phase 1 Sch
ending further
ocated portable
on
ed on August 8
of Interactive
d assist system
1, and final ch
vation
010. DSA close
s been closed
nd Terman
.
for Garland on
uture plans for
r plans for bo
is established
ools Barron Pa
discussions w
es in August 20
8, 2011.
Whiteboards
ms were com
hange order ne
eout received o
out with DSA.
n hold until a g
r growth at the
oth high schoo
d for the eleme
ark and El Carm
ith the BOE ab
011.
and Sound As
pleted for all
egotiations com
on July 18, 201
growth plan is
e elementary s
ols, and these
entary schools.
melo
bout elementar
Pa
ssist Systems
elementary
mpleted on Ma
11.
s established f
schools are ong
projects have
ry growth plan
age | 5
school
arch 9,
for the
going.
e been
nning.
June 3, 201
Consent 6
Duveneck
Action 37 –
School
June 17, 20
Consent 4
Consent 6
School
Consent 7
Schools Bo
Consent 12
Palo Alto H
Consent 14
Action 26
and Athlet
Action 32 –
14
– Authorizati
Elementary Sc
– Award of Co
014
– Approval of
– Approval of
– Authorizati
ond Program
2 – Authorizat
High School
4 – Appropriat
– Approval to
ic Facilities Pro
– Authorization
on to Issue Ad
hool
ontract and Ap
Change Orders
f Schematic De
ion to Issue A
tion to Issue A
ion of Strong S
Authorized Ex
oject (“Paly Gy
n to Contract f
Board
ddendum No.
proved Budget
s
esign and Arch
Addendums to
Addendum No.
School Bond Fu
xpenditure Inc
ms Project”)
for 2014‐15 wit
Actions in Jun
17 to Gelfand
t Adjustment f
itect Addendu
Specialty Con
19 to DLM fo
unds
rease for the P
th fs3|Hodges
ne
d Partners Arc
for the Perform
um for the Cen
nsultants for A
or Performing A
Palo Alto High
for Bond Prog
chitects for Ad
ming Arts Cent
ntral Building P
Additional Serv
Arts Center La
h School Indoo
gram Managem
Pa
dditional Servi
ter at Palo Alto
Project at Gunn
vices for the S
andscape Chan
or Physical Edu
ment
age | 6
ices at
o High
n High
Strong
nges at
cation
A B C C / A B - C C / B A - BGunn High School - High School Master Plan 172,390 166,328 138,714 80.5% 27,614 83.40% 6,062Gunn High School 1 - Aquatic Center 4,865,425 4,862,530 4,862,530 99.9% 0 100.00% 2,895Gunn High School 2 - I.A Building 5,082,402 5,066,038 5,065,128 99.7% 910 99.98% 16,364Gunn High School 3 - AD2- close out 5,777 5,777 5,777 100.0% 0 100.00% 0Gunn High School 4 - New classroom Buildings 25,035,201 25,007,997 24,743,041 98.8% 264,956 98.94% 27,204Gunn High School 5 - Parking & Drop Off improvements 3,940,000 1,976,335 1,366,850 34.7% 609,485 69.16% 1,963,665Gunn High School 6- New/Auxiliary Gymnasium 12,914,800 12,558,806 12,287,486 95.1% 271,320 97.84% 355,994Gunn High School 7- A/C 2,600,000 2,102,366 2,102,366 80.9% 0 100.00% 497,634Gunn High School 8 - MS & L-31 Buildings 2,120,839 1,687,605 257,795 12.2% 1,429,810 15.28% 433,234Gunn High School 9 - Central building 19,374,242 207,615 63,715 0.3% 143,900 30.69% 19,166,627Gunn High School - Reserved 0 0 0 0.0% 0 0.00% 0Palo Alto High Schools - High School Master Plan 172,999 167,759 161,616 93.4% 6,143 96.34% 5,240Palo Alto High School 1 - Stadium Field 5,090,000 4,758,036 4,749,887 93.3% 8,149 99.83% 331,964Palo Alto High School 2 - Multi-Use Field (Multi-Fund) 2,609,680 2,609,680 2,609,680 100.0% 0 100.00% 0Palo Alto high School 3 - New classroom & Media Art Building 38,415,003 36,264,316 34,593,159 90.1% 1,671,157 95.39% 2,150,687Palo Alto High School 4 - New Theater 29,370,049 26,593,225 1,386,769 4.7% 25,206,456 5.21% 2,776,824Palo Alto High School 5 - Haymarket and Tower Admin. Building 1,499,999 1,295,932 1,260,933 84.1% 34,999 97.30% 204,067Palo Alto High School 6- Science Addition 5,532,204 666,542 336,184 6.1% 330,358 50.44% 4,865,662Paly 7- indoor phusical ed and athletic facilities 350,000 167,719 164,767 47.1% 2,952 98.24% 182,281Palo Alto High School - Reserved 18,474,443 0 0 0.0% 0 0.00% 18,474,443Jordan Middle School -Program Management- MS Pre-Design 18,890 17,826 17,826 94.4% 0 100.00% 1,064Jordan Middle Schools 1- Interim Classrooms 600,342 494,156 487,577 81.2% 6,579 98.67% 106,186Jordan Middle School 2- Improvements 19,891,564 19,117,347 17,990,265 90.4% 1,127,082 94.10% 774,217J.L.S Middle School - Program Management- MS Pre-Design 18,799 18,408 18,408 97.9% 0 100.00% 391J.L.S Middle School 1 - Interim Classrooms 446,844 422,500 422,500 94.6% 0 100.00% 24,344 J.L.S Middle School 2- Improvements 17,184,699 15,621,930 15,382,916 89.5% 239,014 98.47% 1,562,769Terman Middle School - Program Management- MS Pre-Design 18,799 18,423 18,423 98.0% 0 100.00% 376Terman Middle School 1- Improvements 13,312,971 13,054,192 12,881,926 96.8% 172,266 98.68% 258,779PAUSD Elementary Schools - Program Management- Elem. Growth Plan 145,000 98,480 92,290 63.6% 6,190 93.71% 46,520Addison Elementary School 1-Phase I 21,267 21,267 21,267 100.0% 0 100.00% 0Duveneck Elementary School 1-Phase I 9,778,358 9,457,919 7,704,890 78.8% 1,753,029 81.46% 320,439Garland Elementary School 1- Phase I 22,178,544 280,113 280,113 1.3% 0 100.00% 21,898,431Fairmeadow Elementary School 1- Phase I 7,796,550 7,714,442 7,345,894 94.2% 368,548 95.22% 82,108Hoover Elementary School 1-Phase I 70,550 57,165 57,165 81.0% 0 100.00% 13,385Ohlone Elementary School 1- Phase I 10,597,870 10,578,054 10,481,389 98.9% 96,665 99.09% 19,816 Elementary Schools 1 - Elementary Classroom Improvements * 2,004,889 1,879,695 1,879,695 93.8% 0 100.00% 125,194Elementary Schools - Reserved 37,585,253 0 0 0.0% 0 0.00% 37,585,253PAUSD - Program Management 10,380,131 8,792,981 8,461,383 81.5% 331,598 96.23% 1,587,150PAUSD - Technology 10,485,054 9,394,521 9,376,603 89.4% 17,918 99.81% 1,090,533PAUSD - Technology -Reserved 3,422,312 0 0 0.0% 0 0.00% 3,422,312PAUSD - Reserved 6,043,535 0 0 0.0% 0 0.00% 6,043,535525 San Antonio -Property Acquisition 8,500,000 8,500,000 8,500,000 100.0% 0 100.00% 0Bond Issuance Cost & Other Transfer Out 20,288,777 20,288,777 20,288,777 100.0% 0 100.00% 0Total378,416,451 251,992,801 217,865,703 34,127,098 126,423,650Prepared by: Business Services Department based on QSS accounting SystemBudgetSchool Name - Project NamePercent of Budget ExpendedPalo Alto Unified School DistrictStrong Schools Bond6/14/2014Percent of ExpendedContract BalanceExpenditures Budget BalanceCommitted
Gunn H
Miranda
Phase I –
A. PROJE
All on
receiv
Grade
Alto r
off‐sit
except
B. BUDG
C. BOND
D. PROJE
Ph
im
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
High Schoo
Ave. Drop O
– Parking an
ECT STATUS
n‐site improve
ing final appro
Tech, Inc. com
equested revi
e improvemen
t for the Count
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
hase I, Mirand
mprovements h
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
l
Off
d Drop‐off I
ments except
oval from the C
mmenced offsit
sions after pe
nts to the end o
ty traffic signal
LE SUMMARY
T REFERENCE: 5
W:
a Ave. parking
has been delay
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
mprovemen
for striping h
City of Palo Alt
te demolition
ermit approval
of July. Grade
l replacement
5.5
and drop‐off p
yed by City of P
$0
$3,940,000
$0
$3,940,000
$0
$0
$919,858
$2,919,840
$100,302
$3,940,000
34.7%
$121,380
$121,380
0.0%
Directives vs.
nts
have been co
to and County
and grading. T
l delaying com
Tech anticipat
by the end of J
project is proce
Palo Alto perm
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Authorize t
BOE Approv
Submit to D
Approval by
Bid Openin
Award of C
Notice to P
Substantial
* Anticipated
( ) Denotes n
ompleted. Afte
y of Santa Clara
The City of Pal
mpletion of th
tes completion
July 2014.
eeding within
mit changes.
ase:Const
ontract (2)
val
l Design (2)
val
Design (2)
val
to Bid (2)
val
DSA
y DSA
g
ontract (1)
roceed
Completion
d Dates – Subject to C
umber of Board of E
er
a,
o
he
n,
budget. Comp
ruction
March 31
April 14,
June 19,
June 26,
Decembe
January 1
June 11,
June18, 2
July 17, 2
October
Novembe
Novembe
Decembe
July 31, 2
Change
Education Readings
Pa
letion of off‐si
1, 2009
2009
2012
2012
er 18, 2012
15, 2013
2013
2013
2013
2, 2013
er 12, 2013
er 19, 2013
er 4, 2013
2014*
age | 7
te
Gunn H
E and K (
A. PROJE
AM W
buildin
have c
paint,
B. BUDG
C. BOND
D. PROJE
Co
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
High Schoo
(MS and L‐31
ECT STATUS
Woo completed
ngs E and K.
commenced.
windows, doo
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
onstruction is
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
l
1) Buildings
d abatement, d
Plumbing, ele
AM Woo is s
ors, and floorin
LE SUMMARY
T REFERENCE: 3
W:
proceeding acc
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
Renovation
demolition wo
ectrical, fire al
scheduled to b
g by the end o
3.4, 3.5, 3.13
cording to sche
$0
$2,120,839
$0
$2,120,839
$0
$0
$428,000
$1,690,552
$2,287
$2,120,839
12.2%
$122,800
$122,800
0.0%
Directives vs.
n
ork and interio
arm, and HVA
be complete w
of July 2014.
edule and with
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Authorize t
BOE Approv
Approval by
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated
( ) Denotes n
or framing in
AC rough‐ins
with drywall,
hin budget.
ase: Const
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
to Bid (2)
val
y DSA
g
ontract (1)
roceed
Completion
ccupancy
d Dates – Subject to C
umber of Board of E
truction
March 31
April 14,
Septemb
Septemb
June 11,
June 18,
Novembe
March 25
April 22,
March 27
April 29,
May 20,
May 27,
August 1
August 1
Change
Education Readings
Pa
1, 2009
2009
ber 8, 2009
ber 22, 2009
2013
2013
er 25, 2013
5, 2014
2014
7, 2014
2014
2014
2014
1, 2014*
5, 2014*
age | 8
Gunn H
Central B
A. PROJE
DLM p
and re
adds a
classro
design
design
B. BUDG
C. BOND
D. PROJE
Sc
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
High Schoo
Building Proj
ECT STATUS
presented sche
ecommended
a wellness cent
ooms to the b
n two‐story op
n development
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
chematic desig
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
l
ject
ematic design
moving forwa
ter, college an
base program.
ption on June
t.
LE SUMMARY
T REFERENCE: 5
W:
gn approved on
unds
ment
y
ended
options to the
ard with the t
d career cente
The BOE ap
17, 2014. D
5.5
n June 17, 2014
$0
$19,374,242
$0
$19,374,242
$0
$0
$3,237,823
$15,936,419
$200,000
$19,374,242
0.3%
e BOE on June
wo story opti
er and three ad
proved the sc
LM will proce
4. Design deve
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Authorize t
BOE Approv
Approval by
Bid Openin
Award of C
Notice to P
Substantial
* Anticipated
( ) Denotes n
3, 2014
on that
dditional
chematic
eed with
elopment draw
ase:Design
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
to Bid (2)
val
y DSA
g
ontract (1)
roceed
Completion
d Dates – Subject to C
umber of Board of E
wings are in pr
n Development
March 31
April 14,
February
March 11
June 3, 2
June 17,
Decembe
June 7, 2
June 21,
June 25,
August 1
August 2
Septemb
January,
Change
Education Readings
Pa
ogress.
1, 2009
2009
y 25, 2014
1, 2014
2014
2014
er 2, 2014*
2015*
2015*
2015*
2, 2015*
9, 2015*
ber 10, 2015*
2017*
age | 9
Palo Alt
Classroo
A. PROJE
Occup
teache
Scienc
B. BUDG
C. BOND
D. PROJE
Fu
du
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
to High Sch
m Building a
ECT STATUS
pancy of the b
er materials an
ces building. M
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
urniture install
uring Summer
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
hool
and Media A
buildings will o
nd furniture sta
Media Arts furn
LE SUMMARY
T REFERENCE: 4
W:
ation and occu
2014.
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
Arts
occur during s
arted in June 2
niture is anticip
4.1 ‐ 4.3
upancy of the M
$0
$38,415,001
$0
$38,415,001
$18,448
$1,325,333
$7,261,915
$29,713,481
$95,826
$38,415,001
90.1%
$2,515,000
$85,252
9.7%
Directives vs.
summer break
2014 at the new
pated to arrive
Media Arts and
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Authorize t
BOE Approv
Approval by
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated
( ) Denotes n
k. Move‐in of
w Math/Social
in July 2014.
d Math/Social
ase: Close
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
to Bid (2)
val
y DSA
g
ontract (1)
roceed
Completion
ccupancy
d Dates – Subject to C
umber of Board of E
Sciences build
eout
March 31
April 14,
Septemb
Septemb
January 1
January 2
August 4
March 8,
March 22
April 28,
June 30,
July 12, 2
August 4
April 15,
August 1
Change
Education Readings
Pag
dings taking pla
1, 2009
2009
ber 8, 2009
ber 22, 2009
12, 2010
26, 2010
4, 2010
, 2011
2, 2011
2011
2011
2011
4, 2011
2014
, 2014*
ge | 10
ace
Palo Alt
Performi
A. PROJE
The BO
constr
was is
fencin
mobili
B. BUDG
C. BOND
D. PROJE
BO
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
to High Sch
ing Arts Cen
ECT STATUS
OE awarded th
ruction meetin
ssued on June
ng was installe
ize on‐site star
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
OE award of th
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
hool
nter (PAC)
he project to A
ng was conduct
e 23, 2014. T
ed on June 30,
rting July 7, 201
LE SUMMARY
T REFERENCE: 4
W:
he project occu
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
Alten Construct
ted on June 18
Tree protectio
, 2014 and th
14.
4.11
urred on June 3
$0
$29,370,049
$0
$29,370,049
$0
$0
$4,377,871
$24,845,000
$147,178
$29,370,049
4.7%
$2,184,400
$2,184,400
0%
Directives vs.
tion on June 3,
8, and the noti
n fencing and
e contractor i
3, 2014 to Alte
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
BOE Approv
Submit to D
Approval by
Authorize t
BOE Approv
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated
( ) Denotes n
, 2014. A pre‐
ice to proceed
d construction
s expected to
en Construction
ase: Const
ontract (2)
val
l Design (2)
val
Design (3)
val
val
DSA
y DSA
to Bid (2)
val
g
ontract (1)
roceed
Completion
ccupancy
d Dates – Subject to C
umber of Board of E
‐
n
o
n.
truction
March 31
April 14,
June 1, 2
June 22,
June 14,
Decembe
January 1
March 28
January 1
January 1
January 2
May 13,
June 3, 2
June 23,
February
June 1, 2
Change
Education Readings
Pag
1, 2009
2009
2010
2010
2011
er 13, 2011
17, 2012
8, 2013
16, 2014
14, 2014
28, 2014
2014
2014
2014
y 13, 2016*
2016*
ge | 11
Palo Alt
Science B
A. PROJE
DLM
constr
new g
part o
into t
classro
B. BUDG
C. BOND
D. PROJE
D
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
to High Sch
Building Add
ECT STATUS
will resume
ruction schedu
gymnasium, du
f this larger pr
two interim s
oom capacity n
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
esign developm
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
hool
dition
meetings wi
ule has been a
ue to space co
roject, existing
cience labs t
needs.
LE SUMMARY
T REFERENCE: 4
W:
ment will resum
unds
ment
y
ended
th faculty af
djusted to occ
onstraints and
portables in th
his summer t
4.1 ‐ 4.3
me in the fall o
$0
$5,532,204
$0
$5,532,204
$0
$60,309
$842,825
$4,628,294
$776
$5,532,204
6.1%
fter summer
cur after const
access to the
he quad are be
to meet addi
once staff retu
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Authorize t
BOE Approv
Approval by
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated
( ) Denotes n
break. The
truction of the
site. Also, as
eing renovated
tional science
rn from summ
ase: Desig
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
to Bid (2)
val
y DSA
g
ontract (1)
roceed
Completion
ccupancy
d Dates – Subject to C
umber of Board of E
e
e
s
d
e
mer break.
gn Development
March 12
March 19
March 12
March 19
Septemb
October
Novembe
February
February
August 9
March 30
April 7, 2
April 17,
June 2, 2
August 1
Change
Education Readings
Pag
2, 2013
9, 2013
2, 2013
9, 2013
ber 10, 2013
8, 2013
er 7, 2014*
y 2, 2016*
y 19, 2016*
, 2015*
0, 2016*
2016*
2016*
2017*
, 2017*
ge | 12
Palo Alt
Indoor P
A. PROJE
DSA c
Tolber
June 2
Addre
the lea
B. BUDG
C. BOND
D. PROJE
Pl
D
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
to High Sch
E and Athlet
ECT STATUS
completed the
rt Architects c
2014, for a pla
ssing construc
ase‐leaseback
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
lans submitted
SA backcheck w
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
hool
tic Facilities
eir review on
continued to
nned DSA bac
ctability review
agreement are
LE SUMMARY
T REFERENCE: 4
W:
d into DSA for r
will be schedu
unds
ment
y
ended
s
May 22, 201
pick up DSA
kcheck in July/
w comments
e also in progre
4.1 ‐ 4.3
review on Janu
led in July 201
$0
$350,000
$0
$350,000
$0
$0
$225,000
$125,000
$0
$350,000
47.1%
14. Jeremiah
comments in
/August 2014.
and finalizing
ess.
uary 27, 2014, w
4.
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Re‐Submit t
Approval by
Lease Lease
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated
( ) Denotes n
with review co
ase: DSA R
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
to DSA
y DSA
eback Agreement
ontract (1)
roceed
Completion
ccupancy
d Dates – Subject to C
umber of Board of E
omments retur
Review
N/A
N/A
March 12
March 19
Septemb
October
Decembe
January 2
July 30, 2
Novembe
Novembe
Decembe
June 1, 2
August 1
Change
Education Readings
Pag
rned in May 20
2, 2013
9, 2013
ber 10, 2013
8, 2013
er 4, 2013
27, 2014
2014*
er 18, 2014*
er 18, 2014*
er 1, 2014
2016*
5, 2016*
ge | 13
014.
Duvene
New Clas
A. PROJE
Alpha
contin
the ne
surfac
In buil
ABB c
is re‐g
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
eck Elemen
ssroom Buil
ECT STATUS
Bay Builder
nued installatio
ew two‐story c
ce, casework, d
lding C (flex ro
ompleted the
grading the fiel
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project is pr
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
ntary Scho
dings and M
rs (ABB) com
on of exterior
classroom bui
drop ceilings a
om), ABB com
demolition of
ds for new sod
LE SUMMARY
T REFERENCE: 1
W:
roceeding with
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
ool
Modernizatio
mpleted exter
metal railings
lding. In build
and window in
pleted framing
the existing p
d.
1.1 – 1.2, 1.4 –
hin budget, and
$0
$9,778,358
$0
$9,778,358
$20,316
$0
$2,098,650
$7,649,835
$9,557
$9,778,358
78.8%
$703 ,772
$557,490
2.0%
Directives vs.
on
rior wall pain
s and redwoo
ding F (library)
nstallation are
g and electrica
ortables on ca
– 1.10
d should be co
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Approval by
Authorize t
BOE Approv
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated
( ) Denotes n
nting and
d soffit of
), tackable
complete.
al rough in.
ampus and
ompleted by Au
ase: Const
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
y DSA
to Bid (2)
val
g
ontract (1)
roceed
Completion
ccupancy
d Dates – Subject to C
umber of Board of E
ugust 15, 2014
truction
April 27,
May 11,
Decembe
January 1
June 14,
June 28,
February
Decembe
Decembe
January 1
February
March 12
March 25
July 26, 2
August 1
Change
Education Readings
Pag
4.
2010
2010
er 14, 2010
11, 2011
2011
2011
y 27, 2012
er 10, 2012
er 18 2012
15, 2013
y 28, 2013
2, 2013
5, 2013
2014*
, 2014*
ge | 14
Techno
A. PROJE
Equipm
during
B. BUDG
C. BOND
D. PROJE
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
logy Impro
ECT STATUS
ment orders ha
g the 2014/15 s
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies & Computers
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
ovements
ave arrived and
school year.
LE SUMMARY
T REFERENCE: 1
W:
unds
ment
y
ended
d are being de
1.5 – 1.7
$0
$10,485,054
$0
$10,485,054
$0
$6,850,644
$539,269
$3,095,142
$0
$10,485,054
89.4%
ployed to the v
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Approval by
Authorize t
BOE Approv
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated
( ) Denotes n
various campu
ase: N/A
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
y DSA
to Bid (2)
val
g
ontract (1)
roceed
Completion
ccupancy
d Dates – Subject to C
umber of Board of E
uses for use
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Change
Education Readings
Pagge | 15
Gunn H
New Clas
A. PROJE
The n
Augus
since F
B. BUDG
C. BOND
D. PROJE
Th
st
oc
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
High Schoo
ssroom Buil
ECT STATUS
ew Math and
st 15, 2013. W
February, 2013
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he World Lang
tudents on Feb
ccupied with st
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
l
dings A & B
English Buildi
World Langua
3.
LE SUMMARY
T REFERENCE: 3
W:
uages building
bruary 11, 2013
taff and studen
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
ng was occupi
ge Building cl
3.1, 3.3, 3.4
g move‐in occu
3. The Math &
nts on August
$0
$25,035,201
$0
$25,035,201
$24,948
$308,194
$3,789,909
$20,911,873
$277
$25,035,201
98.8%
$ 1,763,200
$ 126,231
9.3%
Directives vs.
ied by staff an
assrooms hav
urred on Febru
& English buildi
15, 2013. The
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Authorize t
BOE Approv
Approval by
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated
( ) Denotes n
nd students on
ve been in use
ary 8, 2013, an
ng move‐in oc
e project comp
ase: Occupancy –
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
to Bid (2)
val
y DSA
g
ontract (1)
roceed
Completion
ccupancy
d Dates – Subject to C
umber of Board of E
n
e
nd was occupie
ccurred on July
leted within bu
–August 15, 2013
March 31
April 14,
Septemb
Septemb
January 1
January 2
August 4
March 8,
March 22
May 27,
July 13, 2
July 22, 2
August 2
July 15, 2
August 1
Change
Education Readings
Pag
ed with staff an
y 15, 2013, and
udget.
1, 2009
2009
ber 8, 2009
ber 22, 2009
12, 2010
26, 2010
4, 2010
, 2011
2, 2011
2011
2011
2011
4, 2011
2013
5, 2013
ge | 16
nd
d was
Gunn H
New Gym
A. PROJE
The ne
held in
stripin
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
High Schoo
mnasium
ECT STATUS
ew gymnasium
n the new gym
ng was installed
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he new gym w
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
l
m was occupied
m on August 15,
d and complet
LE SUMMARY
T REFERENCE: 3
W:
as occupied on
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
d on June 7, 2
, 2013. The te
ed August 27,
3.4, 3.5, 3.13
n June 7, 2013
$0
$12,914,800
$0
$12,914,800
$0
$19,706
$2,461,402
$10,400,737
$32,955
$12,914,800
95.1%
$834,700
$7,909
9.9%
Directives vs.
2013 and PE cla
nnis courts sur
2013.
.
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Authorize t
BOE Approv
Approval by
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated
( ) Denotes n
asses were
rfacing and
ase: Occup
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
to Bid (2)
val
y DSA
g
ontract (1)
roceed
Completion
ccupancy
d Dates – Subject to C
umber of Board of E
pancy –June 7, 20
March 31
April 14,
Septemb
Septemb
January 1
January 2
August 4
March 8,
March 22
May 27,
July 13, 2
July 20, 2
August 1
May 1, 2
June 7, 2
Change
Education Readings
Pag
013
1, 2009
2009
ber 8, 2009
ber 22, 2009
12, 2010
26, 2010
4, 2010
, 2011
2, 2011
2011
2011
2011
, 2011
013
2013
ge | 17
Gunn H
Existing G
A. PROJE
Romko
The m
2013.
B. BUDG
C. BOND
D. PROJE
Th
N
Fund
This
budg
Chan
High Schoo
Gymnasium
ECT STATUS
on Inc. contin
modernized Bow
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project is pr
ovember 12, 2
ding and Budget
project is funded b
get. See that proje
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
l
m Moderniza
ued punch lis
w gym was oc
LE SUMMARY
T REFERENCE: 3
W:
roceeding on‐s
2013.
by the New Gymn
ect budget for stat
ency
ency Balance
ngency Balance
ges
onstruction Change
tion
t corrections
ccupied by the
3.4, 3.5, 3.13
schedule and w
asium project
tus.
$99,800
$99,800
0.0%
Directives vs.
through Nove
e campus on N
within budget.
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Authorize t
BOE Approv
Approval by
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated
( ) Denotes n
ember 2013.
November 4,
Occupancy by
ase:Close‐out / O
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
to Bid (2)
val
y DSA
g
ontract (1)
roceed
Completion
ccupancy
d Dates – Subject to C
umber of Board of E
y the school occ
ccupancy – Novem
March 31
April 14,
Septemb
Septemb
January 1
January 2
August 4
February
February
January 2
April 2, 2
April 9, 2
May 31,
October
Novembe
Change
Education Readings
Pag
curred on
mber 12, 2013
1, 2009
2009
ber 8, 2009
ber 22, 2009
12, 2010
26, 2010
4, 2010
y 12, 2013
y 26, 2013
23, 2013
2013
2013
2013
28, 2013
er 12, 2013
ge | 18
Palo Alt
Athletic S
A. PROJE
The m
new o
B. BUDG
C. BOND
D. PROJE
Th
oc
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
to High Sch
Stadium Imp
ECT STATUS
main project in
ornamental fen
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he ornamental
ccupied Septem
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
hool
provements
ncluding a con
nce, signage an
LE SUMMARY
T REFERENCE: 4
W:
l fence was com
mber 10, 2012
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
s
ncessions build
d entry lightin
4.13
mpleted on sch
. The bleache
$0
$5,090,000
$0
$5,090,000
$882
$2,746
$818,716
$4,267,656
$0
$5,090,000
93.3%
$310,200
$225,587
2.3%
Directives vs.
ding, track re‐s
g has been com
hedule in Augu
r replacement
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Authorize t
BOE Approv
Approval by
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
Bleachers
Fence Com
* Anticipated D
()Denotesnum
surfacing,
mpleted.
ust 2013. The
work was com
ase: Close‐out / O
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
to Bid (2)
val
y DSA
g
ontract (1)
roceed
Completion ‐ Con
ccupancy ‐ Conces
pletion
Dates – Subject to Chang
mberofBoardofEducat
concessions bu
mpleted on sch
Occupancy – Augus
January 2
February
June 1, 2
June 22,
February
March 8,
April 4, 2
June 28,
July 19, 2
July 26, 2
Decembe
Decembe
January 4
ncession August 3
ssions Septemb
March 31
August 1
ge
tionReadings
Pag
uilding was
hedule in June
st 1, 2013
26, 2010
y 9, 2010
2010
2010
y 22, 2011
, 2011
2011
2011
2011
2011
er 1, 2011
er 13, 2011
4, 2012
31, 2012
ber 10, 2012
1, 2013
, 2013
ge | 19
2013.
Palo Alt
Haymark
A. PROJE
All Tru
Augus
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
to High Sch
ket and Tow
ECT STATUS
usty Builders c
st 9, 2013, on s
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project com
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
hool
wer Building
completed the
schedule and w
LE SUMMARY
T REFERENCE: 4
W:
mpleted on sch
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
Improveme
e installation o
within budget.
4.1 ‐ 4.3
edule and with
$0
$1,500,000
$0
$1,500,000
$0
$62,844
$179,000
$1,258,159
$0
$1,500,000
84.2%
$39,200
$33,930
1.3%
Directives vs.
nts
of the new win
hin budget.
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Authorize t
BOE Approv
Approval by
Bid Openin
Award of C
Notice to P
Substantial
* Anticipated
( ) Denotes n
ndows on
ase: Close‐out / O
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
to Bid (2)
val
y DSA
g
ontract (1)
roceed
Completion
d Dates – Subject to C
umber of Board of E
Occupancy – Augus
N/A
N/A
N/A
N/A
N/A
N/A
May 25,
April 24,
May 6, 2
August 2
January 1
January 2
February
August 9
Change
Education Readings
Pag
st 9, 2013
2012
2012
012
4, 2012
17, 2013
29, 2013
y 21, 2013
, 2013
ge | 20
Jordan
A. PROJE
Studen
in fall
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
Middle Sc
ECT STATUS
nts occupied a
2013.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project is co
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
hool
ll new and mo
LE SUMMARY
T REFERENCE: 2
W:
ompleted on sc
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
odernized build
2.1 – 2.3, 2.6 –
chedule and w
$0
$19,891,564
$0
$19,891,564
$6,111
$86,265
$3,723,370
$16,007,031
$68,787
$19,891,564
90.4%
$1,398,700
$847,769
4.0%
Directives vs.
dings for the st
– 2.8, 2.10 – 2.1
within budget.
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Authorize t
BOE Approv
Approval by
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated
( ) Denotes n
tart of school
12, 6.3 – 6.5
ase: Close‐out / O
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
to Bid (2)
val
y DSA
g
ontract (1)
roceed
Completion
ccupancy
d Dates – Subject to C
umber of Board of E
Occupancy – Augus
October
October
June 23,
Septemb
March 23
April 27,
Decembe
June 28,
July 19, 2
October
Decembe
Decembe
Decembe
August 1
August 1
Change
Education Readings
Pag
st 15, 2013
28, 2008
30, 2008
2009
ber 8, 2009
3, 2010
2010
er 21, 2010
2011
2011
5, 2011
er 8, 2011
er 13, 2011
er 27, 2011
, 2013
5, 2013
ge | 21
J.L. Stan
A. PROJE
Studen
in fall
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
nford Midd
ECT STATUS
nts occupied a
2013.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project com
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
dle School
ll new and mo
LE SUMMARY
T REFERENCE: 2
W:
mpleted on sch
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
odernized build
2.1 – 2.3, 2.5 –
edule and with
$0
$17,184,699
$0
$17,184,699
$8,879
$144,790
$3,545,843
$13,485,187
$0
$17,184,699
89.5%
$1,057,800
$902,445
2.8%
Directives vs.
dings for the st
– 2.8, 2.11 – 2.1
hin budget. Clo
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
BOE Approv
Submit to D
Authorize t
BOE Approv
Approval by
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated Da
( ) Denotes numb
tart of school
12, 6.4, 6.5
ose‐out in prog
ase: Close‐out / O
ontract (2)
val
l Design (2)
val
Design (3)
val
val (Sitework)
DSA
to Bid (2)
val
y DSA
g
ontract (1)
roceed
Completion
ccupancy
ates – Subject to Change
ber of Board of Education
gress.
Occupancy – Augus
October
October
June 23,
Septemb
June 1, 2
June 22,
Septemb
May 6, 2
Novembe
Decembe
January 2
May 3, 2
May 8, 2
May 30,
August 7
August 1
Readings
Pag
st 15, 2013
28, 2008
30, 2008
2009
ber 8, 2009
2010
2010
ber 28, 2010
011
er 29, 2011
er 13, 2011
24, 2012
012
012
2012
, 2013
5, 2013
ge | 22
J.L. Stan
Landscap
A. PROJE
Close‐
B. BUDG
C. BOND
D. PROJE
Th
Fund
This p
proje
Perce
Chan
nford Midd
pe and Site I
ECT STATUS
‐out efforts con
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project com
ding and Budget
project is funded b
ect budget. See th
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
dle School
Improvemen
ntinued throug
LE SUMMARY
T REFERENCE: 2
W:
mpleted on sch
by the J.L. Stanford
hat project budget
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
nts
gh May 2014.
2.1 – 2.3, 2.5 –
edule and with
d Middle School
for status.
89.5%
$1,057,800
$902,445
2.8%
Directives vs.
– 2.8, 2.11 – 2.1
hin budget.
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
BOE Approv
Submit to D
Authorize t
BOE Approv
Approval by
Bid Openin
Award of C
Notice to P
Substantial
Completion
* Anticipated Da
( ) Denotes numb
12, 6.4, 6.5
ase: Close‐out / O
ontract (2)
val
l Design (2)
val
Design (3)
val
val (Sitework)
DSA
to Bid (2)
val
y DSA
g
ontract (1)
roceed
Completion
n
ates – Subject to Change
ber of Board of Education
Occupancy – Augus
October
October
June 23,
Septemb
June 1, 2
June 22,
Septemb
May 6, 2
Novembe
Decembe
January 2
May 3, 2
May 8, 2
May 23,
August 1
August 1
Readings
Pag
st 16, 2013
28, 2008
30, 2008
2009
ber 8, 2009
2010
2010
ber 28, 2010
011
er 29, 2011
er 13, 2011
24, 2012
013
013
2013
6, 2013
6, 2013
ge | 23
Terman
A. PROJE
Studen
for th
compl
B. BUDG
C. BOND
D. PROJE
Th
15
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
n Middle Sc
ECT STATUS
nts occupied t
e start of sch
eted in Octobe
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project com
5, 2013. The p
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
chool
the new instru
hool in fall 201
er 2013.
LE SUMMARY
T REFERENCE: 2
W:
mpleted on sch
project is curre
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
ctional spaces
13. The cafet
2.1 – 2.8, 2.11
edule, with ex
ntly within bud
$0
$13,312,971
$0
$13,312,971
$4,153
$75,747
$2,720,590
$10,507,733
$4,748
$13,312,971
96.7%
$929,900
$12,909
9.4%
Directives vs.
s and moderniz
torium moder
– 2.12
ception of the
dget.
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Authorize t
BOE Approv
Approval by
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated
( ) Denotes n
zed buildings
rnization was
Cafetorium, w
ase: Close‐out / O
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
to Bid (2)
val
y DSA
g
ontract (1)
roceed
Completion
ccupancy
d Dates – Subject to C
umber of Board of E
which was occu
Occupancy – Nove
October
October
June 23,
Septemb
May 11,
May 25,
Decembe
June 28,
July 19, 2
Septemb
Decembe
Decembe
Decembe
October
Novembe
Change
Education Readings
Pag
upied on Novem
mber 15, 2013
28, 2008
30, 2008
2009
ber 8, 2009
2010
2010
er 21, 2010
2011
2011
ber 1, 2011
er 6, 2011
er 13, 2011
er 27, 2011
31, 2013
er 15, 2013
ge | 24
mber
Fairmea
New Clas
A. PROJE
Studen
schoo
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
adow Elem
ssroom Buil
ECT STATUS
nts occupied
l in fall 2013.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project com
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
mentary Sc
ding and Mo
all new and m
LE SUMMARY
T REFERENCE: 1
W:
mpleted on sch
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
chool
odernization
modernized bu
1.1 – 1.2, 1.4 –
edule and with
$0
$7,796,550
$0
$7,796,550
$32,381
$98,962
$1,992,928
$5,671,159
$1,120
$7,796,550
94.2%
$642 ,300
$186,122
7.1%
Directives vs.
n
uildings for th
– 1.10
hin budget.
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Authorize t
BOE Approv
Approval by
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated
( ) Denotes n
he start of
ase:Close‐out / O
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
to Bid (2)
val
y DSA
g
ontract (1)
roceed
Completion
ccupancy
d Dates – Subject to C
umber of Board of E
ccupancy – Augus
October
October
March 23
April 6, 2
Septemb
Septemb
April 18,
October
October
Novembe
Decembe
Decembe
January 3
August 5
August 1
Change
Education Readings
Pag
st 15, 2013
13, 2009
27, 2009
3, 2010
2010
ber 14, 2010
ber 28, 2010
2011
11, 2011
25, 2011
er 14, 2011
er 5, 2011
er 13, 2011
3, 2012
, 2013
5, 2013
ge | 25
Ohlone
New Clas
A. PROJE
Move‐
occurr
on Jan
B. BUDG
C. BOND
D. PROJE
O
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
Elementa
ssroom Buil
ECT STATUS
‐in to the ne
red in Decemb
nuary 3, 2012.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
ccupancy occu
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
ary School
ding and Mo
ew building a
ber 2011. Stud
LE SUMMARY
T REFERENCE: 1
W:
urred on Janua
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
odernization
and other ex
dents occupied
1.1 – 1.2, 1.4 –
ry 3, 2012. Pro
$0
$10,597,870
$0
$10,597,870
$7,461
$49,049
$2,180,418
$8,360,942
$62,598
$10,597,870
98.9%
$748,400
$459,113
3.9%
Directives vs.
n
isting classroo
d the new build
– 1.10
oject complete
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Authorize t
BOE Approv
Approval by
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated
( ) Denotes n
oms
ding
ed on schedule
ase: Occup
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
to Bid (2)
val
y DSA
g
ontract (1)
roceed
Completion
ccupancy
d Dates – Subject to C
umber of Board of E
e and within bu
pancy –January 3
Septemb
October
March 3,
March 17
June 2, 2
June 23,
Novembe
April 27,
May 11,
May 18,
July 13, 2
August 3
August 1
Novembe
January 3
Change
Education Readings
Pag
udget.
, 2012
ber 30, 2008
14, 2008
, 2009
7, 2009
2009
2009
er 24, 2009
2010
2010
2010
2010
, 2010
9, 2010
er 18, 2011
3, 2012
ge | 26
Site Acq
525 San A
A. PROJE
This si
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
quisition
Antonio Rd
ECT STATUS
te has been le
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he site has bee
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
ased to Athena
LE SUMMARY
T REFERENCE: 1
W:
en leased to At
unds
ment
y
ended
a Academy.
1.1 – 1.2, 1.4 –
thena Academy
$0
$8,500,000
$0
$8,500,000
$0
$0
$8,500,000
$0
$0
$8,500,000
100.0%
– 1.10
y.
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Approval by
Authorize t
BOE Approv
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated
( ) Denotes n
ase: N/A
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
y DSA
to Bid (2)
val
g
ontract (1)
roceed
Completion
ccupancy
d Dates – Subject to C
umber of Board of E
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Change
Education Readings
Pagge | 27
Jordan
A. PROJE
The po
B. BUDG
C. BOND
D. PROJE
Th
M
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
*Bud
Middle Sc
ECT STATUS
ortables were
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
his project com
Move in occurre
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
dget previously exp
hools ‐ Int
installed and m
LE SUMMARY
T REFERENCE: 2
W:
mpleted ahead
ed on Septemb
unds
ment
y
ended
pended
erim Class
moved into for
2.1, 6.4, 6.5
of schedule an
ber 30, 2011.
$0
$392,120
$208,222
$600,342
$0
$0
$180,286
$419,292
$764
$600,342
76.8%*
srooms
fall 2011. DSA
nd under budg
Current Pha
Schedule:
Approval by
Authorize t
BOE Approv
Bid Openin
Award of C
Notice to P
Substantial
Occupancy
* Anticipated
( ) Denotes n
A closeout rece
get.
ase: Move
y DSA
to Bid (2)
val
g
ontract (1)
roceed
Completion
d Dates – Subject to C
umber of Board of E
eived Novemb
e‐in
June 16,
June 14,
June 28,
July 14, 2
July 20, 2
July 27, 2
Septemb
Septemb
Change
Education Readings
Pag
er 19, 2012.
2011
2011
2011
2011
2011
2011
ber 20, 2011
ber 30, 2011
ge | 28
Gunn H
Air Cond
A. PROJE
Best
condit
warra
Best.
B. BUDG
C. BOND
D. PROJE
Pr
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
High Schoo
itioning of E
ECT STATUS
Contracting S
tioning units a
nty work on t
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
roject has been
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
l
Existing Buil
Services Inc.
nd cool roof c
the cool roof
LE SUMMARY
T REFERENCE: 3
W:
n closed‐out.
unds
ment
y
ended
dings
completed th
coating in the
coating needs
3.7
$0
$2,600,000
$0
$2,600,000
$1,919
$0
$454,610
$2,120,580
$22,891
$2,600,000
80.9%
he installation
summer 2011
s to be compl
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Approval by
Authorize t
BOE Approv
Bid Openin
Award of C
Notice to P
Substantial
* Anticipated
( ) Denotes n
n of air
1. Some
eted by
ase: Comp
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
y DSA
to Bid (2)
val
g
ontract (1)
roceed
Completion
d Dates – Subject to C
umber of Board of E
pleted
March 27
April 6, 2
N/A
N/A
N/A
N/A
October
February
February
March 8,
March 28
April 8, 2
April 11,
August 8
Change
Education Readings
Pag
7, 2010
2010
20, 2010
y 10, 2011
y 22, 2011
, 2011
8, 2011
2011
2011
, 2011
ge | 29
J.L. Stan
A. PROJE
Coulte
portab
B. BUDG
C. BOND
D. PROJE
Pr
This
JLS p
nford Midd
ECT STATUS
er Constructio
bles in August
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
roject complet
portable reloca
project. Refer to
dle School
on completed
2011.
LE SUMMARY
T REFERENCE: 2
W:
ted on schedul
ation project fun
o pg. 14
‐ Interim
the work on
2.1, 6.4, 6.5
e and is curren
nded by main
Classroom
n the relocate
ntly in close‐ou
Current Pha
Schedule:
Approval by
Jordan Proj
Authorize t
BOE Approv
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated
( ) Denotes n
ms
ed
ut.
ase: Occup
y DSA
ject
to Bid (2)
val
g
ontract (1)
roceed
Completion
ccupancy
d Dates – Subject to C
umber of Board of E
pancy ‐August 11
April 19,
June 16,
May 10,
May 24,
June 1, 2
June 13,
June 20,
August 8
August 1
Change
Education Readings
Pag
, 2011
2011
2011
2011
2011
2011
2011
2011
, 2011
5, 2011
ge | 30
Fairmea
Portable
A. PROJE
Reloca
B. BUDG
C. BOND
D. PROJE
Pr
This
JLS p
adow Elem
Relocation
ECT STATUS
ation of the po
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
roject complet
portable reloca
project. Refer to
mentary Sc
Project
ortable was com
LE SUMMARY
T REFERENCE: 6
W:
ted ahead of sc
ation project fun
o pg. 14
chool
mplete and occ
6.4
chedule on Aug
nded by main
cupied on Aug
gust 8, 2011.
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Approval by
Authorize t
BOE Approv
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated
( ) Denotes n
ust 8, 2011.
ase: Occup
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
y DSA
to Bid (2)
val
g
ontract (1)
roceed
Completion
ccupancy
d Dates – Subject to C
umber of Board of E
pancy ‐August 8,
February
N/A
N/A
N/A
N/A
N/A
March 3,
March 3,
May 11,
May 24,
June 14,
June 14,
June 20,
August 1
August 8
Change
Education Readings
Pag
2011
y 15, 2011
, 2011
, 2011
2011
2011
2011
2011
2011
, 2011
, 2011
ge | 31
Elemen
Interacti
A. PROJE
Install
compl
2011.
B. BUDG
C. BOND
D. PROJE
A
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
ntary Classr
ve Whitebo
ECT STATUS
ation of Smar
eted for all e
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
ll SmartBoards
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
room Impr
ards and So
rtBoards and
elementary sc
LE SUMMARY
T REFERENCE: 1
W:
s and Lightspee
unds
ment
y
ended
rovements
ound Assist S
Lightspeed so
hool classroom
1.5 – 1.7
ed sound syste
$0
$2,004,889
$0
$2,004,889
$0
$0
$275,488
$1,729,401
$0
$2,004,889
93.9%
s
System Insta
und assist sys
ms and librari
ems installed.
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Approval by
Authorize t
BOE Approv
Bid Openin
Award of C
Notice to P
Completion
* Anticipated D
( ) Denotes num
allation
stems were
ies in April
ase: Complete ‐M
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
y DSA
to Bid (2)
val
g
ontract (1)
roceed
n
Dates – Subject to Chang
mber of Board of Educat
May 15, 2011
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Novembe
Novembe
February
March 8,
March 9,
May 15,
ge
tion Readings
Pag
er 9, 2010
er 23, 2010
y 25, 2011
, 2011
, 2011
2011
ge | 32
Palo Alt
Multi‐Us
A. PROJE
The fi
chang
B. BUDG
C. BOND
D. PROJE
Fi
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
to High Sch
se Field
ECT STATUS
elds were ava
e order negoti
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
eld was open f
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
hool
ailable for pla
ations comple
LE SUMMARY
T REFERENCE: 4
W:
for use on Feb
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
ay on Februar
ted on March
4.14
ruary 1, 2011.
$0
$2,609,680
$1,007,255
$3,616,935
$0
$1,506
$698,293
$2,916,682
$454
$3,616,935
100.0%
$269,300
$230,579
1.5%
Directives vs.
y 1, 2011, an
9, 2011.
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Approval by
Authorize t
BOE Approv
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated
( ) Denotes n
nd final
ase: Occup
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
y DSA
to Bid (2)
val
g
ontract (1)
roceed
Completion
ccupancy
d Dates – Subject to C
umber of Board of E
pancy –February
Septemb
October
N/A
N/A
Novembe
Decembe
March 19
Septemb
February
March 17
March 16
April 7, 2
June 1, 2
January 3
February
Change
Education Readings
Pag
1, 2011
ber 30, 2008
14, 2008
er 18, 2008
er 09, 2008
9, 2009
ber 30, 2009
y 24, 2009
7, 2009
6, 2010
2010
2010
31, 2011
y 1, 2011
ge | 33
Gunn H
Industria
A. PROJE
This fa
receiv
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
High Schoo
al Arts Addit
ECT STATUS
acility was ava
ed on July 18,
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he building occ
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
l
tion and Ren
ilable for instr
2011.
LE SUMMARY
T REFERENCE: 3
W:
cupied as sche
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
novation
ruction in Janu
3.1, 3.7, 3.11
duled, and the
$0
$5,082,402
$0
$5,082,402
$1,061
$88,985
$1,002,057
$3,990,300
$0
$5,082,402
99.3%
$349,000
$141,967
41.6%
Directives vs.
uary 2010. DSA
e project comp
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Approval by
Authorize t
BOE Approv
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated
( ) Denotes n
A closeout
pleted within b
ase: Occup
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
y DSA
to Bid (2)
val
g
ontract (1)
roceed
Completion
ccupancy
d Dates – Subject to C
umber of Board of E
udget.
pancy –January 4
N/A
N/A
N/A
N/A
N/A
N/A
June 17,
Decembe
October
October
Decembe
Decembe
January 6
Novembe
January 4
Change
Education Readings
Pag
, 2010
2008
er 24, 2008
14, 2008
28, 2008
er 16, 2008
er 24, 2008
6, 2009
er 25, 2009
4, 2010
ge | 34
Gunn H
Aquatic C
A. PROJE
This fa
out wi
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Chan
High Schoo
Center
ECT STATUS
acility was ava
ith DSA.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
his project com
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang
(Change Orders + C
Original Contract)
l
ailable for use
LE SUMMARY
T REFERENCE: 3
W:
mpleted within
unds
ment
y
ended
ency
ency Balance
ngency Balance
ges
onstruction Change
in July 2009,
3.12
budget.
$0
$4,865,423
$0
$4,865,423
$0
$0
$647,169
$4,218,253
$0
$4,865,423
99.9%
$389,887
$195,148
49.9%
Directives vs.
and has been
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Approval by
Authorize t
BOE Approv
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated
( ) Denotes n
n closed
ase: Occup
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
y DSA
to Bid (2)
val
g
ontract (1)
roceed
Completion
ccupancy
d Dates – Subject to C
umber of Board of E
pancy –June 15, 2
N/A
N/A
N/A
N/A
N/A
N/A
Decembe
April 24,
April 8, 2
April 22,
May 28,
June 4, 2
Decembe
June 15,
June 15,
Change
Education Readings
Pag
2009
er 11, 2007
2008
2008
2008
2008
2008
er 6, 2008
2009
2009
ge | 35
Middle
Jordan, J
A. PROJE
AEDIS
Board
progra
projec
transf
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
School Pre
J.L. Stanford
ECT STATUS
presented rec
of Education
am documents
cts for pre‐de
erred to the pr
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
his project has
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
e‐Design
d and Terma
commended co
for approval o
s for the new
sign work hav
rogram conting
LE SUMMARY
T REFERENCE: 2
W:
been complet
unds
ment
y
ended
n
oncept plans fo
on September
w projects at
ve been close
gency on June
2.1 – 2.12
ted. Board app
$0
$56,488
$0
$56,488
$0
$0
$56,488
$0
$0
$56,488
96.8%
or each campu
8, which beca
each campus.
ed, and funds
14, 2011.
proval received
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Approval by
Authorize t
BOE Approv
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated
( ) Denotes n
us to the
ame the
These
will be
d on Septembe
ase: Comp
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
y DSA
to Bid (2)
val
g
ontract (1)
roceed
Completion
ccupancy
d Dates – Subject to C
umber of Board of E
er 8, 2009.
plete
October
October
June 23,
Septemb
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Change
Education Readings
Pag
28, 2008
30, 2008
2009
ber 8, 2009
ge | 36
Garland
Campus
A. PROJE
The Bo
hold u
The b
June 2
at the
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
d Elementa
Modernizat
ECT STATUS
oard of Educat
until a growth p
oard voted to
2011. Discussio
elementary sc
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
his project has
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
ary School
tion
tion has put ne
plan is establis
terminate the
ons with the B
chools are ongo
LE SUMMARY
T REFERENCE: 1
W:
been placed o
unds
ment
y
ended
ew developme
shed for the ele
e lease with S
oard on future
oing.
1.1, 1.4 – 1.10
on hold.
$0
$22,178,544
$0
$22,178,544
$0
$0
$3,915,789
$17,400,000
$862,755
$22,178,544
1.3%
ent for Garland
ementary scho
Stratford Schoo
e plans for gro
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Approval by
Authorize t
BOE Approv
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated
( ) Denotes n
d on
ools.
ol in
owth
ase: On Ho
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
y DSA
to Bid (2)
val
g
ontract (1)
roceed
Completion
ccupancy
d Dates – Subject to C
umber of Board of E
old
October
October
February
February
June 2, 2
June 23,
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Change
Education Readings
Pag
28, 2008
30, 2008
y 10, 2009
y 24, 2009
2009
2009
ge | 37
High Sc
Palo Alto
A. PROJE
The Bo
high s
transf
B. BUDG
C. BOND
D. PROJE
M
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
hool Mast
o HS and Gu
ECT STATUS
oard of Educat
schools, and t
erred to the re
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
Master planning
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
ter Plan
nn HS
tion (BOE) app
these projects
espective camp
LE SUMMARY
T REFERENCE: 3
W:
g effort comple
unds
ment
y
ended
proved the ma
s have been c
pus reserve fun
3.1 – 3.14, 4.1
ete.
$0
$285,387
$0
$285,387
$0
$0
$285,387
$0
$0
$285,387
86.2%
aster plans for
closed, with f
nds.
– 4.14
Current Pha
Schedule:
Architect Co
BOE Approv
Initial Mast
BOE Approv
Paly CEQA A
BOE Approv
Gunn Mast
BOE Approv
Gunn CEQA
BOE Approv
Master Plan
Paly MP Re
Gunn MP R
* Anticipated
( ) Denotes n
both
funds
ase: Comp
ontract (2)
val
ter Plan Approval (
val
Approval (2)
val
ter Plan Update (2
val
A Approval (2)
val
n Revision Approv
evision Approval (2
Revision Approval
d Dates – Subject to C
umber of Board of E
plete
March 31
April 14,
(2) Septemb
Septemb
February
February
) March 23
April 6, 2
April 27,
May 11,
val (2) Septemb
2) October
(2) October
Change
Education Readings
Pag
1, 2009
2009
ber 8, 2009
ber 22, 2009
y 9, 2010
y 23, 2010
3, 2010
2010
2010
2010
ber 14, 2010
9, 2010
12, 2010
ge | 38
Hoover
Pre‐Desig
A. PROJE
This p
eleme
B. BUDG
C. BOND
D. PROJE
Pr
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
Elementa
gn
ECT STATUS
roject has bee
entary schools.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
roject is curren
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
ary School
n put on hold
LE SUMMARY
T REFERENCE: 1
W:
ntly on hold.
unds
ment
y
ended
until a growth
1.1 – 1.2, 1.4 –
$0
$70,550
$0
$70,550
$0
$0
$70,550
$60
$0
$70,550
81.0%
plan is establi
– 1.10
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Approval by
Authorize t
BOE Approv
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated
( ) Denotes n
ished for the
ase: On Ho
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
y DSA
to Bid (2)
val
g
ontract (1)
roceed
Completion
ccupancy
d Dates – Subject to C
umber of Board of E
old
April 27,
May 11,
Novembe
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Change
Education Readings
Pag
2010
2010
er 9, 2010
ge | 39
Elemen
A. PROJE
DSA co
new li
replac
Carme
on ho
growt
B. BUDG
C. BOND
D. PROJE
Th
Fund
State
Stron
Othe
Tota
Budg
Salar
Supp
Cont
Cons
Soft
Tota
Perce
ntary Classr
ECT STATUS
omments were
ighting, adding
cement of cei
elo elementary
old pending fu
h planning.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
his project has
ding
e Funds
ng Schools Bond F
er Funding
l
get
ries and Benefits
plies
racts & Services
struction & Equipm
Costs Contingency
l
ent of Budget Expe
room Impr
e returned to G
g operable win
iling tiles for
y schools. The
urther discussi
LE SUMMARY
T REFERENCE: 1
W:
been placed o
unds
ment
y
ended
rovements
Gelfand for Ph
ndows and cov
classrooms a
e authorization
ons with the
1.5 – 1.7
on hold.
$0
$2,004,889
$0
$2,004,889
$0
$0
$275,488
$1,729,401
$0
$2,004,889
93.9%
s
ase 1 plans th
verings, ventila
at Barron Par
n to bid has be
BOE about el
Phase 1 Sch
Current Pha
Schedule:
Architect Co
BOE Approv
Conceptual
BOE Approv
Schematic D
BOE Approv
Submit to D
Approval by
Authorize t
BOE Approv
Bid Openin
Award of C
Notice to P
Substantial
Planned Oc
* Anticipated D
( ) Denotes num
at include
ation, and
rk and El
een placed
lementary
hools: Barron Park
ase: On Hold
ontract (2)
val
l Design (2)
val
Design (2)
val
DSA
y DSA
to Bid (2)
val
g
ontract (1)
roceed
Completion
ccupancy
Dates – Subject to Chang
mber of Board of Educat
k and El Carmelo
June 8, 2
June 22,
N/A
N/A
Novembe
Decembe
Decembe
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
ge
tion Readings
Pag
2010
2010
er 9, 2010
er 7, 2010
er 23, 2010
ge | 40
OHS WEST:260388860.1 A-1
EXHIBIT A
PALO ALTO UNIFIED SCHOOL DISTRICT
BOND PROJECT LIST
[Note: The order in which projects are listed is not an indication of priority for funding or completion. Not all listed
projects will be completed at every site.]
1. ELEMENTARY SCHOOL PROJECTS
Addison Barron Park Briones Duveneck El Carmelo
Escondido Fairmeadow Garland Greendell Hays
Hoover Nixon Ohlone Palo Verde
1. Construct new permanent classrooms and classroom buildings to accommodate enrollment
growth and expanded programs.
2. Replace temporary classrooms with permanent classrooms.
3. Acquire and install modular classrooms, as needed.
4. Expand libraries to accommodate enrollment growth.
5. Improve or provide new security systems, including alarms, lighting, locks, monitoring
systems, fencing, etc.
6. Upgrade climate control systems, including passive technologies to conserve energy, such as
shade canopies, energy-efficient windows, window coverings and shade control;
install/replace heating, ventilation and air conditioning.
7. Install/improve local area network (LAN) and wide area network (WAN) infrastructure to
accommodate technology upgrades; install/upgrade communications systems.
8. Building exterior and building shell renovation, including seismic structural upgrades and
Americans with Disability Act (ADA) improvements to bring all buildings to current code;
roofs; repainting and/or resurfacing.
9. Classroom and other school facilities modernization and building interior improvements,
including infrastructure and major building system upgrades.
10. Modernization/replacement of administration/multipurpose/library space.
Numbers Added
A-2
OHS WEST:260388860.1
2. MIDDLE SCHOOL PROJECTS
David Starr Jordan Jane Lathrop Stanford Terman
1. Construct new permanent classrooms and classroom buildings to accommodate enrollment
growth and expanded programs.
2. Classroom and other school facilities modernization and building interior improvements,
including infrastructure and major building system upgrades.
3. Construct extra school-wide storage space.
4. Expand classrooms and classroom wings, library and administration spaces.
5. Improve or provide new security systems, including alarms, lighting, locks, monitoring
systems, fencing, etc.
6. Upgrade climate control systems, including passive technologies to conserve energy, such as
shade canopies, energy-efficient windows, window coverings and shade control;
install/replace heating, ventilation and air conditioning.
7. Install/improve local area network (LAN) and wide area network (WAN) infrastructure to
accommodate technology upgrades; install/upgrade communications systems.
8. Renovate gymnasium, including new gym floors, doors, windows, bleachers and athletic
equipment; upgrade building infrastructure, including power and water distribution.
9. Renovate swimming pool and pool deck; new filtration system; new storage and restrooms;
upgrade pool equipment.
10. Replace and/or improve play fields, including drainage and irrigation, install water meters;
replace landscaping; re-surface and re-stripe hardcourts and replace outdoor athletic
equipment.
11. Repair/Replace and/or improve concrete walkways and asphalt; canopies; parking lot and
driveways.
12. Building exterior and building shell renovation, including seismic structural upgrades and
Americans with Disability Act (ADA) improvements to bring all buildings to current code;
roofs; repainting and/or resurfacing.
A-3
OHS WEST:260388860.1
3. GUNN HIGH SCHOOL PROJECTS
1. Construct new permanent classrooms and classroom buildings to accommodate enrollment
growth and expanded programs.
2. Demolish old library building.
3. Replace temporary classrooms with permanent classrooms.
4. Construct additional restrooms.
5. Construct second gymnasium.
6. Construct new soccer field.
7. Upgrade climate control systems, including passive technologies to conserve energy, such as
shade canopies, energy-efficient windows, window coverings and shade control;
install/replace heating, ventilation and air conditioning.
8. Install/improve local area network (LAN) and wide area network (WAN) infrastructure to
accommodate technology upgrades; install/upgrade communications systems.
9. Building exterior and building shell renovation, including seismic structural upgrades and
Americans with Disability Act (ADA) improvements to bring all buildings to current code;
roofs; repainting and/or resurfacing.
10. Improve or provide new security systems, including alarms, lighting, locks, monitoring
systems, fencing, etc.
11. Classroom and other school facilities modernization and building interior improvements,
including infrastructure and major building system upgrades.
12. Replace swimming pool with new 35-meter pool, pool equipment and support structures,
pool decking, bleachers, storage, restrooms, showers, associated equipment.
13. Renovate gymnasium; interior renovation including gymnasium floors and bleachers; replace
athletic equipment.
14. Modernize football stadium, including new bathrooms and concession stands.
A-4
OHS WEST:260388860.1
4. PALO ALTO HIGH SCHOOL PROJECTS
1. Construct new permanent classrooms and classroom buildings to accommodate enrollment
growth and expanded programs.
2. Replace temporary classrooms with permanent classrooms.
3. Construct additional restrooms.
4. Upgrade climate control systems, including passive technologies to conserve energy, such as
shade canopies, energy-efficient windows, window coverings and shade control;
install/replace heating, ventilation and air conditioning.
5. Install/improve local area network (LAN) and wide area network (WAN) infrastructure to
accommodate technology upgrades; install/upgrade communications systems.
6. Building exterior and building shell renovation, including seismic structural upgrades and
Americans with Disability Act (ADA) improvements to bring all buildings to current code;
roofs; repainting and/or resurfacing.
7. Classroom and other school facilities modernization and building interior improvements,
including infrastructure and major building system upgrades.
8. Library modernization and building interior improvements, including infrastructure and
major building system upgrades.
9. Renovation or replacement of the Tower Building to accommodate administration,
classroom and program support space.
10. Renovate Main Gymnasium and second gymnasium, including seismic upgrades; accessibility
improvements; construction of new restrooms; install new roofing; replace doors and
windows; replace gymnasium floors and athletic equipment, bleachers and renovation of
interior. Renovation or replacement of weight training facility.
11. Construct new theater building.
12. Renovate and improve soccer field, including new retaining wall and bleachers; new fencing
and storage.
13. Modernize football stadium, including replace bleachers; new bathrooms and concession
stands.
14. Replace and/or improve play fields, including drainage and irrigation, install water meters;
replace landscaping; re-surface and re-stripe hardcourts and replace outdoor athletic
equipment.
A-5
OHS WEST:260388860.1
5. OTHER DISTRICT-WIDE PROJECTS
Furnishing and equipping of existing and newly constructed, modernized or rehabilitated classrooms
and facilities on an ongoing basis, including to replace worn, broken, or out-of-date furniture and
equipment for all classrooms, athletic facilities and other facilities, as needed.
1. Replace existing or acquire new computers, technology and related equipment on an ongoing
basis.
2. Establish a planned maintenance fund to address maintenance work expected to be needed to
all District facilities on an ongoing basis (other than as may be necessary for current
maintenance, operation or repairs), in order to implement the District’s comprehensive facilities
maintenance plan.
3. Acquisition of any of the facilities on the Bond Project List through temporary lease or lease-
purchase arrangements, or execute purchase option under a lease for any of these authorized
facilities.
4. If and as opportunities become available, and to the extent the Board of Education determines
that bond funds are available for the purpose, acquisition of land and other interests in real
property for future school buildings and other District facilities, and construction of such
facilities, and rehabilitation/renovation of District-owned buildings and sites not otherwise
listed.
5. Repair, upgrade, modify, expand, refinish, replace and construct site improvements, including
off-street parking areas, pickup/dropoff, signage, paths, sidewalks and walkways, canopies, hard
courts (student play areas), athletic play fields, landscaping, irrigation, permanent athletic field
equipment and facilities (including nets, basketball standards, goals and goalposts, backstops),
field lighting, etc.
6. ADDITIONAL NECESSARY AND INCIDENTAL PROJECTS
1. Remove, dispose of, and otherwise remediate hazardous materials, including asbestos, lead,
etc., where necessary.
2. Address unforeseen conditions revealed by construction/modernization (including plumbing
or gas line breaks, dry rot, seismic, structural, etc.).
3. Other improvements required to comply with existing building codes, including the Field Act,
and access requirements of the Americans with Disabilities Act (ADA).
4. Site preparation/restoration in connection with new construction, renovation or remodeling,
or installation or removal of relocatable classrooms, including ingress and egress, demolition
of existing structures, removing, replacing, or installing irrigation and drainage, utility lines
(such as gas lines, water lines, electrical lines, sewer lines, and communication lines), trees and
landscaping, relocating fire access roads, traffic lights and mitigation, and acquiring any
necessary easements, licenses, or rights of way to the property.
5. Rental or construction of storage facilities and other space on an interim basis, as needed to
accommodate construction materials, equipment, and personnel, and interim classrooms
(including relocatables) for students and school functions or other storage for classroom
materials displaced during construction.
A-6
OHS WEST:260388860.1
7. RENOVATION/MODERNIZATION (DEFINED)
For purposes of the Bond Project List, renovation and modernization projects are intended to
restore the building systems and infrastructure, weather protections, finishes, and technology, or
reallocate and reorganize space, to a condition that will provide a sustainable, functional educational
and administrative environment for future years, comparable to new construction.
Renovation projects may include, but are not limited to nor necessarily encompass, all of the
following, depending upon the age, condition and needs of each particular school facility:
1. upgrade electrical, communication, fire alarm, and similar building systems as well as main
power service and distribution, which may include active and passive solar power and
heating system acquisition, installation and construction
2. Replace, repair or upgrade plumbing, piping and drainage systems, including water supply,
meters, water heating, and wastewater systems, plumbing fixtures and sinks, etc., within
buildings and sites and to connect with city supply and drainage systems
3. Replace or modify aging heating, ventilation and air cooling systems with energy-efficient
heating and air cooling systems (HVAC), including installing energy management systems
(EMS);
4. Replace, modify, upgrade interior lighting and exterior safety/security lighting systems and
fixtures, as necessary;
5. Repair, modify and construct structural elements of the existing structure as necessary;
6. Replace or repair aging roofs with similar materials or District standard materials;
7. Replace, repair, install and construct, as necessary, interior walls, floor and ceiling finishes,
doors, door locks, windows, cabinets and casework, and equipment attached to wall surfaces
(including white boards, marker boards, tack boards, television mounts, scoreboards, fire
extinguishers, kitchen cabinets/equipment, etc.);
8. Upgrade, modify and construct restroom facilities;
9. Comply, as necessary, with Americans with Disabilities Act (ADA) and Title 24
requirements;
10. Refinish the exterior finishes of the school (including stucco, wood and metal trims, wood
siding, paint, etc.); replace doors and windows
11. Modify, expand, separate, convert and construct school support areas; staff work and lunch
areas; and educational areas to provide adequate, functional environments;
12. Modify, replace and construct functional components of altered or replaced building
components (including rainwater leaders, fascias, mansards, etc.);
For any project involving renovation, modernization, remodeling or rehabilitation of a
building or the major portion of a building, the District may proceed with new replacement
construction instead (including any necessary demolition), if the Board of Education
determines that replacement and new construction is more practical than rehabilitation and
renovation, considering the building’s age, condition, expected remaining life, comparative
cost, and other relevant factors.